Adolfo E. Soriano
Construction Oversight Engineer
Phone No. - 808-***-****
Email - ***************@*****.***
Professional Summary
Adolfo Soriano has a combined experience of 21 years in the Philippines and 15 years and counting in the United States with a total of 36 years in engineering and construction. I held a variety of positions throughout my career and have worked on various projects in local City Street Improvements. as a Project Manager, QC Manager, Supervisor, Project Engineer, and Estimator on different projects ranges from construction of high rise residential and office building, renovation & repair works of different structures, main water supply system,penstock for hydro electric company(power plant) and other construction works involving Structural, Civil, Electrical, Mechanical, Plumbing, Fire Protection, Architectural and interior finishes. I as a Project Construction Manager, I ensure the projects are delivered to the highest quality and safety standards are met, turned over on time and within budget by effectively organizing, managing, and utilizing all resources, tracking events, production rates and adjusting methodology if necessary.I was able to least teams when the highest standards are routinely demanded. I am involved in all aspects of the project cycle and can deliver high value projects and take direction well and work hard to manage stakeholder/ client’s expectations. Areas of expertise include, but not limited to, construction engineering and project management. Education
1981 - Graduate in B.S. in Civil Engineering, Adamson University, Manila Philippines Employment History
● McDonough Bolyard Peck Inc. (MBP) Feb. 23, 2023 to Sept. 15, 2024
● CCI Utility & Construction Services, LLC- November 1,2021 to Nov.15, 2022
● MACNAK Const.- BCP Construction of Hawaii Inc. April 1,2019 to Oct. 31, 2021.
● Rising the standard Construction Inc. - Watts Const. Project - March.4 2018 to Mar. 30, 2019.
● Dawson Technical, Inc. – Dec. 1,2014 to Jan. 20, 2018.
● Standard Const. Group -March. 3,2011 to Nov. 28, 2014.
● Triton Marine Const.- February. 2010 to Jan 2011.
● CB Tech Serv. Inc.-March.2009 to Nov. 2009.
● Nan Inc.- Aug. 2007 to February. 2009.
● Index Builder -February 2007 to Aug. 2007.
● Acutron Co. Inc. – July 2006 to January. 2007.
● Group Builder Inc. January. 2004 to June 2006.
A. CONTRACTOR EMPLOYEE TO FEDERAL GOVERNMENT : Feb 23, 2023 to Sept.15, 2024. MBP with Main Office VA, USA (Feb 23, 2023 to Sept.15, 2024.)
- US NAVY FACILITIES ENGINEERING (NAVFAC) Marianas GUAM (USA)
- US NAVY FACILITIES ENGINEERING (NAVFAC) Hawaii - part of Shipyard Infrastructure Optimization program (SIOP) at Joint Base Pearl Harbor Hickam (JBHH) . Construction Oversight Engineer -I review, evaluate, analyze and provide cost estimates, price comparison and analyze time impact to the schedule and recommend associate extended durations if compensable.Validate and conduct site inspection for all related modifications and determine scope of work, analyze provided by the contractor.
Duties and Responsibilities include but not limited to: 1. Provide and perform cost and schedule analysis, used RFP for basis of cost comparison and Scope of work Determination.
2. Conduct site investigation and validated reasonableness of KTR claims. 3. Perform reviews constructability issues of drawings, specifications, calculation cost estimates provided by KTR.
4. Plan, schedule, and coordinate the work with Contractor to ensure conformance to construction schedule.
5. Coordinate with Contractors to ensure that the manpower, equipment,materials, and design necessary to support the schedule will be available.
6. Monitor Contractors performance and productivity. 7. Monitor Contractor infection control plan.
8. Coordinate with the Project Manager to ensure the project stays on schedule and all submittals/shop drawings have been reviewed and submitted.
9. Monitor and audit the performance of field personnel in assuring that work completed according to specifications, plans, construction schedules, applicable safety regulations and quality requirements. Here are some of the various project assigned:
Repair/Replace Fire Alarm & Detection System Bldg. 585, Naval Magazine Guam FEMA Various Projection at Bldg. 100 Phase 1 Barrigada, Guam Remove & Replace 125 KW Stationary Generator Bldg.1802 Kilo Wharf, NBG FEMA Warehouse Renovation Bldg. 100 Phase 2 Barrigada, Guam Modernize EOD Paraloft Hoist System at Bldg, 2113, NBG Provide Cooling System for R1 & R2 Service Bay in Bldg. 4430 Polaris Point, NBG Replace and Modernize Power Mounds SPM-02 at Sierra Wharf, NBG Replace Pumps, Motor & Valve at SLS 28 Camp Covington, NBG Infrastructure Optimization program (SIOP) at Joint Base Pearl Harbor Hickam (JBHH) B. Design Built, Building Envelope Construction, Structural Design and Other Experience: Quality Control Manager Nov 1, 2021 to Nov 15, 2022 CCI Utility & Construction Services, LLC
Replace 12-inch Waterline PH3 Kuahua Ave., JBPHH, Oahu HI. $ 3,030.683.00 Repair Aircraft Parking Apron MCBH, Kaneohe Oahu, HI $ 5,289,235.00 Bldg. 1 Complex Exterior Painting MCBH Camp Smith Halawa Oahu, HI $ 1,302,786.00 Implement the Three phases of Quality Control for each Definable feature of work. Inspect all work and rework to ensure compliance with contract requirements. Maintain a rework log in the Daily QC Report. Immediately stop any segment of work which does not comply with contract plans and specifications and direct the removal and replacement of any defective work. Remove any individual from the site who fails to perform there in the skillful, safe, and workmanlike manner or whose work does not comply with contract plan & specifications. Prepare daily report. Ensure that the production reports are prepared daily in QC reports. Ensure safety officer Inspections are performed. Attend weekly toolbox meetings. Ensure Construction submittals are reviewed, and approved, as required by the contract, prior to allowing material on site and work to proceed with this item. Main tan accurate, up to date submittal log. Maintain up to date as- built drawings on site. Maintain a testing and plan log. Ensure all testing is performed in accordance with the contract requirements. Review all the test reports and notify the Contracting officer of all deficiencies, along with a proposal for the corrective action. Maintain a deficiency log on- site, noting dates of deficiencies identified and date corrected. Certify and sign statements on each invoice that all work to be paid under the invoice has been completed in accordance with contract requirements. Perform Punch-list and Pre Final inspection & participate in final inspections. Submit a list of deficiencies to the Contracting Officer for each inspection. Correct all deficiencies prior to the final Inspection. Notify the Contracting Officer for each inspection to establish a schedule date acceptance to the Contracting Officer. Assure that all required applicable tests, special inspections, and observations are performed. Coordinate all factory and on-site testing, laboratory personnel, QC Specialists, and any other inspection and testing personnel required by the contract. Notify the Contracting Officer of any proposed changes to the QC plan, retain a copy of approved submittals at project site, including approved samples. Ensure that Safety Officer Inspections are performed. Attend weekly toolbox meetings. Quality Control Manager Apr 1, 2019 to Oct 2021
MACNAK-BCP Construction of Hawaii Inc.
Replace Cathodic Protection System, Tank S-1, Aliamanu Pearl City Hon, Hi $ 2,100,234.00 B2030H Isolate Drains & Repair /Replace Flooring- JBPHH Hickam, Hi $1,330,807.00 Building 409 NMT Multiband Terminal Antenna#3 –JBPHH Wahiawa Annex, Oahu, Hawaii $ 649,599.00 Group 24 W2 Thru 5 Magazines, Roof Repair- JBPHH, Hickam West loch, Oahu Hi $ 2,132,697.00 Implement the Three phases of Quality Control for each Definable feature of work. Inspect all work and rework to ensure compliance with contract requirements. Maintain a rework log in the Daily QC Report. Immediately stop any segment of work, which does not comply with contract plans and specifications, and direct the removal and replacement of any defective work. Remove any individual from the site who fails to perform there in the skillful, safe, and workmanlike manner or whose work does not comply with contract plan & specifications. Prepare a daily report. Ensure that the production reports are prepared daily in QC reports. Ensure safety officer Inspections are performed. Attend weekly toolbox meetings. Ensure
Construction submittals are reviewed, and approved, as required by the contract, prior to allowing material on site and work to proceed with this item. Main tan accurate, up to date submittal log. Maintain up to date as- built drawings on site. Maintain a testing and plan log. Ensure all testing is performed in accordance with the contract requirements. Review all the test reports and notify the Contracting officer of all deficiencies, along with a proposal for the corrective action. Maintain a deficiency log on- site, noting dates of deficiencies identified and date corrected. Certify and sign a statement on each invoice that all work to be paid under the invoice has been completed in accordance with contract requirements. Perform Punch-list and pre final inspections & participate in final inspections. Submit a list of deficiencies to the Contracting Officer for each inspection. Correct all deficiencies prior to the final Inspection. Notify the Contracting Officer for each inspection to establish a schedule date acceptance to the Contracting Officer. Assure that all required applicable tests, special inspections, and observations are performed. Coordinate all factory and on-site testing, laboratory personnel, QC Specialists, and any other inspection and testing personnel required by the contract. Notify the Contracting Officer of any proposed changes to the QC plan, retain a copy of approved submittals at project site, including approved samples. Ensure that Safety Officer Inspections are performed. Attend weekly toolbox meetings.
Quality Control Manager Mar 4, 2018 to Mar 30, 2019 Rising the Standard Consulting Inc
Command & Control Facility (C2F) Phase 2 Fort Shafter Oahu, Hawaii – 55, 000, 000.00. Central Vehicle Maintenance Wash Facility Schofield Barrack Oahu Hawaii- 525, 000.00. Quality Control Manager Dec 1, 2014 to Jan 20, 2018 Dawson Technical, Inc.
P 924 -Road & infrastructure Improvements MCBH Kaneohe Bay Hi – 2, 100,200.00 Repair Building 449 Roof & Structural Frame JBPHH, HI $ 3,899,000.00 Renovation Aloha Center Building 690 Schofield Barracks. Oahu, Hi $ 10,178,175.00 Set up a quality control plan, facilitate, process all documentation in conformance with the specification and contract. Prepared and reviewed materials, equipment and manpower submittals in coordination with the OICC/COE for proper processing and approval. Oversee the work of contractor and subcontractor and control activities in compliance with specification procedure. Proper implementation of the three phases of construction work, preparatory, initial and follow up inspection for all architectural, structural, mechanical/plumbing, electrical and other related works. Conducted testing of materials on site/off site in product implied the required design and specification. Evaluated and approved change order, variation and process contractor monthly billing report with regards to actual field production accomplished in that period. Conduct a safety toolbox morning meeting for all workers. Activity hazards analysis orientation before any start of definable features of work. Include safety issued during the preparatory phase meeting onsite. Daily production and inspection report submitted to client for reference and information. Filing system for all correspondence, approved submittals and daily update as-built plan on site. Field works control to ensure proper procedure and material done effectively PM/QC Manager Mar 3, 2011 to Nov 28, 2014
Standard Construction Group
Central Controlled Irrigation System Pearl Harbor, Ford Island, Makalapa Compound $1,148,553.61 Replace Roof Mounted A/C and Repair Ro Kailua, Hi $ 3,615,750.00 Replace All Building Seam Seals for Bldg. 352 & 400 Pearl Harbor, HI $ 551,900.00 Repair/Replace Roof & Supports Bldg.1326 Pearl Harbor, Hi $ 269,500.00
Repair Exterior Stair Bldg.39 Ford Island, Hi $ 414,000.00 Exterior Repair to Bldg. 1443 Naval Shipyard Pearl Harbor, Hi $ 541,499.00 Repair 63” Pipe Joint at the Dry Dock #4 PHNSY & IMF, Pearl Harbor HI $1,364,300.00 Main Gate Improvements PMRF Barking Sand, Kauai, Hi $ 662,000.00 Set up a quality control plan, facilitate, process all documentation in conformance with the specification and contract. Prepared and reviewed materials, equipment and manpower submittals in coordination with the OICC/COE for proper processing and approval. Oversee the work of contractor and subcontractor and control activities in compliance with specification procedure. Proper implementation of the three phases of construction work, preparatory, initial and follow up inspection for all architectural, structural, mechanical/plumbing, electrical and other related works. Conducted testing of materials on site/off site in product implied the required design and specification. Evaluated and approved change order, variation and process contractor monthly billing report with regards to actual field production accomplished on that period. Conduct a safety tool box morning meeting for all workers. Activity hazards analysis orientation before any start of definable features of work. Include safety issued during the preparatory phase meeting onsite. Daily production and inspection report submitted to client for reference and information. Filing system for all correspondence, approved submittals and daily update as-built plan on site. Field works control to ensure proper procedure and material done effectively Quality Control Manager Feb 2010 to Jan 2011
Triton Marine Construction
Lima Landing, West Lock, Ewa Beach HI $ 490,000.00 Dry Dock 4 Repair Discharge Tunnel Gallery/Dock Floor and Replace Drain Valve $645,450.00 Set up a quality control plan, facilitate, process all documentation in conformance with the specification and contract. Prepared and reviewed materials, equipment and manpower submittals in coordination with the OICC/ COE for proper processing and approval. Oversee the work of contractor and subcontractor and control activities in compliance with specification procedure. Proper implementation of the three phase of construction work, preparatory, initial and follow up inspection for all architectural, structural, mechanical/plumbing, electrical and other related works. Conducted testing of materials on site/off site in product implied the required design and specification. Evaluated and approved change order, variation and process contractor monthly billing report with regards to actual field production accomplished on that period. Conduct a safety toolbox morning meeting for all workers. Activity hazards analysis orientation before any start of definable features of work. Include safety issued during the preparatory phase meeting onsite. Daily production and inspection report submitted to client for reference and information. Filing system for all correspondence, approved submittals and daily update as-built plan on site. Field works control to ensure proper procedure and material done effectively.
Quality Control Manager Mar 2009 to Nov 2009
C B Tech Services Inc.
NCTAMS Bldg. 10 Wahiawa, Hawaii $ 80,000.00 HRSOC Wahiawa HRSOC Wahiawa Hawaii $150,000.00
DCGS Intel Squadron Operation Facility, Hickam $ 110,010.00 Prepared the labor, equipment and materials cost for the bid projects. Conduct material submission as per plan and specification. Conduct moisture and bond testing as per specification. Prepared materials take off. Monitor and inspect the proper material installation and application. Prepare the activity hazards analysis orientation before any short definable feature work. Attend the weekly coordination meeting with client and subcontractor regarding progress report and problem encounter on jobsite. Submit all quality control plans with compliance with specification procedure. Quality Control Manager /Safety Officer Aug 2007 to Feb 2009 Nan, Inc.
Center (WCCHC) $ 11,500,000.00
Native Hawaiian (Healer’s Building (NHIPTC) $1,000.560.00 Set up a quality control plan, facilitate, process all documentation in conformance with the specification and contract. Prepared and reviewed materials, equipment and manpower submittal for proper processing and approval. Oversee the work of subcontractors and control activities in compliance with specification procedure. Proper implementation of the phase construction work, preparatory, initial and follow up. Conducted testing of materials on site/off site in product implied the required design and specification. Evaluated and approved change order, variation and process contractor monthly billing report with regards to actual field production accomplished on that period. Conduct a safety tool box morning meeting for all workers. Activity hazards analysis orientation before any start of definable features of work. Include safety issued during the preparatory phase meeting on site. Daily production and inspection report submitted to client for reference and information. Filing system for all correspondence, approve submittals and daily update of as built plan on site.
Quality Control Manager Feb 2007 to Aug 2007
Index Builders, Inc.
Repair of Water Reclamation Facility Drying Bed (Marine Corps Base Kaneohe) Materials take off and buy out. Prepared work schedule and weekly accomplishment report. Conduct weekly safety rules regarding work related. Monitor daily activities and material on site. Prepare all the submittals as per plan and specification. Daily update of as- built plan on site. Prepare the quality control plan with specification procedure. Proper implementation of the three phases of construction work, preparatory, initial and follow up, inspection for all architectural, structural, mechanical, plumbing, electrical and other related work. Conducted testing of materials on site/off site in product implied the required design and specification. Evaluated and approved change order, variation and process contractor monthly billing report with regards to actual field production accomplished on that period. Conduct a safety tool box morning meeting for all workers. Activity hazards analysis orientation before any start of definable features of work. Include safety issued during the preparatory phase meeting on site. Daily production and inspection report submitted to client for reference and information. Filing system for all correspondence, approved submittals and daily update as-built plan. Field works control to ensure proper procedure and material done effectively.
. Quality Control /Estimator Jul 2006 to Jan 2007
Acutron Company, Inc.
Waikiki Beach Walk Hotel
State Veteran (Ewa Beach)
Responsible for the field noted and engineering data for proper implementation on site. Estimated work progress and production for all trade and discipline. Monitored daily activities and resolved field technicalities on site.
Coordinate with materials suppliers for the right delivery materials on site. Estimated materials needed on project. Execute other office engineering work. Project Engineer Jan 2004 to June 2006
Group Builders, Inc.
Waipouli Beach Resort (Kauai)
First Hawaiian Bank (Waikiki)
Responsible for planning and estimate, organization of projects within engineering work until the completion time. Review product suitable for the project compliance with the plans and specification and contract. Checked materials delivered on site in conformance of the approved submittals. Daily inspection of work, and daily production report submitted to client for reference and information. General Manager-Owner Jan 1991 to Aug 2003
Petro Seal Marketing (Manila, Philippines)
Managed and coordinated daily sales activities. Had been working on rubber fabrication for 13 years. Contributed to all aspects of fabrication such as fabrication of all kinds of rubber o-ring, bushing, hydraulic pneumatic packing for sealing devices, fabrication of ceramic coating for worn out shaft seal and fabrication of carbon seal and installation mechanical seal. Planning and Cost Engineer Feb 2001 to Aug 2002
Traffic Haus Logistics Corp. (Manila, Philippines) Eight Story Commercial and Residential Condominium Prepared cost coding for manpower, equipment and materials to ensure proper costing compared to estimated budget. Evaluated actual cost estimate on site and control cost within the required budget. Monitored daily activities to ensure costing coding is in the right place. Responsible for testing concrete strength and steel bar tensile strength for proper specific design. Prepared work schedule weekly for each trade and discipline.
Project Engineer Mar 1981 to Jan 1991
Predicor Corporation (Quezon City, Philippines) PG-4 Manila Water Supply System (MWSS):
Magat Dam Augus IV Dam, Pulagi 1 Dam National Power Corp. (NPC) Assist Manila Water Supply System (MWSS) in planning. Installation, erection and full welding of penstock pipeline for hydro electric company (National Power Corp.). Planned and formulated engineering program. Ensure compliance of product design with customer contract requirements and related specifications. Apply knowledge of excavation, arc welding (automatic welding machine), backfilling, hydro testing and main pipeline.
Training & Certifications
Construction Quality Management for Contractors - NAVFAC/2020 OSHA 30-hrs Safety and Health Training- Nan, Inc.
OSHA 10-hrs Safety and Health Training - John C. Ramos, CSP, PE Rough-terrain Forklift Course - Nan, Inc.
Excavation and Trenching - Risk Solution Partners
Fall Protection Awareness - Safety System
Scaffold Erection - Safety System –
CPR & First Aid Training
Powder Actuated Tools Certified
Drug Prevention and Awareness Training
Familiar with American with Disabilities Act code compliance & due diligence reporting and the Uniform Building Code and related construction industry codes Familiar with Unified Facilities Guideline Specifications & related Federal Agency codes and the COE EM 385-1-1 (November 3, 2003 issue), Site Hazards Identification & Safety Compliance and 29 CFR 1926 Regulation