Post Job Free
Sign in

Quality Control Project Manager

Location:
Flora, IL
Posted:
September 21, 2024

Contact this candidate

Resume:

John Lusk

Construction Manager

CAREER OBJECTIVE

I am seeking a Construction Project Manager position where I can use my years of experience and manage all aspects of the construction projects using these valuable attributes: High production rates, safety, quality control, scheduling, cost control, contracts, subcontractors, suppliers, proposals, estimates, documentation turnover, client relations/management, field staff as well as other duties.

PROFESSIONAL EXPERIENCE

JK Communications, Phoenix, AZ. June 2023

Vice President (OSP) Outside Plant Operations

Directly Oversee all Construction Operations

A. Wet Utility

B. Dry Utility

Managed Day to Day Activities

Played a Critical Role in Operational Efficiency & Safety Practice

Implemented Initiatives to Minimize Costs and Enhance Timelines

Wet Utility Projects:

A. Civil Municipalities

B. Commercial

Types of Projects

A. Fire

B. Water

C. Sewer

D. Storm Drain

CONTACT

Phone

602-***-****

Email

ad8wp0@r.postjobfree.com

Certifications

OSHA 30

UPRR-RAILROAD

CPR

FIRST AID

COMPETENT PERSON

RULE 310-ADEQ – DUST

CONTROL

SUBSTANCE ABUSE

H2S AWARENESS

Style of Pipe

A. Ductal Pipe

B. Rubber Lined Sewer

C. (RGRCP) Rubber Gasket Reinforced Concrete Pipe

D. 18” to 120” (CMP) Corrugated Metal Pipe

E. SDR Sewer Pipe

F. Clay Sewer Pipe

Dry Utility Work Experience

Managed all aspects of (OSP) Outside Plant Division

Ran multiple Bore crews, Trench crews, & Fiber Optic crews

Read Prints

Called in Blue Stake (811)

Scheduled and Attended Pre-Construction Meetings

Ordered Materials

Interviewed & Hired Employees

Ensured Job Safety & Quality Control (JSA)

Organized Sub-Contractors

Communicated with Customers, Inspectors, etc.

Maintained Project Schedule

Resolved any Customer/Home Owner Complaints

Estimated RFQ’s & RFP’s

Created Budgets for Awarded Projects

Turned in all Daily Reports

Responsible for Final AS-Builts

Purchased and Sold Construction Equipment

Managed crews in more than 10 states

Customers:

AT&T (FTTH & Corp. Fiber)

City of Culver City, CA (Fiber)

City of Mesa Arizona (ITS)

Centurylink (Business Fiber)

Cox Communications Fiber:

Fiber to The Home (FTTH)

Rural FTTH

Chandler School District

Peoria School District

Buckeye School District

Google (FTTH)

Race Comm. (Rural FTTH)

Salt River Project (Power)

Verizon (FTTH)

Other Job Duties

A. Scheduled & Attended Pre-Construction Meetings

B. Ordered Materials

C. Interviewed & Hired employees

D. Ensured Job Safety (JSA) & Quality Control

E. Interviewed & Hired Employees

F. Ensured Job Safety & Quality Control (JSA)

G. Organized Sub-Contractors

H. Communicated with Customers, Inspectors, etc.

I. Maintained Project Schedule

J. Resolved any Customer/Home Owner Complaints

K. Estimated RFQ’s & RFP’s

L. Created Budgets for Awarded Projects

M. Turned in all Daily Reports

N. Responsible for Final Redlines & Close Out Packets O. Purchased and Sold Construction Equipment

P. Managed crews in 10 states

AZ Valley Underground, Chandler, AZ. July, 2002-Oct.,2004

General Superintendent & Estimator

Bid Commercial & Civil Underground Projects

Managed all Field Operations OF Multiple Crews

Project Pipe Sizes:

A. 8” to 24” Ductal Iron

B. 4” to 30” SDR35 – Sewer

C. 80” to 120” (CMP) Corrugated Metal Pipe

Customers:

1. Walmart

2. Lowes

3. Home Depot

4. Various Municipalities in Phoenix Market

RELEVANT SKILLS

Manager/Supervisor

Estimator

Safety Director

Multitasker

Self-Motivator

Critical Thinker

Strong Problem Solver

Attention to Detail

STATES WORKED:

ARIZONA

CALIFORNIA

COLORADO

MONTANA

NEVADA

NEW MEXICO

NORTH DAKOTA

TENNESSEE

TEXAS

UTAH

Kleven Construction, Phoenix, AZ. Aug. 1987–July, 2002

Superintendent Wet Utility Division

Managed all aspects of Wet Utility Division

A. Bid Projects - Commercial & Civil

B. Able to Read & Understand Project Plans & Specs C. Understand all Aspects of Underground Installation D. Familiar with Local Codes and Mag Specs

E. Plan, Coordinate, & Supervise Field Operations

F. Enforced Safety Processes and Procedures

G. Managed Project Timelines, Budgets, and Resources H. Managed Risks & Issues Related to Projects

I. Identified Potential Areas of Improvement and

Implemented Resolutions

J. Monitor Project Status and Report to Stake Holders

Pipe Sizes, Projects, & Customers

A. 6” to 12” Asbestos – City of Glendale & City of Mesa B. Water Service Replacements – City of Phoenix

C. 24” Ductal Iron – City of Scottsdale

D. 24” & 36” Ameron Pipe Projects – City of Phoenix E. 24” Sewer Project – Intel Fab 12 – Chandler

RELEVAN

Arizona Pipeline, Phoenix, AZ. Dec. 1983–July 1987

Foreman for Wet Utility Projects

1. Project Sizes – 1M to 8M Dollar Projects

2. Pipe Sizes

A. 6” to 12” Asbestos Pipe

B. 6” to 24” Ductal Iron Pipe

C. 18” to 36” Ameron Pipe



Contact this candidate