Post Job Free
Sign in

Project Management Quality Control

Location:
Fort Mill, SC
Posted:
August 26, 2024

Contact this candidate

Resume:

Mary Jo Watson

Fort Mill, S.C.

ad79cs@r.postjobfree.com

704-***-****

Professional Summary:

Autonomous, self- starting leader with the ability to motivate others to excel in their environment.

Core Strengths:

Master Scheduler

Safety and Facilities Management

Project Management

Procedure Development

Document Control

Team-Oriented Encouragement

Supplier and Vendor Management

Quality Control Analysis

Organization Skills

Attention to Detail

Proficiencies Include:

Software: Microsoft Word, Excel, Access, PowerPoint, Sharepoint, Clearquest, DOORS, AutoCAD

Database Applications: Syteline, SYMIX, AS400, QuickBooks, Maximo and Maintenance Logistic Systems

Key Accomplishments:

Inventory Control and Vendor Relationship Building to ensure manufacturing excellence

Created a maintenance database from the ground up

Created a comprehensive Preventative Maintenance program

Developed a blueprint library and master control of all prints and process information

Translated prints and machine documentation from German to English

Corrected and maintained a database on all machine, facility and mold information

ISO9002 and TS16949 Process Development using Lean Manufacturing Principles

ISO1400 Procedure Development to ensure regulation compliance

Walmart SuperCenter Tega Cay SC April 2023-Present

Cashier

Stay at Home Grandmother February 2021- February 2023

During Covid- Watched Grandchildren

Walmart SuperCenter Tega Cay SC May 2017- February 2021

Customer Service Manager

Mojo’s Cleaning Service February 2014-December 2018

Self Owned Cleaning Service

Diversant LLC (contracted to TIAA-CREF) June 2014 – December 2014

Data Analysis / Maximo Team Associate

Assisted in a Maximo Upgrade of Reporting and Costing Functions

Established a Sharepoint Document Management of Deliverable Artifacts

Analysis of Departmental Information and Requirements, in multiple formats, to increase the accuracy of the upgrade

Insight Global (contracted to Lockheed Martin) August 2012 – December 2013

Documentation Technician/ Maximo Team Associate

Configuration Management of all Documents related to Projects.

Sharepoint and DOORS Document Management of Deliverable Artifacts.

Analysis of Customer Information and Requirements to identify points of Development

Working in the Software Development Team for implementing the designs and sustainment of the Maximo Asset Management Database

Reviewing engineering, construction and equipment drawings and documents in electronic format that spans over a 40 year period

Extracting pertinent information into a predetermined excel format; performing quality reviews before uploading into a Project Wise database

Performing a variety of administrative and technical duties as assigned by site manager; setting up and maintaining subject files and train peers on accurate attribution of material

Otto Environmental Systems North America, Inc. August 2008 - June 2011

Maintenance Planner / Scheduler

Responsibilities:

Planning preventative maintenance on 15 Injection Molding machines; 42 Injection Molds; 20 Hot Stamp Machines.

Inventory management of the spare parts that are needed for the machines “Tool Crib”.

Establishing a critical spare part inventory to reduce downtime for efficiency of production.

Working with the OEM on parts and upgrades needed.

Document Control and making sure all prints are current and complete for all the Molds, Machines and Facility.

Issuing work orders and planning corrective maintenance from these to identify breakdowns before interfering with production.

Reporting operating and repair cost for Machines, Molds, Facilities and MRO items, to the Director of Operations and Cost Accountant on a weekly, monthly & quarterly basis.

Getting all records and systems in place for maintenance to enable the TS16949 Certification.

Aksys, Inc December 2005 - January 2007

Design Engineer

Reported directly to Engineering Manager of this bitumen manufacturer.

Responsibilities:

Designed tools for efficiency of production.

Handled document control for all customer specific designs.

Worked closely with Quality Assurance and Process Engineer to identify problems and assist in trouble shooting materials.

Assisted customers on-site to assist customers in definition and problem identification.

Defined Shrinkage Variables for material production.

Updated International SARA database on chemical content.

Defined procedures for product verification and released into production.

Rexroth Star May 2000 - May 2001

Production Control

Responsibilities:

Verified international stock and related materials shipments

Released orders to production per design specifications

Oversaw inventory control and established a Returns Process

Scheduled, per inspection, maintenance on CNC Machines as needed

Otto Industries, Inc. February 1996 - April 2000

Plant Administrator June 1999 - April 2000

Responsibilities:

Facility contracts, safety, environmental, maintenance, purchasing, inventory control and all work instructions and procedures.

Worked with consultants in setting up the manufacturing aspects of the SYMIX accounting and production database.

Trained all related personnel on SYMIX Database including but not limited to: correct entry of manufactured goods, setting up the correct BOM and setting up the format of reports to give correct information in a usable format.

Master Scheduler August 1997 - June 1999

Responsibilities:

Scheduled production, customer orders, pre-maintenance on machines, molds and related equipment in three manufacturing facilities.

Instituted procedures to utilize production and downtime accountability

Developed order release and tracking procedures for production.

Manufacturing Assistant May 1996 - August 1997

Responsibilities:

Accountable for maintenance and facility contracts, scheduling of work orders for maintenance to building, machines and molds. Insure Safety and Environmental compliances and procedures.

Assistant to Manufacturing Engineering Manager February 1996 - May 1996

Responsibilities:

Scanned all blue prints of mold and machines into Auto-CAD.

Developed database for instant access to all prints for maintenance and process technicians.

Education:

York Technical College September 1994 – August 1997

Associate Degree

Engineering Graphic Technology

Project Management



Contact this candidate