Post Job Free

Substation resumes in Hyderabad, Telangana, India

Sign in
Search for: Jobs   Resumes


distance:
Resume alert Resumes 101 - 110 of 288

Electrical Engineer Engineering

Hyderabad, Telangana, India
... Supported and directed substation technicians in testing, troubleshooting, maintaining, and upgrading systems and RMU's. Coordination with consultant, client and sub-contractors for timely completion of all project activities SUMMARY: Planning and ... - 2020 Nov 24

Power Plant Engineer

Hyderabad, Telangana, India
... DESCRIPITION: Our main aim is to generate electrical energy by using coal and used to distribute the power from generated station to substation. MAJOR PROJECT: Name of the Project : Design of electric vehicle and battery charger Duration : 3 months ... - 2020 Nov 23

Power Electrical

Hyderabad, Telangana, India
... Board of Intermediate Education A.P Model jr college Laveru 89.1% SSC Board Of Secondary Education Z.P.H.school Mettavalasa 8.8 Programming Languages: C MATLAB & PSPICE Completed internship at APTRANSCO 400/220KV Substation in Visakhapatnam . ... - 2020 Nov 21

Power Plant Engineer

Hyderabad, Telangana, India
... • 132/33kV_WBSETCL_GIS Burdwan_Bagnan • 132KV_MPPTCL_Trafo-Hv & Feeder Bajaj Electricals • 33/11kv_WBSETCL_Subhasgram Substation • 66/11 KV_HPSEB_Substation project Bagho-Sandhu • 132/33Kv_MSETCL_S/S at Gosikhurd • 132/33kV_JUSNL_JasidihS/s_Gepdec ... - 2020 Nov 20

Engineering Electrical

Hyderabad, Telangana, India
... • Substation maintenance and operation and control. Additional Information: Date of Birth : 14 JULY 1995 Marital Status : Unmarried Gender : Male Father’s Name : G Srinivasa Chary Languages Known : English, Telugu, Hindi Declaration: I hereby ... - 2020 Nov 19

Electrical Engineer Site

Hyderabad, Telangana, India
... 12MW*3no’s and 4MW*3no’s Synchronous motors with 132/11Kv substation. 2) Sripada Sagar Lift Irrigation Project – Jogapur Pump House, Telangana. 2.9 MW*4no’s and 1MW*2 Induction motors. Responsibilites Undertaken: Operation of 12 MW synchronous ... - 2020 Nov 19

Power Plant Electrical

Hyderabad, Telangana, India
... Study of 33/11KV Falaknuma Substation in 2019. 2. Participated in workshop on “Industrial Automation using PLC and SCADA” in 2018. INTERNSHIPS: 1. An internship at KTPS in 2019 on “A Unit of Overview of Thermal Power Plant and Detailed Study of 6 ... - 2020 Nov 19

Digital Sales

Hyderabad, Telangana, India
... Daily report generator Guide: Dr.Pradeep Yemula August 2019 - April 2020 Used python script and MySQL commands to extract data from cems.iith.ac.in to generate a report showing the daily power consumption of substation data in IIT Hyderabad campus. ... - 2020 Nov 19

Maintenance Technician

Hyderabad, Telangana, India
... 3 phase Motors & Pumps Maintenance and Servicing All Electrical Works & Parallel Wiring Operation & Maintenance of 33KV/440Volts Substation Operation & Maintenance of 1250KVA Transformers & 2200KVA DG Sets Operation & Maintenance of HT & LT Breakers ... - 2020 Nov 18

Industrial Training Engineering

Hyderabad, Telangana, India
... TRAINING : ● Completed Industrial training in 132/33KV Substation at Geesugonda,Warangal(During Engineering in Diploma). ● E-CAD Training by State Board Of Technical Engineering & Training(SBTET) . ● PGDCA Computer training from Softech Institution. ... - 2020 Nov 18
Previous 8 9 10 11 12 13 14 Next