ARCH’T. F. L. ESTOPEL RESUME *
FERNANDO LUCIANO ESTOPEL
SENIOR ARCHITECT
Contact no. +974-******** / 31321966
Email Add.: **************@*****.*** / ********@*****.*** Period
Position
Employer’s
Name
and Address
Project Name, Description and Project Value
From to Duties and Responsibilities
Nov. 01
2021
Present Senior Architect HTCO
Doha, Qatar
Floresta Tower (Residential Hotel)
Pearl Qatar (QAR 165+m.).
Giardino Villas (P130, P131, P132,
& P136) Pearl, Qatar
Approached Surveillance Radar
(ASR) Airport Project.
Check and reviewing contractor submission.
Site management.
Completed comprehensive code compliance
UDC basic design guidelines and project
specification.
Coordination and technical meeting with
client and contractor.
Experience
Summary Years’
Experience
30 yrs. Consulting
Experience
22 yrs. Contracting
Experience
8 yrs. Years of Experience in Current
Employer
1 yr.-
8mo.
Building 20 yrs. Design Experience 6 yrs. Highway Projects 2 yrs. Light Rail Train (Transit) Projects
2 yrs.
Chartered
(Y/N)
Y Accredited Degree
(Y/N)
Y Relevant Degree (Y/N) Y Master’s (Y/N) N
Doctorate (Y/N) N
Professional
Information
Current Employer Name:
HTCO
Date of Birth:
March / 12 / 1966
Nationality: Filipino
Education:
Date Certified Course Title Name of Institution Country Degree 1986-1992 Bachelor of Science in Architecture Technological Institute of the Philippines Philippines Training/
Certificate
2000 CADD Interface Computer College Philippines
Training/
Certificate
2013 LEED GA and Facility Management Chicago Training Center Qatar Training/
Certificate
2022 PMP ® PMI Qatar
Licenses Registered & Licensed Architect, United Architect of the Philippines (UAP-PRC-AIPOA) Registered Architect, American Institute of Architects (AIA) Certified Grade “A” Architect (UPDA-MMUP-MME) Qatar Membership/
Affiliated
Professional
Work
Information
Summary Key Objective:
Key Architect at a high-end Architecture and Engineering Firm design and developed multi-billion-dollar jobs through all phases of work.
Consistently delivered project budgets to 98% accuracy of Architectural finishes provided effective supervision of architect and engineer finished on the project costs.
Monitored and implemented QA/QC from inception to meet projects timeline for construction completion related activity as well as quality with functional features by thoroughly testing using appropriated protocols. Summary Duties and Responsibilities:
Aided senior leadership with executive decision-making process by reviewing completed contractor with conjunction with materials submission, shop drawing, report, methodology statement (MS), ITP and others for accuracy.
Collaborate and coordinate with Designer, Consultant, Contractor and Sub-contractor project compliance with International, Local code and Statutory authority agency (QCS, Ashghal, UDC Pearl, QCDD, KHAARAMA & other) rules and guidelines in design, specifications and site implementation.
Consistently delivery and implementation QA/QC related activity as well as quality with features functional with minimal defects by thoroughly testing using appropriated protocols.
Architectural fit-out, finishes and FF&E on the project provided effective supervision of architect and engineer.
In my commitment to excellence with successfully combined my proven extensive technical skill in architectural fundamental and principle and acquired specifically successful experience. ARCH’T. F. L. ESTOPEL RESUME 2
Dec. 21
2020
Oct. 30
2021
Senior Architect DSG / MZP
Doha, Qatar
Al Waab Commercial &
Residential District. Mixed used
Hilton hotel. (QAR 1bn) Al Waab,
Salwa Road, Qatar
LPS 02 Pearl, Qatar
LPS Villas (32-33-34 & 35)
Al Majid Tower (B2+G+M+24)
Lusail, Qatar
Site management.
Completed comprehensive code compliance
evaluations for Hilton hotel basic branded
and project specification.
Coordination and technical meeting with
client and contractor.
Billing evaluation, recommendation and
approval to signed.
June 01
2019
Dec. 15
2020
Senior Architect Diverse
Consult /
Al Tawfeeq
Doha, Qatar
Health Care Center Al Khor, Qatar. ($ 500
mn - QR 1.825bn), (Ashghal Project).
Manage builder’s construction conformed to
drawings and designs completed
comprehensive code compliance evaluations
for 500-bed health center projects.
Dec. 18
2017
April 30
2019
Senior Architect AL Baker
Architect
Doha, Qatar
Doha Live mixed-use development Airport
Road in Najma, Qatar ($1bn).
Collaboration with consultant & contractor.
Completed comprehensive code compliance
evaluations for mixed used project.
Feb. 15
2016
Sep.26
2017
Senior Architect National
Engineering
Bureau Doha,
Qatar
Doha Oasis Mixed Use Development Al
Musheireb, Doha, Qatar ($1.3bn).
Monitored and supervise façade, fit-out
activity and conduct periodically site visit.
Site Management.
Sep. 18
2014
Jan. 12
2016
Senior Architect GEIC
Doha, Qatar
Doha Land (Msheireb) mixed used
($3,269,838.00 bn.) Package scope are
Phase 1B/1C.
Manage a progressive shop drawing plans
review, pre-qualification, material
submittals, and methodology statement with
inspection test plan in architectural scope.
Nov. 02
2013
August 12
2014
Senior Architect Diwan Al
Emara
Doha, Qatar
Al Thuraya Tower (hotel
apartments) @ West Bay Doha,
Qatar,
Private Diwan Amiri Office
(Ashghal Project) at Old Al Rayyan
Hilton Double Tree Hotel in Al
Saad, Doha, Qatar
Scout Camp (Ashghal Project) in
Mazrouaa, Qatar
Completed comprehensive code compliance
evaluations for hotel and school project.
Monitored project from inception to meet
projects timeline for construction
completion.
Assigned in all these projects according to its
project contract percentage for maximizing
supervision scheduling in every project site.
Fit-out installation management, monitoring,
inspection and other architectural finishes.
May 20
2013
June 20
2015
Oct. 30
2013
Nov. 31
2016
Senior Architect
Topaz
Contracting
& Services
Doha, Qatar
Underground Parking B-3 Doha, Qatar
Commercial Store in Qatar Mall
Site Management.
Inspection During ongoing architectural
activity upon request by contractor
accordance with Inspection Test and Plan,
methodology (MS) and specification
Sept. 21
2010
April 30
2013
Senior Architect
Bouygues
Batiment
International
Doha, Qatar
Qatar Petroleum District (QP) District, nine
office building, the tallest of which has 52
levels, a five-star hotel complex with more
than 400 rooms, a shopping center, a
conference center, a mosque and all the car
parks at basement and car park building,
energy center building and external
landscape. $ 4,310,298.23 bn (QAR18. 9bn).
During and monitoring the façade inception
to meet projects timeline for construction
completion finishing stage of the project
provided effective supervision of architect
and engineer.
Manage the assigned package project for
bidding and awarding for tender.
Bidder evaluation and screening prior final
granting award package.
Dec. 27
2008
August 20
2010
Senior Architect
Penta
Consultant
Doha, Qatar
Vodafone Cell Site Telecommunication
Green Field Tower (30 meters high)
Roof Tower (9-meter -12 meter high)
Completed comprehensive compliance
evaluations for green field and roof tower
cell site project.
July. 11
2003
Dec. 20
2008
Architect
Adil Jaidah &
Associates
Doha, Qatar
* Doha Bank Head Quarters in West Bay
Doha, Qatar was design by Rice Perry Ellis,
$0.25mn (QAR1. 6bn),
* Dunes Hotel (2B+G+M+21) @ West Bay
$0.125mn. (QR0.8bn.).
* Al Hitmi Apartment (6 Duplex G+12) @ AL
Hitmi Doha, Qatar $0.0625bn. (QR0.4bn.)
* Twin Bldg.(G+7) in Al Saad Doha, Qatar
* Apartment Bldg.(G+6) in Al Jadeeda, Doha,
Qatar.
* Compound Villa (48 G+1) in Ain Khalid and
(34 G+1) in Muathir, Doha, Qatar.
Collaborate and coordinated with contractor
to confirmed construction compliance with
design and specifications.
Completed comprehensive code compliance
evaluations for Bank project.
Inspection task to ensure architectural
finishing activity will coordinated and
conjunction with specifications and
methodology (MS) & (ITP).
Fit-out installation management, monitoring,
inspection and other architectural walls,
ARCH’T. F. L. ESTOPEL RESUME 3
* Office Bldg. (B+G+2) Al Saad Doha, Qatar floor and ceiling finishes materials (stone, tiles, cladding, painting and others)
Oct. 2001 June 2003 Architect
Astetik Design
Philippines
Light Rail Transit – LRT Line 2
11 No. of Station
13.8 km. (8.6 miles) Track Length
8 – Speed (60-80 km. / H.) 37.50 mph.
Line 2 running east-west. This project is cost
of the Line 2 project is 25.7 billion pesos.
Assigned as site Architect to manage the
project but not limited to fit-out, inspection,
coordination and monitoring in the whole
architectural activities for every LRT Station
and subs station. Also involve in
Architectural finishes interior and exterior
monitoring, coordination and supervision of
the designated station.
Dec. 1999 Sept. 2001 Architect
Free Lance
Architect
Philippines
Client with Various projects such as
Community Chapel
Residential Apartment
Community Health Center
Reimbursements Endoscopy unit in Makati
Medical City
Recreational beach Resort
Swimming pool & SPA
Landscape, cottage, clubhouse.
Architect Professional practitioner but not
limited in design also involve in built and
project management with my own project.
Furnished Architectural data or information
required to complete the process and
document of the project.
June 1997 Dec. 1999 Project
Manager
FNSP
Philippines
Lafayette Square is a 30-storey luxury
residential tower by Recio+Casas Architects.
Salcedo Village, Makati Philippines.
$0.850mn. (30.0bn PHP).
Water resort in Batangas, Subic Zambales,
and Davao City Philippines.
Managed the project and personnel Staff,
liaise and assist the architects and engineers
with their respective discipline in monitoring
the daily site activities. Conduct a weekly
progress and technical meeting with the
client representative and contractor and
other personnel who may involve on the
project. Project monitoring as per planning
followed accordingly. And cash flow must be
closed monitoring and report on the board
the daily, weekly and monthly work progress
and budget flows.
June 1995 June 1997 Architect
Design
Programmers
Philippines
Rehabilitation and Modernization of the 84
kilometer (NLEX) North Luzon Express.
Demolished existing 91 Toll Booths, to give
way 145 new Toll Booths and additional 4
Toll Plaza.
TCRS (Traffic Control Room) system.
CCTV
EC LANE
SWIPE CARD + CASH
Project is cost $1.0bn (46.4 bn.PHP).
Site Management.
While followed the inspections procedure of
one activity prior the next level site activities
due the process of implementation of
methodology are strictly compliance.
Installation of architectural finishes such as
stone, tiles, paint, etc. in interior and
exterior. And do the landscape as well the
hardscape inspections (Curb, Garden, Lime,
and Natural stone, Pavement etc.) Kiosk.
May 1992 May 1995 Architect
Design
Architect
Philippines
In Various Companies Site acquisition and zoning compliance and built structure base on the economically and
material availability in local area. Freehand
drafting and Manual presentation various
projects. Finalized the schematic design to
working drawing. Furnished data and
information required to complete the
process of project (permit and
documentation).
May 1989 May 1992 Architect
Technical
Draftsman
Architect
Philippines
In Various Client Accept personal project of set working drawing under supervision of professional
registered & license Filipino Architect.
Managed manual drafting and freehand
presentation of various client projects with
approval requirements. And incorporate
furnished data and information to complete
the process of project acquired documents
for building permit and construction.