To,
The Personal General Manager
Subject: Application for the post of Manager of Power Plant and power system. Dear Sir,
Having came to know about the vacancy in your global organization for the above- mentioned post, I would like to offer my candidature for the same. Please find enclosed here with my detailed ‘C.V’ the perusal of which I am sure would enable you to take a valuable and favorable decision. Thanking you.
Yours faithfully,
R.Banerjee Date : 25.09.2020
RESUME
RAJIB BANERJEE CURRENT ADDRESS
Kolkata (West Bengal) RTM Staff Colony, D-Block
Mob: 099******** RoomNo:D 46,Pachpahar Road
Email: ****************@*****.*** Bhawanimanid, Raj-326502 Career Objective
15 years of experience Operation & maintainance in Solar Power Plant,132KV, 33KV, 11KV Sub- Station, different type of DG Sets like Wartsila HFO Fuel type, Cummins,12MW coal base Thermal Power Plant. Extensive experience in carrying out activities such as erection& commissioning, troubleshooting, preventive, predictive and breakdown maintenance, modification,spare management, documentation as per ISO 9000:2000 QS standards. To extract all possible knowledge, whether theoretical or practical and to utilize at its optimum level and also keep updating my knowledge according to market demand so that I must be always head hunted wherever I stand.
PERSONAL INFORMATION:
Father's Name : Shri Sailen Banerjee.
Mother Name : Smt.Sawpna Banerjee
Date of Birth : 28Th. December 1981
Marital Status : Married.
Language Known : Hindi, English & Bengali.
Nationality : Indian.
Passport : Valid.
ACADEMIC & TECHNICAL EDUCATION:
Place Year
H.S.C. in Science Kolkata (W.B.) 1997
B.E ( Elect) Bhopal (M.P.) 2005
Present Status:
Presently working with Sutlej Textile & Industries Ltd. (R.T.M) Bhawani Mandi (Raj.), K.K.Birla group as an Power Plant In charge of Solar Plant (3.8 MW), Wartsila Power Plant (4.2 M.W X 2) & 132/11 KV Sub-station from 2010 to still. Past Status:
Power Plant In charge. in the R.S.W.M LTD. (LNJ Group) at Bhilwara from 17 Nov 2008 to 2010. ( 2.8 M.W *3 + 2.1 *1 M.W) & Solar Plant 2.8 MW.
Joined Ritspin Synthetics Limited at Indore as Asst. Manager (Power Plant) in the year 2006 to 2008 (3.9 M.W * 1, 12V32LN)
Joined Rajshree Textile Mills, Kolkata as Engineer for FO base Wartsila Engine from 2005 to 2006.
Profile of Responsibilities
Operation & Management for electrical side of Solar Power Plant, 132/11KV Sub-Station, 33/11KV Sub-Station and all H.T. System of the plant.
Operation & Management for electrical side of Solar Power Plant, Wartsila DG power plant of capacity 8 MW, having 02 nos 4.1 M.W of 12V32LN & two waste heat recovery boilers of capacity 2 ton. X 02 Nos.
Operation & Management for electrical side of 12MW Thermal power plant. Other responsibility as follows:
Operation & maintainance & erection of Solar Power Plant .
Possess strong skills in PROJECT PLANNING and MONITORING PROJECT PROGRESS.
Power study of plant machinery & preparation of energy conservation proposals and their implementation.
Planning day today routine, preventive & corrective maintenance and Breakdowns etc.
Planning, Designing and scheduling work of HT/LT distribution & loss in distribution systems.
Estimation & Costing work for PROJECT PLANNING and ENGG DEPTT.
Liasoning work related to ELECTRICITY BOARD, ELECTRICITY REGULATORY COMMISSION & Electrical Inspectorate and GOVT Body.
Utilization of electrical energy, Maximum demand control, Power factor improvement & loss reduction in system.
Skilled at advance planning of purchase functions, involving cost estimation & finalization for purchase of all TECHNOLOGY PARTS.
Handling new projects and maintains the cost of new projects.
Maintenance of DG SETS, SUBSTATION, COMPRESSORS etc.
Finalizing the requirements and specifications, ensuring the completion of project within the specified time & cost parameters and effective resource utilization to maximize the output.
Decreased the schedule maintenance down time hrs. Operate the plant with the minimum consumption of spare, well with in the budget.
Maintenance of 132 K.V, 33KV & 11KV S/S Transformers (12500,3300, 2000 & 1000 KVA), SF6 (2000Amp, 132KV), MOCB (1250 Amp, 11KV), Isolators 132KV, H.T panels, L.T panels, VCB (11 KV, 33 KV& 132KV) & Distribution Boards etc.
Good knowledge of planning & implementation of open excess power purchased system.
Preparation of annual Budget, Power costing, Monthly Performance Report and its implementation.
Spare parts planning of all Electrical & Mechanical Installation and their implementation.
Inventory control of Engg. related items.
Key Achievements
RECENT PROJECTI am looking here the complete project from Electrical Side. The Project completion cost is around 700 crore in which Electrical tender cost is more than 20 crore excluding the cost of 2.9MW solar plant, 132/11KV, ABB make Sub- Station, capacity 12.5MVA * 03 Nos Transformers, D.G. Sets, and 35000 spl Millange spinning plan at Sutlej Industries in 2017.
Attended 60000hrs major overhauling of Wartsila 12V32LN engine. Have done 88000hrs major overhauling of Wartsila 8R32LN engine.Also I have done 84000hrs major overhauling of Wartsila 6R32LN engine. SKILL
Diploma in Computer programming (C, C++).
Microsoft word, Excel, Internet
Interest & Hobbies
Playing Cricket and football.
Listening music.
Traveling.
Strengths
Positive attitude towards my work.
Smart working nature.
Dedicated.
Present Salary : 6.50 Lakhs /Annum + Family furnished Accommodation + Mobile.
Salary Expected : Negotiable
DECLARATION:
I the undersigned hereby declare that the above information is true and correct to the best of my knowledge and belief. I also undertake to provide all necessary testimonials for verification submission, whenever demanded.
Date: 25.09.2020
Place. Pachpahar Road (R.Banerjee)
Bhawanimandi,(Raj.)