CHANDRA BHUSHAN SINGH
S/O Shri – Ram Dayal Singh,
Village - Fatehpur, PO - Raghopur,
Distt-Vaishali, Bihar-844508 (INDIA)
Contact: +91-990*******, +91-990******* (WhatsApp)
E-mail: adisjq@r.postjobfree.com
Project Management ~ Construction Operation
Total Experience: - 28 years rich experience in delivering optimal results & business value in high-growth environments
Hydro Electric & Pump Storage Power Project- 16 years
Transportation (Railway Tunnel/NH1A Road Tunnel Project) – 04Years
Metro Rail – 04years
Others (Cavern, Hilly Road, Culverts, Major Biridges etc)-04 years
Along with 5 year in abroad experience (BHUTAN & NEPAL)
Core strengths in project execution of Hydro Electric Project (Civil construction of Power House and Tunneling such as HRT, TRT, Surge Shaft, Pressure Shaft, Pen Stock, Draft Tube ETC), Earthen Dam, Road and Railway tunnel with NATM Technique as well as Pile foundation, Cut & cover, Bridge works & Jet grouting without incidences of time/cost overruns. Key competencies in present construction methodologies and in managing materials & manpower resources to register maximum productive output. Proficiency in management of all types’ construction projects with project cost review, budgeting. Proficiency in liaising with contracting principles to ensure compliance with contract specification and resolution of problems and issues. Acknowledged team leader, trainer, and motivator with fine-tuned analytical and troubleshooting skills. A troubleshooter able to turn around troubled projects to meet challenging goals and objectives. Excellent man-management, time management, and leadership skills; Computer literate.
Expertise in:
Project Management ~ Site Management ~ Quality Assurance ~ Procurement Planning ~ Construction Management ~ Planning/Scheduling ~ Resource Mobilization ~ Technical Support/MIS ~ Drawings/Documentation ~ Crisis Management ~ Analytical Skills
PROFESSIONAL ACHIEVEMENTS
Gained invaluable experience of monitoring construction of various Road Tunnel/Shaft/Earthen Dam/Barrage/Hydropower & Railway Tunnel with NATM techniques adopting conventional methods, viz. Five Hydropower, one Railway, one road tunnel and Small Bridge works, Jet Grouting Etc
Education Qualification: -
Diploma in Mining and Surveying Engineering from Mining Institute, Dhanbad – 1993
Degree in Civil Engineering from Sun Rise University, Alwar - 2015
The Institute of Engineers (India) membership No- AM1910194
Certificate of Chartered Engineer (Civil) from The Institute of engineers (Kolkata) Professional Reg. No- AM1910194
Work Experiences: -
From: Nov 2019 to Present.
Employer: Simplex Infrastructures Ltd
Positions Held: Project In- charge
From: June 2018 to Nov 2019
Employer: Abir Infra Pvt Ltd.
Positions Held: DGM
From: August 2008 to June 2018
Employer: HCC Limited
Positions Held: Sr. Manager (Civil)
From: July 2002 to August 2008
Employer: Larsen & Toubro Limited, ECC Division
Positions Held: Senior Engineer (Civil)
From: November 1997 to July 2002
Employer: Jai Prakash Industries Ltd
Positions Held: Site Engineer
From: April 1991 to Oct 1997
Employer: Chasnala colliery (SAIL), CCL, BCCL
Positions Held: Overman
MAJOR AREAS OF RESPONSIBILITIES
Donned the responsibility of anchoring on-site construction activities to ensure completion of project within the time & cost parameters and effective resource utilization to maximize the outcome
Oversee all phases of project execution; approve engineering/design changes, troubleshoot and resolve complex technical problems, consistently meeting project deadlines and highest possible quality standards.
Schedule projects, select and procure materials; assign personnel and engage qualified Subcontractors.
Built & nurtured relations with Govt. Authorities and obtained approvals for the projects.
Drawn up project plans, schedule of activities, budget, & cost estimates, planned, procured, mobilized, and deployed resources to deliver the project within defined time and costliness.
Led & guided the team in ensuring compliance to all Safety norms to minimize/achieve ZERO accidents through appropriate fire protection system & safety equipments.
Designed & developed plan for ensuring Quality through quality auditing, quality evaluations and declaration of quality ratings etc
Supervised the accelerated construction and flawless start-up of a new site.
Guided and mentored the team for preparation of contractors/sub contractor’s bills.
Contributed significantly in establishing and implementation of short and long-range departmental goals, objectives, policies, and operating procedures.
Handled management of facilities/infrastructure to ensure cost effective workability.
Details of major projects handled are placed at Annexure-'A'
DETAILS OF MAJOR PROJECTS HANDLED
(A) Simplex Infrastructures Ltd.
In-charge of Hydro Electric Project, responsible for construction operation. Soft tunneling with drilling & Blasting Method
ASSIGHMENT
Involves in activities belong to entire Project with excellent quality & safety.
Period: Nov,2019 to till date
Role: Project Manager.
Project Profile: - Rammam HEP, Sikkim
(B)Abir Infra Pvt Ltd.
Role and Responsibility: - Exécution of civil Works at site including excavation and construction of various structures.
Value Engineering and release of the drawings at site;
Coordination with the Consultants, Clients, Suppliers and Sub-Contractors;
Quality Checking;
Planning of materials, manpower and machinery for the project;
Cost controlling and management;
Implementation of all civil works;
Quantity checking of bills;
Safety awareness etc.
Sub Contractor Billing.
ASSIGHMENT
Involves in activities belong to entire civil works with excellent quality & safety.
Period: June, 2018 to Nov 2019
Role: Project Incharge
Project Profile: - Rangpo Railway Tunnel, NF Railway, Rangpoo (Sikkim)
(C) Hindustan Construction Company Ltd.
Working with Hindustan Construction Co. Limited from Aug-2008 to June 2013 as a Manager (CIVIL) & involved in Execution of Tunnel excavation (HRT, TRT) and underground Surge shaft, Powerhouse, Crude Oil Cavern with trouble shooting, Requirement of Materials – Man power – Machinery
Project -Nimoo Bazgo HEP (45MW), Chutak 96 MW HEP (J&K), Teesta VI 510 MW HEP (Sikkim), Dhagachu HEP, Bhutan, Padur Cavern Project.
Responsible for – Execution of excavation and all civil works, requirement of materials, PRW Billing and safety awareness.
ASSIGHMENT
Involves in activities belong to entire civil works with excellent quality & safety.
Period: Aug 2008 to June 2012
Role: As a Section In charge
(D) Larsen & Toubro Ltd (ECC Division)
Working with Larsen & Toubro Limited, ECC Division from July, 2002 to Aug,2008 as a Senior Engineer (CIVIL) & involved in Execution of Tunnel excavation with trouble shooting, requirement of material and in all civil activities of HRT, Diversion Tunnel of Parbati H.E. Project-III (HP) and PURULIA PUMP STORAGE PROJECT 900 MW, Purulia (WB) as well as U/g Excavation and Civil structure in Metro Rail in DMRC(19C Package).
ASSIGHMENT
Involves in activities belong to entire civil works with excellent quality & safety.
Period: July 2002 to Aug,2008.
Role: As a Section In charge
(E) Jai Prakash Industries Ltd
ASSIGHMENT
As a Site Engineer involved in activities belong to civil works such as Tunnel excavation, Rock supports, concrete lining, utilities works & surveying section of open & U/G with Total Station.
Period: Nov 1997 to July 2002
Project: Chamera II 320 MW HEP (HP) & Teesta V 510 MW HEP (Sikkim)
(F) Chasnala colliery (SAIL), CCL, BCCL
Working with chasnala colliery in underground mines with board and pillar method, CCL, BCCL from April 1991 to Oct 1997 as an Overman
Personal Profile
NAME- Chandra Bhushan Singh
Father’s Name- Sri Ram Dayal Singh
Date of Birth- 21-08-1970
Blood Group A Positive
Sex- Male
Nationality- Indian
Marital Status- Married
Passport No- P2017866 (Valid up to: 23.11.2026)
Extra Curriculum Activities:
1)Having Conversant Computer knowledge
2)Taken Vocational Training in U/G coal- mines
3)First-aid training
4)Gas-testing training
CHANDRA BHUSHAN SINGH Date:17.12.2020
(Place:Sikkim)