Post Job Free
Sign in

Project Manager Management

Location:
Basra, Iraq
Posted:
July 01, 2024

Contact this candidate

Resume:

Wessam S. Almaliky

Project manager

Phone: +964**********

Email: ad6vs4@r.postjobfree.com

B.SC. in Electrical Engineering / Basra University / Collage of Engineering / Iraq.

CAREER OBJECTIVE:

Electrical project management, supervision and engineering (more than 14 years’ experience) on multi-national,multi-discipline projects through detail design,construction,commissioning,handover and close-out.I am seeking a challenging position in which these skills can be utilized and enhanced for the betterment of the company.

KEY QULIFICATIONS:

Effective delivery of projects safely and within schedule, cost, and quality standards.

Development the project Scope of Work and execution definition.

Proven team player working with a multi-discipline team to deliver projects.

Versatile and adept at managing change,self-starter,able to meet milestones and assimilate new programs.

Manage project stewardship, analysis and reporting.

Consistent commitment to business ethics and control compliance.

Interface management and issues mitigation of HSE, commercial, financial, quality, integrity and schedule constraints.

TECHNICAL COMPETENCY:

Projects Development, Management, Execution and Technical Analysis of onshore contracts in a Green and Brownfield environment. Highly adept in multi-site management.

Execution Management of major Oil & Gas multi-discipline EPC Contractors with Strong commitment to safety.

Installation and commissioning of electrical systems and equipment.

Relevant experience in civil construction, steel structure work and modularize facilities.

Demonstrate strong organization and time management, budget and cost control.

Engagement and interface management of customer/stakeholder expectations.

Advance competence in Microsoft office including EXCEL and PowerPoint.

Advanced user of Aconex with excellent knowledge of on-line document control systems.

EMPLOYMENT SUMMARY:

More than 14 years in multi-discipline project management and execution with لBasra Oil Company and other international companies.

Coordinating major electrical projects technical evaluation and cost estimate (Major Tie-Ins project, Produce water project, Industrial water project, Power distribution project, etc.).

Onshore project manager,electrical engineer,construction supervisor,quality supervisor, site manager.

DETAILED WORK SUMMARY:

Oct. 2018 until now: South Oil Company WQ1 field/ major projects dep. Basra /Iraq (operated by EXXONMOBIL): multi-discipline project manager, Electrical lead

Manage and execution projects from the FEED stage until start up and follow electrical work for other discipline projects:

Industrial water project, Free water knocks out drum project, power projects (solar turbine),power distribution project, produce water …

Mar. 2018 to July: Wood Group PSN Company (Basra Gas Engineering & procurement services Project) Basra / Iraq. Electrical design engineer

Complete engineering including electrical data requisition sheet (EDRS) drawings, necessary vendor documentation and engineering work-pack for procurement and perform the detailed Site Survey of all Basra Gas Company.

NGL Rehabilitation project: As a part of Rehabilitation (Electrical) about 222 numbers of LV and 39 numbers MV Explosion Proof Motors including with Local Control Station/Remote Control Unit for the respective motors, DC UPS system & Battery bank and AC/DC UPS for the locations (Substation-1,2,3, Existing Central Control Building (ECCB) & Field Auxiliary Room (FAR)) that would be replaced for various locations in KAZ NGL plant.

Nov. 2010 to Dec.2017: South Oil Company WQ1 field/ major projects dep. Basra /Iraq (operated by EXXONMOBIL): Power and water project engineer, Electrical lead

Manage and execution some electrical projects from the design stage until start up and follow electrical work for other discipline projects:

1.EII (Electrical infrastructure installation) project installing 11KV SWG AND 0.4/6.6 LERS in the degassing station 6, 7, 8.

2.11 KV switchgear modular projects - design manufacture and installation of 3 set of 11KV switchgear building to the degassing stations.

3.Potable Water Treatment and Storage Facilities, three sets each unit designed to produce 240,000 liters / 240 m3 d) and Produced water project.

May 2007 to Aug. 2010: BRU (Basra reconstruction unit), BASRA / IRAQ. Power and water Project engineer

Manage (construction, commissioning and start-up) Basra province Government contract projects including: Electrical power distribution, Electrical substations and transmissions lines, Heavy sewage and rainwater stations and network.

Nov. 2005 April 2007: Shams AL-Sabah Co. (SAS) installation of high voltage 6.6 KV substations and transmissions line (Siemens Application Project in Iraq) in North Rumayla oil field, BASRA / Iraq Electrical engineer, Site Manager

Revamp of six electrical 132/6.6 KV substation including demolition, heavy lifts, lighting, control and fire systems, overhead distribution lines and bus bar (ACSR), civil works, installation high voltage equipment, 132/6.6 KV power transformer, switch gear, control building, and distribution Install high voltage equipment (current transformer, voltage transformer, circuit breaker, disconnector, transformers Earthing system).

Certifications:

Project coordinator, Solving common project problems, Project management simplified, Teamwork foundation, time management fundamental, Better business writing, Note-Taking for business professional, Gantt charts, Leading productive meeting, Enhancing your productivity, Communication foundation, Business development strategic planning.

SKILLS

Project coordination, Project management, Project delivery, Technical analysis, Construction management, Time management, Interface management, Communication, Leading productive meeting, Productivity improvement, Business writing, Teamwork, Team leadership and management, Business development.



Contact this candidate