Curriculum vitae
[pic]
Mr. Set Wongsomsri
Personal Data
Nationality : Thai
ID No. : 3-450*-*****-** 4
Religion : Buddhism
Date of birth : May, 01, 1974. Age 38 Years
Sex : Male
Body built : Health - Excellent. Height - 160 cm.
Weight - 55 kg.
Marital Status : Married
Home Address : 9/91 Lally view village, Thepharak Rd,
T.Preaksa, A.Muang
Samuthprakarn province,
Thailand, 10280
Home Phone : +66 (0) 2 334 2182 (Thailand)
Cell Phone : +66 (0-81-928-**** (Thailand)
Passport No. : V 921903 (Issue 27- Sep-2011-
Exp. 26- Sep- 2016)
E-Mail ad dress : ecml77@r.postjobfree.com
Education : Certificate of Vocational,
(Building Construction Technology Program)
Kalasin
Technical College, Thailand.
QUALIFICATION AND PROFESSIONAL COURSE
ASNT SNT-TC-1A NDT. Level - II - MT /PT/VT/RT/UT (EXPIRE APRIL' 2016)
Course Attendance CSWIP Welding inspector 3.1 (WIS 5)
SUMMARY PROFILE
Since year 1995 or more than 17+ years has been involving in
technical engineering, fabrication, construction and inspection in oil &
Gas for onshore/Offshore, Quality control, Inspection, Examination and
testing including pre-fabrication, Fabrication, Erection, and load out,
Installation of jacket & Topside on offshore, FPSO, Pressure vessel &
Petrochemical oil/Refinery. Have an experienced interpretation standard
(Norsok standard, ASME, ANSI, ASTM, AWS, API, JIS, BS, DIN, and TIS.
Rule/Standards), Specification, Procedure and drawing. Understand of work
sequence for both fabrication and installation including pre-commissioning
prior to start up at onshore and offshore project. Work under pressure
flexible on duties to perform accept responsibility work long hour
committed to going extra mile to completed job correctly on time work well
as team player or have worked on own or prepared to work in busy and
isolated area. Have strong skill level of supervision, inspection,
technical problem solving all QA/QC including technical problem.
Interpersonal skills, particular the ability to listen and understand co-
worker, client problem and point of view committed to being professional in
work displaying in integrity at all time.
total experience
17+ years In Oil & Gas, 12+ years In QA./QC.
works experiences
Oct' 2011 - Present
Company : Karara Mining Limited
Client : Karara Mining Limited
Project : Karara Iron Ore (Mining)
Location : K-999 work shop fabrication
Position : Lead QC. Inspector
Responsibilities
Verification of contractor welding consumable storage,
Handling and marking in accordance with approved procedures, Performed
quality audits on contractor record-keeping and practices of welding
perations,Interpretation of radiography films and monitoring witness
others NDE, Review Contractor Welding & NDE history lists, Monitoring of
welding and painting, Verification of completed work on acceptable for
progress status, Final dimension inspection, Pressure testing, Final
documents & MDR
June' 2011 - Sep'2011
Company : Aibel Ltd., (Thailand)
Client : Modec & Toyo
Project : Guara FPSO's (MV 23)
Location : Laemchabang assembly yard
Position : Piping Supervisor
Responsibilities
Supervise Piping for Fabrication &Installation, Reviewing
and inspection the welding daily report, Line check and punch work,
Reinstatement, MC. Punch (Procosys)
Nov'2008 - Oct'2010
Company : Maersk FPSO's
Client : State oil hydro (SAH.)
Project : Peregrino FPSO's
Location : PT. McDermott ship yard (Indonesia)
Keppel ship yard
(Singapore)
Position : Piping Inspector
|Responsibilities |
|Site inspection & Confirmation, Witness welding process, Contraction for |
|pipe (Fit-Up, Welding, Finishing,), Line check and punch work, Witness hydro|
|test, Pneumatic test and reinstatement |
| |
| |
Nov'2005 - Oct'2008
Company : Aibel Ltd., (Thailand).
Client : Maersk FPSO's, Prosafe
Project : Volve, Vincent FPSO's, Cidade de Sao Meteus
FPSO's
Location : Maptaphut Estate, Norway, Laemchabang assembly yard,
Keppel ship yard
(Singapore)
Position : Piping Supervisor
Responsibilities
Supervise piping for fabrication & Installation, Reviewing
and Inspection the welding daily report, Fit -Up Inspection after received
application from subcontractor, Daily welded inspection, Checking the daily
welder list Welder ID. Card,Checking the welding rod control,Training the
welders for observation / Surveillance results, Inspection of welding rod
material, Line check and punch work, Reinstatement, MC. Punch ( Procosys.)
Feb'2005 - Oct' 2005
Company : Samsung Engineering (Thailand) Co., Ltd.
Client : TOC.Glycol Company Limited (TOCGC.)
Project : EO / EG Project
Location : Maptaphut Estate, Rayong
Position : Welding Inspector
Responsibilities
Reviewing and Inspection the welding daily report,
Fit -Up inspection after received application from subcontractor, Daily
welded inspection after FMCS. Input, Issuing PWHT, Hardness request to
subcontractor, checking the daily welder list and welder ID. Card,
Checking the welding rod control, Training the welders for observation /
Surveillance results, Issued the quality surveillance report to related
subcontractor,Inspection of welding rod material, Control of inspection,
Measuring / Test equipment, Review of submitted certificate for calibration
by subcontractor, Issuing for the control Of calibration, Inspection welder
performance qualification test (WQT)
May'2004 - Feb' 2005
Company : Toyo -Thai Corporation Ltd. (TTCL.)
Client : Kao
Project : Kao-T - Project
Location : Amatanakorn Estate, Cholburi Province
Position : piping supervisor
Responsibilities
Supervise Piping For Fabrication & Installation, Prepare test
package, Line check, Punch list, Hydro test
And reinstatement
Feb' 2004 - Mar'2004
Company : Thai Maintenance Contracting Co., Ltd. (TMC.)
Client : Esso Sriracha Thailand
Project : SUP - 4 (Turn Around)
Location : Sriracha, Cholburi Province
Position : QC. Inspector
Responsibilities
Inspected Installation & Modify of Equipment (Tower, Drum,
and Pump), Inspected the drum & Tower, Corrosion of existing part, NDE.
Control (RT, UT, MT, PT, VT),Document control final document reviews for
turnover
Dec'2001 - Feb'2004
Company : Ultimate Technology & Service Co., Ltd. (UTS)
Client : Clough Unithai Engineering Ltd. (CUEL),
John Zink Asia-
Pacific / Samsung Engineering Co., Ltd.
ABB. Thailand
Chevron & Worley
TIG Hyco
Project : Hazira Offshore, Flair Stack Project, Bergs
Helene Offshore,
Location : UTS .Workshop, Mabtaphut estate, TIG
Position : QC. Inspector
Responsibilities
Prepare & Inspection welder performance qualification test
(WQT),Verified materials receiving according to project specification,
Dimension check before and after weld piping & Steel structure, Daily
welding report, Line check and punch work,Hydro test and reinstatement, Precommisioning, NDE. Control (RT, UT, MT,
PT, VT) Final document & Manufacturing data record (MDR.)
Sep'2001 - Dec' 2001
Company : Sriracha Construction (1994) Co., Ltd. (SCC)
Client : Bayer Polymers Co., Ltd.
Project : Poly Carbonate Phase II (expansion)
Location : Maptaphut Estate, Rayong
Position : QC. Inspector & Draftsman
Responsibilities
Field Sketch & As Built Isometric, Isometric Drawing Control, Prepare
Drawing For Site Modification Work, Conduct fit-up inspection in concurrent
to dimensional stability of the Steel structural (Jacket and Deck),
Monitoring & Visual inspection of welding and NED control, Documentation
control.
Jun'2001 - Aug'2001
Company : Toyo Thai Corporation Ltd. (TTCL)
Client : Rayong Olefins Co., Ltd... (ROC)
Project : ROC. Expansion Phase III
Location : Rayong Olefins Co., Ltd. (ROC)
Position : Draftsman
Responsibilities
Field sketch & As built Isometric, Isometric drawing control,
Prepare drawing for site modification work,
Dec' 2000 - Apr'2000
Company : Thai Rotary Co., Ltd.
Client : Thai Polyethylene Co., Ltd. (TPE)
Project : XC-1
Location : Thai Polyethylene Co., Ltd. Maptaphut estate
Position : QC. & Draftsman
Responsibilities
Prepare drawing from piping GA. for fabrication, Field sketch and as
built isometric, Prepare drawing for site modification work, Check piping
support GA. and detail drawing, Fit-up & visual inspection field joints
welding witness of the hydrostatic testing, Final documentation review
and acceptance.
Sep'1999 - Dec'2000
Company : Bechtel International, Inc.
Client : Exxon Mobil Chemical
Project : Singapore Polyethylene Plant
Location : Exxon Mobil Chemical Singapore
Position : QC. Inspector & Draftsman
Responsibilities
Assist Piping Engineer On Relate Problem Design Pipe,
Isometric Drawing Control (Marks Joints & Summary),Field Sketch & As-Built
Isometric Drawing, Piping Take-Of Material, Welding Inspection: Pre,
During & Post Welding, Pipe Inspection & Visual Dimension As Per Drawing,
NDE. Control: Inspection & Record (RT, MT, PT, VT & PMI)
Feb'1999 - May'1999
Company : PAE. (Thailand) Public Co., Ltd.
Client : Bayer Polymer Co., Ltd.
Project : Bayer Polyethylene
Location : Bayer Polymer Co., Ltd. Mabtaphut Estate, Rayong
Thailand
Position : QC. Inspector & Draftsman
Responsibilities :
Field Sketch & As-Built Isometric drawing, Preparation &
Submit daily welding report, Welding inspection and record pre, During &
and post welding, Isometric drawing control (Marks Joints & Summary),Pipe
Inspection & Visual dimension,Line check, Punch list, Pressure test and
reinstatement
July'1998 - Jan' 1999
Company : KSS. Engineering & Construction Co., Ltd.
Client : Thai Plastic & Chemical Public Co., Ltd.
Project : TPC / PVC Expansion Project
Location : Mabtaphut Estate, Rayong
Position : QC. Inspector & Draftsman
Responsibilities
Field sketch & As-Built Isometric drawing, Preparation & Submit Daily
Welding Reports, Welding inspection and record : Pre,during and Post
welding, isometric drawing control,Line check,Punch list, Pressure test
and reinstatement
May'1997 - July'1999
Company : PAE (Thailand) Public Co., Ltd.
Client : Rayong Olefins Co., ltd.
Project : 600,000 MTA. Ethylene Plant (ROC.)
Location : Mabtaphut Estate, Rayong Province, Thailand
Position : QC. Inspector & Draftsman
Responsibilities
Field sketch & As-Built Isometric drawing, Preparation & Submit daily
welding reports, Welding inspection and record : Pre, During & Post
welding, isometric drawing control (Marks Joints & Summary ),Pipe
inspection & Visual dimension as per drawing
Sep'1995 - Apr'1997
Company : PAE (Thailand) Public Co., Ltd.
Client : Thai Lube Base Oil Sriracha co., Ltd.,
Thai Petrochemical
Industrial Public Co., Ltd. (TPI.)
Project : Thai Lube Base Oil Sriracha, 300,000 MTPY
Ethylene Plant
Location : Thai Lube Base Oil Sriracha co., ltd.
Thai
Petrochemical Industrial Public Co., Ltd. (TPI.)
Position : Piping Technician
Responsibilities
Verified materials receiving according project specification,
Preparation & Submit daily welding reports piping take off material from
isometric drawing