BRIAN L. RINCK
**** ******** ******* **. **. Louis, MO 63129 Cell 314-***-**** E-mail: ***********@*******.***
PROFESSIONAL OBJECTIVE
Motivated Mechanical Engineer with over 33 years of progressively responsible experience seeking a challenging engineering position. Reputation for excellent Mechanical Engineering & Electrical Engineering skills along with a strong background in Electrical Engineering. I have a very solid B.S.M.E. education combined with a M.B.A. degree.
QUALIFICATIONS PROFILE
CDG ENGINEERS, St. Louis, Missouri: August 2012 – Present
Senior Project Engineer
CPS Energy, San Antonio, TX – Various project to remove old equipment, install new coal handling equipment.
AMEREN – Create construction drawings for SFC, Submerged Flight Conveyors, for Ash handling.
BEELMAN, Trap Rock – Construction drawings for New Quarry in Ironton. Conveyors, crushers, etc.
Mallinckrodt Pharmaceutical - Inergen Fire Suppression systems mandated by FM Global insurance company.
Mallinckrodt Pharmaceutical - Glass Lined Tank replacement with new instrumentation including P&IDs.
Mallinckrodt Pharmaceutical - AS-I (Actuator Sensor Interface) bus extension addition of 22 new valves.
AMEREN Rush Island – Worked in coal receiving pit with PayneCrest, replaced old rusted electrical enclosures, replaced conduits with RobRoy (PVC coated) conduits, etc.
Mallinckrodt Pharmaceutical – Install 2 PowerFlex VFD’s for two process pumps that are controlled by Delta V.
Mallinckrodt Pharmaceutical – Electrical construction drawings for Pre-fabricated refrigerated storage buildings.
EMERSON CLIMATE TECHNOLOGIES, Lebanon, Missouri: November 2010 – August 2012
Production Engineer
Capital project ($80K) to upgrade (5) five machines from SLC 500 to CompactLogix & Tooling RFID
Process Owner for Line 1 producing 5,000+ compressors per day and Sub-assembly area.
KV PHARMACEUTICAL – (AEROTEK), St. Louis, Missouri: December 2009 – April 2010
Maintenance Engineer
Implemented a Steam Trap Testing PM Program for 5 buildings that produced a savings of $75,000
Reviewed, modified, and wrote Preventive Maintenance procedures (PM’s) for Pharmaceutical Equipment and facility equipment (compressors, Air Handling Units – AHU’s and Boilers).
SARA LEE CORPORATION, Earth City, Missouri: February 2007 – September 2009
Corporate Maintenance Engineer & Corporate Project Engineer II
Implementation of a Water Treatment Program for 42 bakeries with a natural gas savings of $375k per year
Wrote Preventive Maintenance procedures for use across 42 bakeries.
Purchased and managed installation of bakery equipment and facilities equipment.
Write Capital Expenditure Requests for new equipment.
HUSSMANN CORPORATION, Bridgeton, Missouri: June 1997 – February 2007
Senior Manufacturing/Maintenance Engineer
Coordinate installation of equipment with contractors.
Purchase assembly equipment which includes conveyors, fixtures, foam dispensing equipment, manipulators, etc.
Develop HMI, GUI, PLC & all associated controls automation specializing in Allen-Bradley software & hardware.
Responsible for troubleshooting all PLC’s, PC’s, and all electrical, mechanical and hydraulic equipment.
Provide technical direction to maintenance personnel and outside contractors.
GENERAL MOTORS CORPORATION, Wentzville, Missouri: June 1989 – May 1997
Manufacturing Engineer - General Motors Truck Group, September 1994 - May 1997
Coordinated the design, development, and improvement of manufacturing processes and equipment.
Designed and implemented assembly aid tooling, articulating arms, and fixtures.
Manufacturing Engineer - Buick-Oldsmobile-Cadillac Group: June 1989 – September 1994
Supported production, implemented changes, initiated deviations, communicated with suppliers, ran pilot material, coordinated production tryout material, worked with Design and Release Engineers at Headquarters.
EDUCATION
FONTBONNE COLLEGE, St. Louis, Missouri: January 1990 - May 1992
Masters of Business Administration; GPA 3.7/4.0
UNIVERSITY OF MISSOURI – ROLLA, Rolla, Missouri: August 1984 - May 1989
B.S. Mechanical Engineering; GPA 3.2/4.0
COMPUTER SKILLS, PLC Programming and Robotics
Programming Languages: RSLogix 500, RSLogix 5000, PanelBuilder 32, RSView32. BASIC, TURBO C
CAD Experience: AUTOCAD 2018 and REVIT 2018, Revit 2022
Software: Microsoft Word, Excel, Microsoft Access, PowerPoint, Seagate Crystal Reports
Fanuc Robotic Programming and CNC programming
Cognex EasyBuilder Software for Cognex Vision Cameras