SOHAIL AHMAD
Civil &Track (Track Supervisor)
Mobile: +966-*********
Email: *************@*****.** Skype ID: sohailahmad
Career Highlights:
Aggressive, passionate engineering, eagerness to learn new ideas with 12+ years’ experience in Track Construction and Manitenance works in multi-disciplinary Track works Engineering aspects,
Experience as Track Supervisor in building of Slab Track, Ballast less, Ballast, Embedded & Pit Tracks, as per European Standards;
Experience to build and install 3rd Rail/Conductor Rail in Tunnel, At Grade, Viaduct, C&C;
Experience to build and install turnouts, in Tunnel, At Grade, Viaduct, C&C;
Experience to build and install Guard Rail, Check Rail in Tunnel, At Grade, Viaduct, C&C;
Experience to install MV Cable Ducts in Tunnel, At Grade, Viaduct, C&C;
Experience in Track Building as Slip Form Paving Method, Drilling Method, APPI Track Method, Top Down Method, Bottom Up Method, Plinth Construction Method;
Experience in Working on At Grade, Viaducts, Tunnel, Depot, Cut & Cover Sites.
Experience in Interface Coordination for Track work with System Wide Contractors.
Experience on projects like Riyadh Metro, Delhi Metro, Mumbai Metro, Mumbai Mono Rail.
~~Career Timeline~~
Designation
Organization
Tenure
Track Supervisor
FAST-Riyadh Metro Project (TJV)
Nov’19 – Onwards
Sr. Track Foreman
FAST-Riyadh Metro Project (TJV)
July’16 – Nov’19
Jr. Civil Engineer
Nagarjuna Contraction Company limited
Jun’15 – Jun’16
Civil Foreman
J. Kumar Infra Project Ltd
Jul’ 11 – May’15
Civil Foreman
Simplex Infrstructure Ltd
Oct’09 – Jun’11
Civil Foreman
Selmec Engineering Company
Dec’06 – Sep’09
Project Experience:
FAST Consortium (TJV), Riyadh Metro Rail Project
Track works Supervisor, July 2016-Current
Roles and Responsibility:
Installation and adjustment of Running rails/Guard Rail/Check Rail & 3rd Rail as per design.
Prepare Site specific plan and Site facilities plan.
Responsible for lifting plan and lifting activities at site
Submitting daily, weekly, monthly progress reports.
Fulfilling HSE requirement at site and attending HSE meetings / Trainings.
Track geometry inspections with the surveyors and Surveying construction works, in regards to relevant operation rules
Preparation of concrete slab casting by Slipform paver machine and APPI track machine.
Supervising, coordinating and scheduling the daily activities of construction trades people.
Training of workers in job duties, safety procedures and company policies.
Establishing methods to meet work schedules and coordinating work activities with other Departments/subcontractors/supervisors/managers.
Inspection, Check Lists, Risk Assessment;
Regular inspection of track and detailed inspection of track in respect to track slab and installation of Track.
Reporting to the Mainline Supervisor/Chef Superintendent and responsible for progress of the Track Work Construction & Interface Management and to ensure, with the support of the Track Work Safety Engineer, a safe workplace through the strict application of EHS procedures.
Preparing Site report for the General Consultant and deal with the entire Track Work Contractor. (Survey, Quality, Batching plant and Procurement) the other project entities and the client, operations.
Coordinating all construction interface activities and providing technical inputs for methodologies of construction & coordinating with Track works activities.
Coordinate with surveyor, Paver & Appitrack operators for concrete paving And Base Plate Installation.
Coordinate with quality engineers in batching plant and site.
Calculation of Quantity of Form work and concrete.
Taking of quantity of Form work and concrete.
Checking the layout of base plats& Steel cages.
Calculating and Checking the Quantities.
Execution of work as per approved drawing and fulfilling the requirements of checklist.
Preparing list of works & item to be done by contactors.
Taking of Quantities for keeping trace of material to be used at site.
Planning daily, weekly and monthly progress report.
Total co-ordination with the consultant, contractor.
Nagajurn Construction Company (NCC), Mumbai Metro Rail Project
Engineer, March 2016 to July 2016
Roles and Responsibility:
Study of Drawing /Revise Drawing and reporting for the changes.
Calculating and Checking the Quantities.
Execution of work as per approved drawing and fulfilling the requirements of checklist.
Preparing list of works & item to be done by contactors.
Taking of Quantities for keeping trace of material to be used at site.
Planning & preparing daily, weekly and monthly progress report.
Calculation of Quantity of Form work and concrete.
To supervise steelyard and co-ordination with commercial departments.
Taking of quantity of Form work and concrete.
Total co-ordination with the client and contractor.
Making B.B.S for Beam, Column, Slab, Raft& Foundation.
Checking the Shuttering of slab, Columns, Ramps, Retaining wall
Concreting Beams, Columns, Slab, Pier, Ramps, Raft, P.C.C, Foundation & Water proof.
Execution of pedestal layout preparation and construction as per drawings.
Daily Material inwards, Daily Consumption, Cube Test Report, RMC Report, Etc.
Checking Shuttering, Checking Pre-Concreting & Post concreting inspection.
J Kumar Infra Project Ltd, Mumbai Mono Rail Project
Foreman, July 2011 to March 2016
Roles and Responsibility:
Study of Drawing /Revise Drawing and reporting for the changes.
Calculating and Checking the Quantities.
Execution of work as per approved drawing and fulfilling the requirements of checklist.
Preparing list of works & item to be done by contactors.
Taking of Quantities for keeping trace of material to be used at site.
Planning & preparing daily, weekly and monthly progress report.
Calculation of Quantity of Form work and concrete.
To supervise steelyard and co-ordination with commercial departments.
Taking of quantity of Form work and concrete.
Total co-ordination with the client and contractor.
Making B.B.S for Beam, Column, Slab and Raft Foundation.
Checking the Shuttering of slab, Columns, Ramps, Retaining wall
Concreting Beams, Columns, Slab, Pier, Ramps, Raft, P.C.C, Foundation & Water proofing.
P.C.C for open foundation and pile cape.
Execution of pedestal layout preparation and
Checking Shuttering, Checking Pre-Concreting & Post concreting inspection.
Preparing subcontractors MB.
Simplex Infra Structure Ltd, Mumbai Metro Rail Project
Supervisor, October 2009 to June 2011
Role and responsibility:
Study of Drawing /Revise Drawing and reporting for the changes.
Calculating and Checking the Quantities.
Execution of work as per approved drawing and fulfilling the requirements of checklist.
Preparing list of works & item to be done by contactors.
Taking of Quantities for keeping trace of material to be used at site.
Planning & preparing daily, weekly and monthly progress report.
Calculation of Quantity of Form work and concrete.
To supervise steelyard and co-ordination with commercial departments.
Taking of quantity of Form work and concrete.
Total co-ordination with the client and contractor.
Making B.B.S for Beam, Column, Slab, Raft& Foundation.
Checking the Shuttering of slab, Columns, Ramps, Retaining wall
Concreting Beams, Columns, Slab, Pier, Ramps, Raft, P.C.C, Foundation & Water proofing.
P.C.C for open foundation and pile cape.
Execution of pedestal layout preparation and construction as per drawings.
Daily Material inwards, Daily Consumption, Cub Test Report, RMC Report, Standard
Division, Quality Control Performa, All Report & Etc...
Checking Shuttering, Checking Pre-Concreting & Post concreting inspection.
Preparing subcontractors MB.
Pilling
Initial routing test.
Workability test of fresh concrete.
Selmec Engineering Construction Company
Supervisor, December 2006 to September 2009
Role and responsibility:
Study of Drawing /Revise Drawing and reporting for the changes.
Calculating and Checking the Quantities.
Execution of work as per approved drawing and fulfilling the requirements of checklist.
Preparing list of works & item to be done by contactors.
Technical Education:
Diploma in Civil Engineering from Polytechnic College Patna, Bihar
Computer Skills: knowledge of MS. Office & Autocad
~~Personal Dossier~~
Iqama Status: Transferrable [Local Hire] Date of Birth: 5th March 1983
Nationality: Indian Language: English, Urdu, Hindi & Arabic [Intermediate]
Address: Riyadh.