Bontang – *****, East Kalimantan - Indonesia
+62-811-******* [mobile]
*********@*****.***[email]
Date of Birth 21 Mei 1962
WIBISONO TRIATMOJO
Interest Job: Operation Team Lead
WORK SUMMARY
30 years of experience in Pre-Commissioning, Commissioning, Start-up, Normal operation and Shut down activities of LNG and LPG plants.
Coordinating, Managing and Supervising work activities for Process Train Plant Shutdown and Start Up such as developing/executing Shutdown and Start Up Sequences and Equipment shutdown preparation, and till hand over for Maintenance program
Commissioning & Start up Specialist Operation in Yemen LNG 2010
HAZOP Team for Process Train & Utilities Plants, Badak LNG
Train G Commissioning and Start up, 1992, Responsible for starting up Process Train covering CO2 Removal, Dehydration/Mercury Removal, Fractionation, Refrigeration and Liquefaction units and Utilities Units TECHNICAL SKILLS
Budgeting
Business Plan
Employee Relation
Business Process Design
Job Evaluation
Manpower Planning
Organizational Development
Performance Management
Recruitment and Selection Process
Reward Management
Occupational Health and Industrial Hygiene Management
Ability to work independently.
Proven leadership skills and ability to motivate
Highly organized and efficient
WORK HISTORY
Manager Utilities
Project: Badak LNG, Bontang - Indonesia
Period: From 28/11/2016 – 20/05/2017
Job Description:
Managing all activities related to Utilities Area to ensure the achievement of safe and reliable LNG / LPG production target and ensure that all activities are carried out professionally and efficiently. Manager Trains ABCD
Project: Badak LNG, Bontang - Indonesia
Period: From 03/04/2015 – 27/11/2016
Job Description:
Managing all activities related to Process Train ABCD to ensure the achievement of safe and reliable LNG / LPG production target and ensure that all activities are carried out professionally and efficiently. Shift Coordinator
Project: Badak LNG, Bontang - Indonesia
Period: From 14/05/2014 – 02/04/2015
Job Description:
Responsible to manage and coordinated LNG and LPG plant operations in shift basis, consist of eight unit LNG Train (CO2 Removal, Dehydration and Mercury Removal, Fractionation/Distillation, Refrigeration and Liquefaction Plants), Utilities Plant (Steam Generation, Power Generation, Nitrogen Plant, Compressed Air Plant, Cooling Water Plant, Water Treatment Plant), Storage & Loading (LNG/LPG Tank, LNG/LPG Loading Dock, Knock Out Drums, Condensate Stabilizer, LPG Plant, Blowdown System) as well as Fire & Safety.
Coordinate whole plant to ensure the achievement of LNG, LPG and condensate productions target on quality, on quantity and on time safely, reliably and efficiently perform troubleshoot operation conditions anomaly and give direction to Supervisor to take decision. Operation and Liquefaction Specialist
Project: PT Saipem Indonesia
Period: From May 2013 - 2014
Job Description:
Front End Engineering Design Floating Liquefied Natural Gas of Abadi Filed Development Project capacity 2.5 MTPA. Client: Inpex Corporation, Pte Ltd
Preparing deliverables for project
Review documents from other disciplines which related to LNG operations and liquefaction process
Participate and advise on HAZIP meeting
Q-Captain for operation flawless project deliverable by providing mitigation action to prevent flaw during project phases and ensure those mitigation actions to be amended into relevant deliverables
Contribute and provide technical advice related to LNG operation and liquefaction process
Participate and advise for PID’s review and HOZOP meeting Internal Auditor, Audit & Compliance
Project: Badak LNG, Bontang - Indonesia
Period: From 21/03/2013 – 30/04/2013
Job Description:
Responsible for Facilitating the development and implementation of the SHEQ programs, reviewing the SHEQ MS Manual and SHEQ MS SOP (Standard Operating Procedure), providing advices, consultation and monitoring of the implementation of the SHEQ program and related work activities and disseminating the best practices found in each element of the SHEQ MS Manual and SHEQ MS SOP. Report all incidents of accident / injury / illness to the Manager as soon as possible; Review accident report from first-line supervisor / engineers. Check the performance of SHE-Q with first-line Supervisor / engineer and report to Manager. Operation Specialist
Project: Badak LNG, Bontang - Indonesia
Period: From 11/04/2011 – 20/03/2013
Job Description:
Coordinate and manages the Training Project in Badak LNG learning Center covering Proposal, Syllabus, Schedule, Modules, Learning Method, Instructor, Assessment, Facilities and Accommodation
Support technical services provided for the clients
Manage the Commissioning and Start Up Assistance Organization and Personal. Start Up Coordinator
Project: Yemen LNG, Yemen
Period: From 2010 - 2011
Job Description:
Coordinated the on-shift operation pre-commissioning, commissioning for starting up Process Train covering CO2 Removal, Dehydration/Mercury Removal, Fractionation, Refrigeration and Liquefaction, Utilities Units.
Coordinated the on-shift operation pre-commissioning, commissioning for starting up Blowdown system Shutdown Coordinator
Project: Badak LNG, Bontang - Indonesia
Period: From 07/04/2010 – 10/04/2011
Job Description:
Coordinated all activities on-daily operation to maintain good Thermal Efficiency, Product Quality and Environment Program
Coordinate all preparation of Start Up and Shutdown Activities with all related parties. Supervisor Process Shift
Project: Badak LNG, Bontang - Indonesia
Period: From 30/07/2001 – 06/04/2010
Job Description:
Coordinate operations of two unit LNG trains during 8 hours shift working to ensure the achievement of LNG and LPG production targets which are on quality, on quantity and on time in accordance with the requirements of safety, reliability and efficiency and ensure all plant facilities functioning properly and professionally executed.
Maintain good coordination and communication with other sections to minimize impact of changes in shared resources
DCS Retrofit Project Coordinator
Project: Badak LNG, Bontang - Indonesia
Period: From 2000 - 2001
Job Description:
Coordinated all activities of DCS Retrofit Project in Utilities and Process Plant, such as ensuring the project to be completed in timely manner and all facilities are in good working.
Proposed the modification of control system from analog to DCS system.
Prepared training module for operator in DCS system operation. Lead/Panel Operator Utilities & Process
Project: Badak LNG, Bontang - Indonesia
Period: From 17/06/1998 – 30/07/2000
Job Description:
Responsible for coordinating between Main Panel Operator and Field Operator, safely, efficiently and professional to ensure LNG & LPG production achievement and ensure all facilities working properly.
Monitoring and analyzing and problems solving. Recorded log-sheets and reported daily reports to Supervisor for plant activities. Used and understood all activities and procedures to prepare, start-up, shutdown, and isolate equipment. Executed emergency drill. Identified possible maintenance and / or safety issues.
Operator, Process Train A/B/C/D
Project: Operation Department, PT Badak NGL, Bontang - East Kalimantan Period: From 10/08/1987 – 16/06/1998
Job Description:
Responsible for operating at Process Train area on Plant-4 Refrigeration Unit MCR and Propane.
Monitoring and analyzing and problems solving. Recorded log-sheets and reported daily reports to Main panel operator and Supervisor for plant activities. Used and understood all activities and procedures to prepare, start-up, shutdown, and isolate equipment. Executed emergency drill. Identified possible maintenance and / or safety issues.
EDUCATION
Bachelor of Chemical Engineering, Sekolah Tinggi Teknologi Industri Bontang, East Kalimantan – Indonesia (2009)
Oil & Gas Academy, Sekolah Tinggi Energi & Mineral, Cepu, Middle Java – Indonesia (2000)
Senior High School, SMA Negeri Sukabumi, Indonesia (1984)
Junior High School, SMP PGRI Sukabumi, Indonesia (1981)
Elementary School, SD Negeri I Mukuh, Indonesia (1975) TRAINING/CERTIFICATES
2016 Effective Cost Management
2016 Incident Investigation & Action Tracking
2015 Advanced Budgeting & Cost Control
2014 Training LNG Spill Rescue & Fire Fighting
2014 Training Manager Development Program
2013 QMS ISO 9001 Lead Auditor
2013 Training Need Analysis
2012 Contract & Capital Project Management
2011 AFE Project Management & Contract
2011 Steering Committee ISO 14001 & 9001
2011 WS. Fireye Flame Scanner
2011 Reliability Engineering & Management
2010 APCI Seminar LNG Owner USA
2009 Work Permit and Receiver Certificate
2008 Supervisory LNG Indonesia
2008 SHE-Q Ms Work Permit
2007 Chloride Industrial UPS
2006 P3S : Gas Processing
2005 Centum CS3000 Operation Engineering & Maintenance 2005 W.S Operator Development Prog (ODP)
2005 Power & Steam Management System
2004 Leadership and Powership
2002 Automatic Control System
2001 Safety Training Observation Program (STOP)
2001 ISO 9001:2000 Awareness for All Employee
2001 Electrical System
2000 ISO 14001 Awareness EMS
2000 Oil And Gas Academy Level II : Gas Processing 1998 DCS XL Fundamental
1996 Project Management Professional (PMP)
1996 Fire/Safety Refreshing
1993 Refinery Operation & Economics Basic
1992 Basic Processing Engineering Course Gas Level-I 1991 4-KT Governor System
1991 Fire Safety & Security
1990 Basic Processing Engineering Course Gas Preparation 1989 Steam Trap Monitoring