RESUME
Name : ROMMEL C. TOLENTINO
Contact Address : BRGY.KAINGIN SAN PASCUAL BATANGAS Mobile # : +61-048*******/+63-946-***-****
E-Mail Address : ******************@*****.***
Position Desire : MECHANICAL FITTER
PERSONAL DATA
Age : 40 YEARS OLD
Date of Birth : 21 APRIL 1982
Place of Birth : BRGY.BALETE BATANGAS CITY PHILIPPINES
Gender : MALE
Civil Status : MARRIED
Religion : ROMAN CATHOLIC Passport Number : P2102699B
Issuing Authority : DFA BATANGAS Date of Issue : 06 MAY 2019
Expiry date : 05 MAY 2029
EDUCATIONAL BACKGROUND:
TERTIARY
Degree : BACHELOR OF INDUSTRIAL TECHNOLOGY MAJOR IN AUTOMOTIVE ENGINEERING TECHNOLOGY
School : BATANGAS STATE UNIVERSITY
Address : JP RIZAL AVENUE BATANGAS CITY, PHILIPPINES
Date : JUNE 5, 1999 - MARCH 24, 2002
ELIGIBILITY : CERTIFIED PLANT MECHANIC (CPM)
Conducted by : PROFESSIONAL REGULATION COMMISSION (PRC)
PRC License No 0010136
Registration Date : 04/03/2017
VOCATIONAL COURSE:
Course INDUSTRIAL INSTRUMENTATION AND PROCESS CONTROL TRAINING COURSE FOR INSTRUMENT TECHNICIAN
School I &E INDUSTRIAL SYSTEM SERVICES INC.
Certificate No. 00-10-ELC-B25-070
Date MARCH 04, 2010-OCT 10, 2010
SECONDARY
Degree : 4 YEARS SECONDARY HIGH SCHOOL
School : BALETE NATIONAL HIGH SCHOOL
Address : BRGY.BALETE BATANGAS CITY, PHILIPPINES
Date : JUNE 8, 1995 - MARCH 31, 1999
CERTIFICATIONS/TRAININGS:
Title :TROPICAL BASIC OFFSHORE SAFETY INDUCTION AND EMREGENCY TRAINING WITH EMERGENCY BREATHING SYSTEM AND TRAVEL SAFETY BY BOAT (TBOSIET WITH EBS AND TSB)
Conducted by : IDESS MARITIME CENTRE (SUBIC) INC.
Certificate No 00565906170818248
Date : AUG. 15-17, 2018
Title FLANGE INTEGRITY MANAGEMENT
Conducted by SITE SKILLS GROUP PTY LTD
Date 8 AUG. 2018
Title ABRASIVE WHEELS
Conducted by IDESS MARITIME CENTRE (SUBIC) INC.
Date 14 AUG. 2018
Title ASBESTOS AWARENESS
Conducted by ATLAS ENGAGE
Date 28 JUL. 2018
Title PRESSURE TESTING
Conducted by ATLAS ENGAGE
Date 28 JUL. 2018
Title PUMPS SELECTION, OPERATION &MAINTENACE, SOLAR PANEL INSTALLATION AND INDUSTRIAL POWER SYSTEM ANALYSIS FOR PEZA COMPLIANCE
Conducted by IMPEDANZ ERTC/ ENGINEERING REVIEW, TRAINING AND CONSULTANCY
Date AUG.05, 2017
Title BASIC PLC TRAINING COURSE BATCH 17
Conducted by BESTECH INDUSTRIAL & TECHNICAL TRAINING CENTER INC.
Certificate no. BITTCI BPLC B17-5/6-0120 Date JUL. 15-16/22-23, 2017
Title ON THE JOB TRAINING FOR INDUSTRIAL INSTRUMENTATION AND PROCESS CONTROL TRAINING COURSE
Conducted by I&E INDUSTRIAL SYSTEM SERVICES INC.
Date APRIL 10, 2010-OCTOBER 31, 2010
EMPLOYMENT HISTORY:
I.PRESENT
Employer KAEFER Integrated Services Pty Ltd
Position Mechanical Fitter
Duration 18 Mar 2022-Present
Location Geraldton WA 6530
Site Coordinator John Reynolds
JOB DESCRIPTION
CONDUCT JOB HAZARD ANCONDUCT JOB HAZARD ANALYSIS AND SIGN IN TO VALID WORK PERMIT BEFORE PROCEEDING TO THE GIVEN TASK
PROPER USE OF ALL MECHANICAL HAND TOOLS NEEDED FOR THE JOB
FOLLOW JHA AND SAFETY PROCEDURES IN EVERY TASK TO PREVENT ACCIDENT
USE LOCK OUT AND TAG OUT SYSTEM IF REQUIRED ON THE TASK
READ AND UNDERSTAND TECHNICAL DRAWING
PUT OUT OF SERVICE TAG ON FAULTY TOOLS AND EQUIPMENT
INSTALL OVERHEAD CRANE GEAR BOX AND MOTOR ASSEMBLY
REPLACE O-RING TYPE GASKET ON HYDRAULIC PIPELINE AND PERFORM FLANGE MANAGEMENT
MODIFY MOTHER CATHODE RACK ASSEMBLY
REPLACE PILLOW BLOCK BEARING OF SCRAPPER BRUSH
REPLACES SCRAPPER ASSEMBLY BELT TYPE CONVEYOR
REPLACED CONVEYOR CHUTE LINING
REPLACED LUBE OIL O-RING TYPE GASKET AND PERFORM FLANGE MANAGEMENT
REPLACED GUIDE ROLLERS IN BELT TYPE CONVEYOR
PERFORM CHUTE LINING ALIGNMENT
REPLACED ROLLERS IN BELT TYPE CONVEYOR
ASSEMBLED AND INSTALL SAFETY EYE SHOWER ON CATHODE STRIPPING MACHINE AREA
INSTALLED HYDRAULIC CONTROL VALVE
FIT-UP AND INSTALL DUCTING ASSEMBLY
MODIFY GREASE TUBING FOR PILLOW BLOCK LUBRICATION SYSTEM
INSTALL CONVEYOR GUARDING
INSTALLED FLOATATION VALVE
REPLACED CENTRIFUGAL PUMP MECHANICAL SEAL AND BEARING
REPLACED RUBBER LINING AND BELT OF CENTRIFUGAL SLURRY PUMP
INSTALL CHAIN FOR MOTOR AND GEAR BOX
INSTALL NEW CENTRIFUGAL SLURRY PUMP ASSEMBLY AND ALIGNMENT OF BELT
PERFORM CUTTING, GRINDING, DRILING REQUIRED FOR MODIFICATION WORKS
INTERPRET PIPING AND INSTRUMENTATION DIAGRAM (PID)
II.(11 MONTHS)
Employer : RM LOGISTIC AND INDUSTRIAL SERVICES
Position : Mechanical Fitter
Industry : Logistic and Industrial Services
Duration : 18 NOV 2019- 31 OCT 2020
Location : Manghinao, Bauan Batangas, Philippines
Supervisor : Engr. Richard A. Mendoza
JOB DESCRIPTION
STUDY AND EXECUTE EQUIPMENT REPAIR MANUAL
DISMANTLING AND CALIBRATION OF PRESSURE RELIEF VALVE
PRESERVATION OF ALL ROTATING EQUIPMENT
INSTALLATION OF PIPE VIBRATION SUPPORT WITH CUTTING AND GRINDING ACTIVITIES
PREVENTIVE MAINTENANCE OF ALL UTILITY EQUIPMENT
PERFORM JOB HAZARD ANALYSIS(JHA)
PERFORM VISUAL INSPECTION OF MECHANICAL TOOLS REGULARLY
PREVENTIVE MAINTENANCE OF ALL LIFTNG EQUIPMENT
PRESERVATION OF ALL KINDS OF VESSEL/PUMPS/MOTOR/ROTATING MACHINE AND EQUIPMENT
PARTICIPATE IN DAILY TOOLBOX MEETING
DO HOUSE KEEPING BEFORE AND AFTER ANY TASK
REPLACE NDE/ DE MOTOR BEARING
PERFORM SHAFT ALIGNMENT
REPLACE PIPING GASKET AND PERFORM FLANGE MANAGEMENT ACTIVITY
CALIBRATION OF PRESSURE SAFETY VALVE (PSV)
DIESEL ENGINE TROUBLESHOOTING AND REPAIR
PERFORM LINE CHECK AND PUT BLIND BEFORE BREAKING ANY PIPELINE DIAGNOSIS AND REPAIR OF HYDRAULIC/PNEUMATIC SYSTEM
III.(7 MONTHS)
Employer : AMEC FOSTER WHEELER (AFW)
Client : BRUNEI SHELL PETROLEUM (BSP)
Position : MECHANICAL FITTER
Industry : OIL AND GAS
Duration : 28 AUG 2018 – 22 MAR 2019
Location : BRUNEI DARUSSALAM
Supervisor : SAMUEL IAN KAY
JOB DESCRIPTION
•REMOVAL OF POTABLE WATER PUMP/REPLACE DE AND NDE BEARING OF MOTOR
•APPLY WORK PERMIT ON PTW OFFICE
•STUDY AND EXECUTE EQUIPMENT REPAIR MANUAL
•PERFORM JHA TO ILIMINATE HAZARD RELATED TO TASK
•PREVENTIVE MAINTENANCE OF ESSENTIAL DIESEL GENERATOR
•SHAFT ALIGNMENT OF FLASH GAS COMPRESSOR/WATER INJECTION PUMP(WIP)/CRUDE OIL PUMP/DIESEL TRANSFER PUMP/STEAM TURBINE
•MAINTENANCE OF PORTABLE DIESEL WELDING MACHINE
•REPAIR OF POTABLE WATER PUMP
•DISMANTLING AND CALIBRATION OF PRESSURE RELIEF VALVE
•PRESERVATION OF ALL ROTATING EQUIPMENT
•INSTALLATION OF MONORAILCRANE
•INSTALLATION OF FIRE WATER JOCKEY PUMP
•INSTALLATION OF PIPE VIBRATION SUPPORT WITH CUTTING AND GRINDING ACTIVITIES
•PREVENTIVE MAINTENANCE OF ALL UTILITY EQUIPMENT
NOTE: MARCH 2017-APRIL 2018 STUDY AND TAKE THE LICENSURE BOARD EXAM FOR CERTIFIED PLANT MECHANIC (CPM)
IV.(1 YEAR AND 3 MONTHS)
Employer : ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC. (AG&P)
Client : CHEVRON
Position : MECHANICAL TECHNICIAN
Industry : OIL AND GAS
Duration : 29 OCT. 2015 – 13 JAN. 2017
Office address : BURGUNDY TOWER ORTIGAS PASIG CITY, PHILIPPINES
Location : ANGOLA WEST AFRICA
Manager : MARJOHN M. RICAMARA
JOB DESCRIPTION
INSTALLATION OF SEA WATER LIFT PUMPS WITH PRESERVATION INCLUDED
PREVENTIVE /CORRECTIVE MAINTENANCE OF ESSENTIAL DIESEL GENERATOR
MAINTENANCE OF FIRE WATER PUMP INCLUDING FUNCTIONAL TES T OF FIRE ALARM SYSTEM
INTERPRET AND EXECUTE PIPING AND INSTRUMENTATION DIAGRAM (PID)
PARTICIPATE IN DAILY TOOLBOX MEETING
APPLY VALID WORK PERMIT AT PERMIT TO WORK OFFICE (PTW)
PERFORM JOB HAZARD ANALYSIS(JHA)
DO HOUSE KEPPING BEFORE AND AFTER ANY TASK
PERFORM VISUAL INSPECTION OF MECHANICAL TOOLS REGULARLY
PREVENTIVE MAINTENANCE OF ALL LIFTNG EQUIPMENT
CALIBRATION OF PRESSURE SAFETY VALVE (PSV)
PRESERVATION OF FLASH GAS COMPRESSOR PRIOR TO START-UP
COMMISSIONING OF COOLING MEDIUM DISTRIBUTION AND RETURN SYSTEM
COMMISSIONING OF CLOSE DRAIN VESSEL
COMMISSIONING AND START-UP OF HYPOCHLORITE SYSTEM
PREVENTIVE AND CORRECTIVE MAINTENANCE OF PEDESTAL CRANE
COMMISSIONING OF FIRE WATER DELUGE SYSTEM
OPERATION AND MAINTENACE OF AIR COMPRESSOR
COMMISSIONING OF INSTRUMENT AND UTILITY AIR COMPRESSOR
COMMISSIONING OF POTABLE AND UTILITY WATER SYSTEM
COMMISSIONING OF FIRE WATER AND FOAM HOSE REEL
OPERATOR AND MAINTENANCE OF FIRE WATER JOCKEY PUMP
FUNCTION TEST AND LOAD TEST OF MONORAIL HOIST
COMMISSIONING OF MULTI- MEDIA FILTER SYSTEM
OPERATION AND MAINTENANCE OF SEAWAGE SYSTEM
COMMISSIONING OF DIESEL TRANSFER PUMP
OPERATION AND MAINTENANCE OF REVERSE OSMOSIS WATER MAKER (RO WATER MAKER)
COMMISSIONING OF CORRUNGATED PLATE INTERCEPTOR (CPI)
COMMSSIONING OF OPEN DRAIN SYSTEM
PRESERVATION OF ALL KINDS OF VESSEL/PUMPS/MOTOR/ROTATING MACHINE AND EQUIPMENT
V.(6 MONTHS)
Employer : ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC. (AG&P)
Client : TOTAL
Position : MECHANICAL TECHNICIAN
Industry : OIL AND GAS
Duration : 14 FEB. 2014 - 29 AUG. 2014
Office address : BERGUNDY TOWER ORTIGAS PASIG CITY, PHILIPPINES Location : ANGOLA WEST AFRICA
Manager/Supervisor : MARJOHN M. RICAMARA
JOB DESCRIPTION
INSTALLATION AND COMMISSIONING OF SEA WATER LIFT PUMP(SWLP)
CONDUCT GAS TEST PRIOR TO CONFINE SPACE ENTRY
APPLY WORK PERMIT FOR THE NEXT TASK
PERFORM LINE CHECK AND PUT BLIND BEFORE BREAKING ANY PIPELINE
PRESERVATION AND PERFORM LOAD TEST ON OVERHEAD CRANE
INSTALLATION AND COMMISSIONING OF FLARE BOOM WINCH HOIST
PRESERVATION OF GAS TURBINEGENERATOR AND COMPRESSOR
COMMISSIONING OF FIRE WATER PUMP
INSTALLATION AND COMMISSIONING OF CLEANING MEMBRANE PACKAGES
COMMISSIONING AND PRESERVATION OF CRUDE OIL EXPORT PUMP
COMMISSIONING AND PRESERVATION OF CHLORINATION PACKAGE
INSTALLATION AND COMMISSIONING OF DE-SALTER WATER PUMP
COMMISSIONING AND PRESERVATION OF METHANOL PUMP
PERFORM HYDRO TEST OF WATER BOOSTER PUMP PIPELINE
STRUCTURAL REVISION OF IN FILL PLATE
PAINTING JOB
CALIBRATION OF PRESURE RELIEF VALVE
VI. (1 YEAR AND 2 MONTHS)
Employer ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC.(AG&P)
Position MECHANIC
Industry HEAVY FABRICATION YARD
Duration 02 JAN. 2013 – 05 FEB. 2014
Office Add SAN ROQUE BAUAN BATANGAS.PHILIPPINES
Supervisor ENGR.RICHARD M. MENDOZA
JOB DESCRIPTION
MECHANICAL AND ELECTRICAL MAINTENANCE OF THE FOLLOWING EQUIPMENTS:
CRAWLER CRANE
HYDRAULIC PRESS
TRAILER TRUCK
FORKLIFT
TELESCOPIC CRANE
OVERHEAD CRANE
FIRE TRUCK
SHUTTLE BUS
MONORAIL CRANE
JIB CRANE
TOWER CRANE
PORTABLE WELDING MACHINE
DIESEL GENERATOR DUMP TRUCK AIR COMPRESSOR
LAY OUT CUTTING MACHINE DRILLING MACHINE
VII.(1 YEAR & 5 MONTHS)
Employer ATLANTIC GULF PACIFIC COMPANY OF MANILA INC. (AG&P)
Position MECHANIC
Industry HEAVY FABRICATION YARD
Duration 05.JUL.2011 - 31 DEC. 2012
Office Add SAN ROQUE BAUAN BATANGAS, PHILIPPINES
Supervisor RICHARD M. MENDOZA
JOB DESCRIPTION
DIESEL / GASOLINE ENGINE OVERHAULING
ENGINE TRUOBLE SHOOTING
UNDER CHASIS REPAIR
DIAGNOSIS AND REPAIR OF HYDRAULIC/PNEUMATIC SYSTEM
REPAIR AND SERVICING OF POWER TRAIN COMPONENTS
TROUBLE SHOOTING AND REPAIR OF THE FOLLOWING EQUIPMENTS
•CRAWLER CRANE, TELESCOPIC CRANE, OVERHEAD CRANE, BACKHOE, PAY LOADER, INTERNATIONAL TRACTOR, FORK LIFT, SHUTTLE BUS GENERATOR AND COMPRESSOR
MAINTENANCE OF WORKSHOP EQUIPMENTS
•HYDRAULIC PRESS, DRILL PRESS, BENDING MACHINE, LAY OUT & CUTTING MACHINE
VIII.(4 MONTHS)
Employer ATLANTIC GULF PACIFIC COMPANY OF MANILA INC.(AG&P)
Position MECHANIC 1
Industry HEAVY FABRICATION YARD
Duration 23 FEB. 2011 – 29 JUN. 2011
Office Address SAN ROQUE BAUAN BATANGAS PHILIPPINES
Supervisor RICHARD M. MENDOZA
JOB DESCRIPTION
MAINTENANCE OF THE FOLLOWING EQUIPMENTS:
CRAWLER CRANE
HYDRAULIC PRESS
TRAILER TRUCK
FORKLIFT
TELESCOPIC CRANE
OVERHEAD CRANE
FIRE TRUCK
SHUTTLE BUS
MONORAIL CRANE
PORTABLE WELDING MACHINE
TOWER CRANE
JIB CRANE
LAY OUT CUTTING MACHINE
DUMP TRUCK
AIR COMPRESSOR
DIESEL GENERATOR
DRILLING MACHINE
NOTE: MARCH 04, 2010-OCTOBER 10,2010 STUDY INDUSTRIAL INSTRUMENTATION AND PROCEES CONTROL TRAINING COURSE FOR INSTRUMENT TECHNICIAN.
IX.(2 MONTHS)
Employer ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC.(AG&P)
Position MECHANIC 1
Industry HEAVY FABRICATION YARD
Duration 22 JAN. 2010- 26 FEB. 2010
Office Address SAN ROQUE BAUAN BATANGAS PHILIPPINES
Supervisor RICHARD M. MENDOZA
JOB DESCRIPTION
MAINTENANCE OF THE FOLLOWING EQUIPMENTS:
CRAWLER CRANE
HYDRAULIC PRESS
TRAILER TRUCK
FORKLIFT
TELESCOPIC CRANE
OVERHEAD CRANE
FIRE TRUCK
SHUTTLE BUS
MONORAIL CRANE
PORTABLE WELDING MACHINE
TOWER CRANE
JIB CRANE
LAY OUT CUTTING MACHINE
DUMP TRUCK
AIR COMPRESSOR
DIESEL GENERATOR
DRILLING MACHINE
X.(5 MONTHS)
Employer ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC.(AG&P)
Position MECHANIC 1
Industry HEAVY FABRICATION YARD
Duration 26 AUG. 2010-26 FEB.2010
Office Add SAN ROQUE BAUAN BATANGAS PHILIPPINES
Supervisor RICHARD M. MENDOZA
JOB DESCRIPTION
ENGINE TROUBLE SHOOTING AND REPAIR
REPAIR OF HYDRAULIC AND PNEUMATIC SYSTEM
MAINTENANCE OF 600KW DIESEL GENERATOR
SERVICE AND REPAIR OF POWER TRAINS
MECHANICAL AND ELECTRICAL MAINTENANCE OF THE FOLLOWING
EQUIPMENTS:
CRAWLER CRANE
HYDRAULIC PRESS
TRAILER TRUCK
FORKLIFT
TELESCOPIC CRANE
OVERHEAD CRANE
FIRE TRUCK
SHUTTLE BUS
MONORAIL CRANE
PORTABLE WELDING MACHINE
TOWER CRANE
JIB CRANE
LAY OUT CUTTING MACHINE
DUMP TRUCK
AIR COMPRESSOR
DIESEL GENERATOR
DRILLING MACHINE
X. (10 MONTHS)
Employer ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC(AG&P)
Client CHEVRON
Position MECHANICAL TECHNICIAN
Industry OIL AND GAS
Duration 19 JAN. 2009- 4 NOV 2009
Office Add BURGUNDY TOWER ORTIGAS PASIG CITY, PHILIPPINES
Manager CHITO B. ADVIENTO
JOB DESCRIPTION
COMMISSIONING OF SEA WATER LIFT PUMP
COMMISSIONING OF GAS TURBINE GENERATOR
COMMISSIONING OF GAS TURBINE COMPRESSOR
COMMISSIONING OF CHEMICAL INJECTION PUMP
INSTALLATION & COMMISSIONING OF HIGH-PRESSURE COMPRESSOR
INSTALLATION OF LOW-PRESSURE COMPRESSOR
INSTALLATION & COMMISSIONING OF WATER INJECTION PUMP
COMMISSIONING OF BRIDGE CRANE
INSTALLATION AND COMMISSIONING OF MONORAIL CRANE
MAINTENANCE OF TEMPORARY DIESEL GENERATOR
PRESERVATION OF MECHANICAL ROTATING EQUIPMENT
SHAFT ALIGNMENT OF TURBINE GENERATOR AND COMPRESSOR
CALIBRATION OF PRESSURE RELIEF VALVE
MAINTENANCE OF PEDESTAL CRANE
XI.(5 MONTHS)
Employer ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC. (AG&P)
Client CHEVRON
Position MECHANICAL FITTER
Industry OIL AND GAS
Duration 17 FEB 2008- 24 JULY 2008
Office Add BURGUNDY TOWER ORTIGAS PASIG CITY, PHILIPPINES
Manager CHITO B. ADVIENTO
JOB DESCRIPTION
SIGN JHA AND PERMIT BEFORE COMMENCING THE TASK
CONDUCT GAS TEST ON WORK AREA WHEN REQUIRE
PROPER USE OF ALL MECHANICAL HAND TOOLS
WORK ON CONFINED SPACE
READ PIPING AND INSTRUMENTATION DRAWING (PID)
READ ENGINEERING DRAWINGS OR PLANS
PERFORM LINE CHECK ON PROCESS LINE AS REQUIRE FOR COMMISSIONING
COMMISSIONING OF SEA WATER LIFT PUMP (SWLP)
COMMISSIONING OF GAS TURBINE GENERATOR (GTG)
COMMISSIONING OF GAS TURBINE COMPRESSOR (GTC)
COMMISSIONING OF CHEMICAL INJECTION PUMP
INSTALLATION AND COMMISSIONING OF HIGH PRESSURE COMPRESSOR
INSTALLATION AND COMMISSIONING OF LOW PRESSURE COMPRESSOR
INSTALLATION AND COMMISSIONING OF WATER INJECTION PUMP (WIP)
COMMISSIONING OF BRIDGE CRANE
INSTALLATION AN COMMISSIONING OF MONORAIL CRANE
MAINTENANCE OF TEMPORARY DIESEL GENERATOR
INSTALLATION AND COMMISSIONING OF FLARE BOOM WINCH HOIST
XII. (9 MONTHS)
Employer ATLANTIC GULF AND PACIFIC COMPANY OF MANILA INC. (AG&P)
Position MECHANIC 1
Industry HEAVY FABRICATION YARD
Duration 30 MAY 2007.-16 FEB.2008
Office Add SAN ROQUE BAUAN BATANGAS. PHILIPPINES
Manager CARLOS HUFANA
JOB DESCRIPTION
MECHANICAL AND ELECTRICAL MAINTENANCE OF THE FOLLOWING EQUIPMENTS:
CRAWLER CRANE
HYDRAULIC PRESS
TRAILER TRUCK
FORKLIFT
TELESCOPIC CRANE
OVERHEAD CRANE
FIRE TRUCK
SHUTTLE BUS
MONORAIL CRANE
TOWER CRANE
JIB CRANE
PORTABLE WELDING MACHINE
LAY OUT CUTTING MACHINE
DUMP TRUCK
AIR COMPRESSOR
DIESEL GENERATOR
DRILLING MACHINE
XIII.(11 MONTHS)
Employer OTTOZONE
Position AUTO MECHANIC
Industry AUTOMOTIVE SERVICE CENTER
Duration 10 NOV. 2005 -15 DEC.2006
Office Add ALANGILAN BATANGAS CITY, PHILIPPINES
Manager ROGELIO L. CANDELARIO
JOB DESCRIPTION
1.GASOLINE/DIESEL ENGINE TROUBLE SHOOTING AND REPAIR
2.GASOLINE /DIESEL ENGINE OVERHAULING
3.UNDER CHASIS REPAIR
4.COMPUTERIZED WHEEL ALIGNMENT
5.WHEEL BALANCING
6.ELECTRICAL DIAGNOSIS AND REAPAIR
7.REPAIR OF POWER TRAIN SYSTEM:
CLUTCH
PROPELLER
CROSS JOINT
TRANSMISSION
DIFFERENTIAL
XIV.(6 MONTHS)
Employer CANDELARIO AUTOMOTIVE SERVICE CENTER (CAS)
Position AUTO MECHANIC
Industry AUTOMOTIVE SERVICE CENTER
Duration 05 FEB.2004-20AUG.2005
Office Add ALANGILAN BATANGAS CITY, PHILIPPINES
Manager ROGELIO L. CANDELARIO
JOB DESCRIPTION
1.GASOLINE/DIESEL ENGINE TROUBLE SHOOTING AND REPAIR
2.GASOLINE /DIESEL ENGINE OVERHAULING
3.UNDER CHASIS REPAIR
4.COMPUTERIZED WHEEL ALIGNMENT
5.WHEEL BALANCING
6.ELECTRICAL DIAGNOSIS AND REAPAIR
7.REPAIR OF POWER TRAIN SYSTEM:
CLUTCH
PROPELLER
CROSS JOINT
TRANSMISSION
DIFFERENTIAL
XV.(11MONTHS)
Employer GLORY COMET TRADING AND SERVICES
Position AUTO MECHANIC
Industry AUTOMOTIVE SERVICE CENTER
Duration 10 JAN. 2002-01DEC. 2001
Office Add MAHABANG PARANG BATANGAS CITY, PHILIPPINES
Manager CARMELO GUDA
JOB DESCRIPTION
1.GASOLINE/DIESEL ENGINE TROUBLE SHOOTING AND REPAIR
2.GASOLINE /DIESEL ENGINE OVERHAULING
3.UNDER CHASIS REPAIR
4.COMPUTERIZED WHEEL ALIGNMENT
5.WHEEL BALANCING
6.ELECTRICAL DIAGNOSIS AND REPAIR
7.REPAIR OF POWER TRAIN SYSTEM:
CLUTCH
PROPELLER
CROSS JOINT
TRANSMISSION
DIFFERENTIAL
TOOLS AND EQUIPMENTS
Torque wrench Welding machine
Mechanical Pullers Vernier Caliper
Pipe wrench Combination wrench
Angle and pencil grinder Micrometer Caliper
Socket wrench Lathe Machine
Steel ruler Ball pen hammer
Hydraulic torque and tension Dial indicator
Drop Saw Oxy – Acetylene cutting outfit
FAMILY BACKGROUND:
Father : Martin R. Tolentino Birthday : November 11, 1948, Mother : Guadalope C. Tolentino Birthday : December 12, 1945, Spouse : Jonah Jim C. Tolentino Birthday : January 17, 1999, Brother : Rodel C. Tolentino
Birthday : April 14, 1981, Rico C. Tolentino July 15, 1984
Sister : Maricel T. Gonzales Birthday : December 18, 1988
CHARACTER REFERENCES :
Name : ENGR. RICHARD M. MENDOZA Company : KEO INTERNATIONAL CONSULTANTS Position : MECHANICAL SUPERVISOR
Email Add : ****************@*****.***/**************@****.*** Contact no. : +63-916-***-****/+974-****-****
Name : ENGR.LAZARO H. GARCES Company : JG SUMMIT PETRO CHEMICALS INC. Position : MECHANICAL SUPERVISOR
Email Add : ************@*****.*** Contact no. : +63-915-***-****
Name : MARK JOSEPH D. BADUA
Company : NESTLE PHILIPPINES BFC CPW ENG’G DEPT.
Position : MECHANIC 1
Email Add : **********.*****@**.******.*** Contact no. : +63-926-***-****