IAN WALKER
SUPERVISOR WELDING FABRICATION PIPING MAINTENANCE INSPECTIONS
SURVEYS
PROFILE
Dedicated to engineering since
childhood. Started out with
motorcycles at 10 years old, coupled
with my fathers engineering works
where I spent many a school holiday.
Further studies, an interest in all things
technical and employment carried
me to where I am now. 40 years of
experience.
CONTACT
PHONE:
+27 (0-64-532-****
29 Gymkhana Rd
Bridle Park
Midrand
Johannesburg
South Africa
EMAIL:
*********@****.**.**
HOBBIES
Motorcycle Racing
Fly Fishing
Deep sea Fishing
Outdoors
EDUCATION
Krugersdorp High School
1978 - 1982
Matric
Krugersdorp Technikon
!984 - 1986
NTC 1 – NTC3
Mechano Technology: - Distinction
South African Diamond Cutters Union
1987 - 1990
Diamond Crossworker apprenticeship completed.
Mining Industry Training Board
1990 – 1993
Plater/Welder Apprenticeship completed.
Professional Drafting Services
1996
CAD & 3D Draughting
SAIRAA
February 2001
Level 1 Rope Access
Southern African Institute of Welding
July 2006
Welding 6G ASME IX 2004
IRATA
August 2007
Level 3 Rope Access
Southern African Institute of Welding
July 2009
NDT: - Ultrasonic Testing L1
WORK EXPERIENCE
Watson Rigging & Solutions
Supervisor Fabrication welding maintenance Rigging 2019 – Current
Design and manufacture Jack&slide equipment and various certifiable lifting and rigging mechanisms. Crane truck upgrades and modifications, rigging supervision, mechanical support for rigging crews, machine moving, welding repairs, rope access assistance to rigging projects. Projects include: - ALE; Quayside offload, transport and laydown 4 of, 1100Ton LPG bulk vessels in Richards Bay by means of SPMT and jack&slide methods. Anglo Gold Ashanti; load out 4 of 35ton generators. DHL; load out and jack&slide 200ton rock boring Mobile Miner to Atlas Copco. ALE; Gautrain, bridge lift for re-alignment. Jumar Croll Fabrications
Director/Sole proprietor
2015 – 2018
Earthmoving equipment weld repairs, Generator fabrication, solar installations, Vehicle repairs, steel fabrication, electrical installations, industrial & agricultural machine repairs .
Ocean IRM
Lead Welder 6G
1/6/2014 – 31/08/2014
Upgrade Saipem control platform. Offshore Egypt Welding performed on pipes, pipe support clamps, beam structures, deck plates and replace deck grating. Multistage project including electromechanical, instrumentation and diving crew activities
Archer Inspections & Surveys
Survey crew leader
1/2/2011 – 1/1/2014
West Eminence, West Orion, Brazil offshore for Various inspection surveys managing of 3rd party inspection crews for Seadrill deep water drill rigs in that area. Pressure vessel surveys by means of Acoustic Emissions testing and UT, Pipe surveys, High Pressure Pipe surveys - UT, Structural surveys- UT and MPI, Valve surveys – pressure testing and function testing and various UT projects Hercules 260 drill rig: Cameroon offshore - Limbe. In-port construction project, repairing jack-up legs, repairing spud can torn shell plate, repair tanks and preload tanks, UT NDT, magnetic particle NDT confined space entry, scaffolding, work at height, ABS approval. Atlantic Tiburon drill rig: Singapore offshore Transocean. Stacked jack-up rig awaiting mobilisation, Hull condition survey of preload tanks followed with report compilation identifying and calculating steel requirements.
Onome drill rig: Calabar, Nigeria offshore. Drill Rig- Jack up. Inspected and measured the bent legs on this rig for repair feasibility research.
Transocean: GSF Galaxy II oil drill rig, North Sea, offshore Aberdeen.
Performed UT wall thickness checks on this rig, for a hull condition survey identifying steel requirements.
Transocean Legend deepwater drill rig:. Karratha offshore, West Australia. Hull Preservation survey performed followed by report compilation.
Saldhana Bay, South Africa and GOM offshore Drill rig evaluations. Transocean Celtic Sea; Transocean Amirante Report
compilation and presentation of complete survey, includes coating assessment and steel corrosion assessment. Steel replacement quantity survey for repairs required and recommendations with priority schedule.
Global Energy Ventures
L3 Rope Access welding Supervisor
11/2011-12/2011
Afren: Gulftide production platform. Ivory Coast offshore. Welding of new helideck installed by means of rope access. 08/2009-09/2009
Erik Raude drill RIG
Ghana, Offshore West Africa. Lifting Gear Inspection moon pool area and derrick.
RJ Southey
L3 Rope access Fabrication & Welding Supervisor
10/2010-12/2010
Transocean GSF135 and Constellation 1
Gabon Offshore. Rig repairs, Deck plate replacement, 2 of, hull column cut-out and insert, UT inspection. Rope access L3. 08/2010-09/2010
Transocean BP –Luanda Discoverer drill ship. Angola Offshore. Stainless steel and mild steel General ship repairs. 26/04/2010 -16/06/2010
Transocean Rather Drill Rig . Congo Offshore Change out of all mud pit chamber deck plates and piping. Rope Access- Derrick DROPS survey and repairs, pipe clamps, mounting brackets secondary retention, lock nuts, etc.
02/2009 – 07/2009
Transocean Sedneth 701,Angola offshore Replace 8” seawater pipe line for length of 84 feet, 3 deck penetrations all completed in 7 days. Sedneth 701 in dock at Walvis Bay, repairs.
25/06/07 – 02/042008
Global Sante Fe/Transocean
6G ABS all position welding – First time ever, gusset replacement and complete leg refurbishment on oilrig while the rig is still working. Zero LTI or any incident to date. Adriatic 9 Global Santa Fe`/Transocean - Gabon W Africa offshorer.
Petrotech SA
L3 Rope Access Crew Supervisor,
03/2010-04/2010
Shell Nigeria Sea Eagle FPSO
Nigeria. NDT inspection on Hydralift Cranes. NDT on the SYMP of the FPSO. Eddy current, MPI and Ultrasonic testing. 10/2009-01/2010
Transocean Jim Cunningham Semi – sub Drill Rig
Angola, West Africa, Painting and grit blasting, Drops Survey CLS.- UK
ChevronBBLT Cabinda
Welder L3 Rope access supervisor.
08/2008 – 09/2008
Various upgrades and weld repairs welded pipe replacement, including electric cable tray mounting
DSL – Derrick Services Limited
Rope Access L2 Technician 6G Welder and Plater
21/07/06 – 07/10/06
Duties Joined Transocean Sedco 709 rig in Cape Town and again at Saldhana Bay in South Africa for Derrick ‘beef up’, whilst on tow to Bonga Field in Nigeria. Also did stainless steel pipe repairs. All successfully completed 2 days before arrival at Bonga, Nigeria. Russel Smith Nigeria.
Rope Access L2 Technician 6G Welder and Plater
08/05/06 – 14/07/06
Duties Contracted by Russel Smith Nigeria. Spent nine weeks at Chevron Escravos Field. Nigeria - West Africa Did riser inspection by means of UT wall thickness testing. Then did the repairs of risers by means of Clockspring, water resistant epoxy or welding. The greater part of the contract was in the UT Inspection of the risers of the entire oil field.
CSA-Nigeria
Offshore Site Supervisor
05/2005 – 11/04/2006
Nigeria –West Africa Duties Painting and grit blasting of oil rigs and offshore installations by means of rope access. Manage 4man to 50man crews. Duties include rope access rigging, net rigging and suspension, in situ flange facing, hot tapping, welding, fabrication, equipment design and development, technical consulting, costing, project engineering, drawing, planning and quality control. Accumulated in-depth work experience:
Work Experience Crack repair, cable window installation, and general fitting repairs to Vodacom, MTN and Cell C Cellular Transmitter Masts by means of rope access.
Fitting for pressure vessel hydraulic testing for: Transwerk Bevcan, BMW.
Replacing of spring hangers at Mossgas by means of rope access. drawing, planning / technical support/ QA.
Eskom Electric Power Stations: Kendal, Duvha, Lethabo, Matimba etc.
Coal Mines: Goedehoop, Greenside, Douglas, New Clydesdale etc. Tubatse FeCr, Hernic FeCr, Vametco, Rhovan, Assmang Cr. Operations support in workshops and site. General Boilermaker shop duties. Vibrating screens for Namakwa Sands. Research and development of plunger pump seal cleansing system. Machining, milling, drilling, welding and general boiler making and machinery maintenance. Underground pump installations, trouble shooting for underground pump problems. Henred Fruehauf, Production foreman on tipper trailer line. 32-man workforce. Revamp and organising of production assessment meetings. Maintenance of safety standards and worker welfare. Steinmuller, Fabrication of stainless steel "T" strainers, basket strainers, cylindrical' and conical strainers for petrochemical and paper industry, SA Water Board. General stainless steel and cast iron welding work. Aluminium and s/steel welding. Eccentric and concentric reducers 10 - 36" Plasma cutting fabricated strainers and Silencers for petrochemical, paper and mining industry. Drawing: CAD, Edgecam,
Tools & Equipment
Oxygen and acetylene cutting torch
Petrol and oxygen cutting torch
Spider baskets
Electrical Arc - stick welding 6G 25mm plate, MIG Welding TIG Welding - stainless, aluminium, copper
Spot Welding. Metal Powder spraying - Stellite and Fontargen CNC Plasma Cutting (Burny 2.5) Programming
Lathes, milling machines, drill presses, rolling presses, guillotines, bending brake
Hydraulic, vehicle and electrical repairs.
PIPING> Lobster bends, "T" pieces, lateral joints, flanges, developing, fitting and machining Rope Access. Drawings: CAD, Caddie, Edgecam, Solid Edge 3 D, Ultra Sonic flaw detection. Rigging & rigging apparatus manufacture.