Kevin O’Keeffe

*** ****** ****

Weirton WV *****

928-***-****

g0x2cb@r.postjobfree.com

Engineering professional with strong Electrical, Mechanical, and I&C background. Seeking employment in South Florida .

PROFESSIONAL LICENSES AND SOCIETIES: Electrical License: New Zealand. A-443672. ICBO INSPECTOR [USA]

Electrical License: Australia C-19724

EDUCATION AND PERSONNEL DEVELOPMENT PROGRAMS:

DEGREE, CERT., ETC. SCHOOL MAJOR (OR SUBJECT) DATE

Department of Education

Queensland, Australia Electrical Fitters and Mechanic

Apprenticeship Trade Course 1982-1986

Wilwrick Technical Institute

Sacramento, California Building Inspector

Electrical Inspector

Mechanical Inspector

Plans Examiner 1994

Building Inspector and Plans Examiner Course

EMT 1

Honeywell 9000 Controller Course 1995

Allen Bradley PLC. Course

Electric ICBO Training

Drug in Workplace Detection Course

Safety and CPR Training

HAZMAT and Fire Control Training

Employee Management Training

Bechtel - Attended 3-day Instructor Led Training Fundamental Primavera Project Planner 3.1 2006

Bechtel – Completed online Milestone Professional 2006

OTHER SIGNIFICANT INFORMATION:

(Language Capabilities, Assignment Preferences, Computer Skills & Outside Activities)

MAJOR WORK AREA OF EXPERTISE:

Honeywell 3000/9000 controllers, Allen Bradley PLCs, Blueprint reading, Fisher controls, Electric ICBO Training and Inspections, Building inspector (electrical) General Electric [G-2] PLCs. Computer skills: Milestones Professional, P3 3.1, Microsoft Excel, Microsoft Outlook, Microsoft Word, Microsoft Project, etrack, PunchWorks, Milestone Professional, Fundamental Primavera Project Planner 3.1,Infoworks, Setroute and Infoworks. Language: Spanish

SECOND AREA: EMT 1

THIRD AREA:

SPECIALTY:

WORK HISTORY

DATES

COMPANY OR DEPARTMENT POSITION HELD, SUMMARY OF RESPONSIBILITIES AND

From To LOCATION AND SUPERVISOR SIGNIFICANT ACCOMPLISHMENTS

01/08 Present Bechtel Power Corporation

Startup

Sammis Project

Stratton OH

Craig Hayes Startup Electrical Engineer.

I Started the Sammis project in the home office in Fredrick MD. I worked on scoping of systems, Preparing Relay testing contracts and general get ready for the startup of the project. In March I was then transferred to the project where my duties include the commissioning and maintenance of the Waste Water Treatment System, Ball Mills, Limestone Conveyers, Limestone Unloading, Gypsum Conveyers, Dewatering System and various load centers and power distribution systems. I have been involved in all the control and PLC systems. I have created data bases for the tracking of quantities maintenance records and weekly quantities reports to project controls. I then became the Lead Engineer for support for the night shift.

10/07 01/08 Bechtel Power Corporation

Startup

Elm Road Project

Oak Creek WI

Dale Mather. Startup Electrical and Controls Engineer.

I started this project as a Planner and then was transferred back to the Startup Department. I Responsible for loop testing, makeup test packages for graft testing, turnover packages, prepare FCNs, DRs, and as-built drawings. I continued to do Electrical testing VFD Programming and I&C Calibrations. I was involved in operations system support where I trouble-shot and corrected problems with little down time and supported coal handling operations.

06/07 10/07 Bechtel Power Corporation

Project Controls.

Fredrick M.D

Andrew Dudley Planner Central Services Assigned to the Project Controls Team in Fredrick, Maryland, where I was part of the Central Services Team. I learned how to complete Development schedules, level 1, level 2 and level 3 schedules. I have attended P3 instructor led training. Proposal schedules worked on included Trinidad Acola, Dabhol, KFx, WLP, Red rock, Colusa, Rijnmond 2, Unistar. Assisted Sandow on Primavera and Quang Ninh Milestone Schedule updates. I have carried out and competed work assigned to me.

05/05 06/07 Bechtel Corporation.

Springerville Power Project.

Springerville AZ

Mr. Richard Schuster

Startup Electrical Engineer Startup and commissioning of the following systems: Water treatment, Raw water, UPS and all of the related DC systems, Potable water, Auxiliary steam, Dematerialized water system, Plant service water, Fuel oil supply system, Fire protection, Primary/Secondary air system and all the DCS control power destitution. All systems are now in service and all documentation such as turnover packages, Test records, Design changes and as built drawings are completed. Performed maintenance and plant support on all systems.

10/03 05/05 Bechtel Corporation (BNI)

Operation and Maintenance

Aberdeen Chemical Agent Neutralization Facility (ACANF)

Edgewood, MD

Maintenance I&E Engineer Carried-out maintenance work orders, plant support and troubleshoot electrical and instrumentation faults. Obtained extensive training in Hazmat and Hazardous chemicals for the Neutralization Facility.

02/03 10/03 Bechtel Corporation

Athens Power Project

Athens, New York

Mr. Alan Sticher

Startup Electrical Engineer

Competition of lube oil system, Seal oil system, Fin fan cooling system, Chemical injection, waste water system, Condensate system and fire system. All systems were commissioned & put into service. Client turnover packages, as built drawings, design changes, setroutes, block diagrams and electrical schematics turned over to the client. Punch list item’s were worked and completed to the client’s satisfaction. Towards the end of the project I worked the night shift, Plant support and punch list cleanup.

11/01 02/03 Cottonwood Power Project (I.N.A.)

Deweyville, TX

Mr. Don Sweeny Startup Electrical Engineer

Completion of the following systems for the Cottonwood Project:

1-WL-01 Cooling Towers, 1-WL-02 Aux. Cooling water, 1-TL-01 Cooling Tower Chemical Injection, 1-AJ-01 Boiler Chemical Injection, 1-JA-01 Boiler Sampler System, 1-SA-01 Auxiliary Steam, 1-FG-01 Fuel Gas Start-up Heaters, 1-PF-01 Fire Water Pumps, 1-BS-01 Ammonia Injection, 1-WR-01 Water Treatment, 1-WD-01 Demineralized Water System, & 1-XW-01 Waste Water System. All systems were commissioned & put into service. Client turnover packages, as built drawings, design changes, setroutes, block diagrams and electrical schematics turned over to the client. Punch list item’s were worked and completed to the client’s satisfaction.

08/01 11/01 Lebec CA

National Cement Company

Startup and Operating Services

[Shut Down]

Mr. Gordon Stevens Responsibilities included Startup testing of motor control circuits. Troubleshooting of loops and PLC configuration, calibration of pressure, flow, level and weigh scales. Startup of belt conveyors & feeders. Assisting the client in the startup of the plant. As built dwg’s updates.

05/01 07/01 Home Office Fredrick, M.D.

Startup and Operating Services

Supervisor

Mr. Jospeh Diaz Millmerran Power Project [Australia] Startup Scoping of P&Ids Block diagrams and scoping cables in setroute. Correcting Electrical Dwg’s & Setroute.

04/00 O4/01 Bechtel Corporation

Startup and Operating Services

Red Hills Project Ackerman, MS

Mr. G. Hayes

Start-Up Electrical Engineer Responsible for the testing and commissioning of the following systems: FL -- turbine lube oil, FEH -- turbine seal oil, FJT-- turbine contr5ol oil, SL-- gland seal steam, all the above for Toshiba; TW--water treatment (AquaChem); AF--feedwater heaters, vents & drains; HFA1/2--baghouse; SA-- aux. steam, HGA1/2--bed ash; HFA1/2--ash silos; HLA1/2--limestone injection; VB1-9--HVAC systems. This included supervising electrical and instrument techs and performing all testing in accordance with NEMA and electrical codes and procedures and standards for the industry. Interfaced with various engineer groups, vendors, and vendor reps. After testing, turnover packages were built ensuring design changes, setroutes, block diagrams, electrical schematics, and punchlists were turned over to the client.

1997 2000 Whangarei, New Zealand Senior Electrical / I&C Engineer Provided electrical support for lift companies in the following: Low voltage substations & load centers, Lift controls and Instrumentation, and System checkout on new Micronics 10 Lift Controls.

1995 1997 Formica Corporation

Roseville, California Superintendent for Plant Maintenance, Electrical and Mechanical Responsible for ensuring work safety, maintaining plant operations, monitoring stores, and keeping records up to date. Performed trouble shooting of programmable logic controllers (PLCs) and variable frequency drive units, and performed continuous upgrading of plant systems to ensure compatibility with existing plant systems. Involved in the design and installation of robotics arm unit and scanner for product identification. Gained people management skills

1990 1994 Y.P. Inc.

Roseville, California Electrician/Instrumentation Technician Contracted to power companies to install EMS systems and PLC systems. Updated design drawings, generated as-built drawings, and Page 6 of 7 submitted documentation to engineering.

1988 1989 PG&E Company

Northern and Central California Electrical Supervisor Supervised a five-man crew to install EMS systems in all outlying power stations and weather stations throughout northern and central California. This project also involved installing a bird strike system, precommissioning, and placing system on line via microwave to San Francisco from various outlying power stations.

1986 1988 Webet Construction Company

Sacramento, California Electrician

00/84 00/86 James Watt Company

Marsden Point Oil Refinery

New Zealand Electrical Fitter and Mechanical Instrumentation Technician Handled control room duties, including field workshop calibration, loop testing, control system precommissioning, control system wiring, modifications, safeguard system testing, and impulse line pressure testing and installation of field instruments. Installed instrumentation multi-core computer systems, cables, Honeywell control cabinets, instrument ground system, and extensive cross wiring for the control system.

Requested by client New Zealand Oil Refinery to complete startup stage. This consisted of quality control on all instrumentation systems, including Rosemount pressure levels and temperature transmitters, configuration checks and changes to Honeywell TDC 3000 control system, loop testing, and safeguard testing (simulating plant operation). Installed and calibrated proximity trip cards, milliamp trip cards, millivolt trip cards, and relay cards. Calibrated chart recorders and field transmitters, and completed all precommissioning calibrations. Startup procedures involved modifications to control room instrumentation requiring configuration changes.

00/82 00/84 James Watt Company

Boyne Aluminum Smelter

Australia Electrical Apprentice For this 884 pot line smelter, assembled cable trays and conduits, and installed control cabinets with extensive cross wiring and termination of junction boxes and control cabinets. Gained experience on construction of high voltage power lines, substation power distribution service, and pot lines involving installation of conduit, cable trays, conveyor system limit switch solenoids, photocell PLC units, and control stations. Installed fire alarm system and warning directory panel, control room wiring, graphic displays, chart recorders, and emergency shutdown controls. Involved in maintenance program that consisted of routine checks of alarm systems and conveyors, and replaced faulty motors, solenoids, and limit switches.



Contact this candidate