Post Job Free
Sign in

Telecommunication, Planning & Design, Technical Support

Location:
Cabantian, Davao del Sur, Philippines
Posted:
June 23, 2024

Contact this candidate

Resume:

MELQUIADITO J. FALLER

(Telecommunication Professional)

B21-L46, Kofu St., Bambu Estate North, Mobile Number: +63-919-*******

Sto. Niño, Davao City, Philippines Email Address: ad6oix@r.postjobfree.com

QUALIFICATION SUMMARY

More than twenty years of working knowledge and experience in the telecommunications industry wherein nineteen years of it are devoted to wireless communication in which the last sixteen years are in GSM and progressively in UMTS, LTE and 5G technologies.

Knowledge and experience in Nortel Node B, Alcatel-Lucent Multi-standard Base Station (MBS), NSN and Siemens Base Station Sub-system (SBS), Siemens CTR190/CTR210 Hot-standby Digital Microwave Radio System and Motorola D900 Mobile Communication System.

Highly experienced in project technical support (TAC) and Operation and Maintenance of Siemens Base Station Sub-system and in optimizing network coverage and quality of service.

Highly experienced in the implementation of Siemens Base Station Sub-system such as installation supervision, commissioning, integration, acceptance and upgrade of BSC, TRAU and BTS.

Highly experienced in the Operation and Maintenance of Motorola D900 Mobile Communication System and of Siemens CTR190/CTR210 Hot-standby Digital Microwave Radio System.

Knowledge and experience in tools and test equipment for measurement, testing and troubleshooting Siemens Base Station Sub-system and Motorola D900 Mobile Communication System.

Knowledge and experience in Alcatel-Lucent low/medium capacity Digital Microwave Radio System (9400AWY and 9500MXC), Siemens low capacity Digital Microwave Radio System (SRA-L XD), Siemens SDH Digital Microwave Radio System (SRA 4), Siemens Surpass HiT7070 and Siemens TransXpress SMA1K Digital Multiplexers, Eltek Rectifiers and Power-One Power Supply System.

Knowledge and experience in planning, design and implementation of TETRA, WLL, PTP and PTMP wireless communication system, as well as of MW transport backbone.

Knowledge in the evolution and realization of the 3rd Generation (3G) Mobile Communication System (IMT-2000), like in UMTS from GSM/HSCSD/GPRS/EDGE, as well as of the 4th Generation (4G) Mobile Communication System (IMT-Advanced), like in LTE from UMTS/HSPA/HSPA+, and ultimately into the 5th Generation (5G) Mobile Communication System.

EDUCATIONAL ATTAINMENT / PROFESSIONAL ELIGIBILITY

Degree: Bachelor of Science in Electronics and Communications Engineering (BSECE)

Cebu Institute of Technology - University (CIT-U)

Cebu City, Philippines

School Year 1985 - 1990

License: (Philippine) Professional Regulation Commission (PRC)

Professional License # 0009275

Registered on May 2, 1994

Ranked 6th place nationwide - PRC Board of ECE Licensure Examination (November 6&7, 1992)

WORK EXPERIENCE

Nokia Solutions And Networks Al-Saudia Ltd. (Nokia Al-Saudia)

Riyadh, Kingdom Of Saudi Arabia

< Second/Third Line Technical Support > October 2011 to June 2022

Network operations, preventive and corrective maintenance, implementation and upgrade of Siemens and NSN Base Station Sub-system (BSS).

Project Deployment:

SAR GSM-R Project

October 2019 to June 2022

Project Engineer (RAN Expert - Level 3 Technical Support)

Provided level three (L3) technical support for the upkeep of Saudi Arabia Railways (SAR) GSM-R network.

Coordinated with SAR level two (L2) team on escalated and emergency network troubles and issues.

Scrutinized real-time network glitch and performance through Radio Commander (RC) monitoring.

Performed Radio Commander (RC) application operation and administration.

Established ad hoc O-Link setup between Radio Commander (RC) and eBSC through IP configuration of GSMR Cisco Switch within the prescribed SAR IT network’s VLAN.

Regularly configured IP setup of LMT when locally accessing any BSS/RAN network elements.

Performed routine O-Link connectivity health-check between Radio Commander (RC) and eBSC in order to ensure continuous and uninterrupted O&M data information flow and capture.

Configured RDP for Radio Commander (RC) remote login procedure.

Executed XFTP and PSFTP procedure to extract data files from the remotely configured Radio Commander (RC).

Used PuTTY terminal emulator in administering Radio Commander (RC) processes, checking its system configuration status, monitoring its log information, etc. through its internal component, the Sun Management Center (SMC).

Analyzed uploaded network logs for trouble root cause determination and for trouble resurgence prevention.

Performed fault analysis through alarm indicators and history patterns, NE system performance, and systematic NE HW/SW manipulation and management.

Carried out and recommended troubleshooting procedures for immediate HW fault resolution and timely recovery of network operation.

Extended diagnostic and troubleshooting support to SAR level two (L2) team for fault clearance.

Supported multi-system/multi-vendor coordination and interworking procedure for network interconnectivity trouble resolution.

Extended drive-test and roaming procedure support to Network Optimization team along with the analysis of the data captured in order to effect network trouble resolution in accordance with the customers’ complaints.

Regularly prepared and submitted TIR and RCA on high impact network service troubles.

Facilitated support on MDT request, approval and execution when needed.

Performed site visit for on-site diagnosis and troubleshooting whenever necessary.

Provided sessions and inhouse training to SAR level two (L2) team for knowledge transfer.

Supportively attended regular meetings on network operation status and performance.

Worked on RG20.0 BSS operating SW.

STC Al Jawal MS Project

October 2011 to June 2016

Technical Support / SLM Engineer

Facilitated the Managed Services’ second line O&M for Saudi Telecom Company (STC) Al Jawal network.

Performed weekly, monthly, quarterly, half-yearly and yearly PMR and health-check for cBSC/eBSC/FlexiBSC.

Managed PMR system scheduling and data upload using WFMS SW tool.

Executed CMR for cBSC/eBSC/FlexiBSC and cTRAU/eTRAU where and when needed within SLA.

Attended network trouble tickets generated by MNOC/GNNCC.

Managed referred and assigned trouble tickets using RTTS SW tool.

Performed fault analysis through alarm indicators and history patterns, NE system performance and network KPI’s, and systematic NE HW/SW manipulation and management.

Initiated multi-vendor coordination and interworking procedure for network interconnectivity trouble resolution.

Executed diagnostic and troubleshooting procedure for fault clearance.

Prepared TIR on high impact network service troubles.

Managed and facilitated MDT/EMDT/TCN request, approval and execution when needed.

Coordinated with and provided support to MNOC Front/Back Office, Performance Management, and Network Optimization teams for trouble ticket fault analysis and resolution, and with Configuration Management and Radio Access Care teams for new network implementation and upgrade.

Supported the Network Optimization team in performing drive-test and roaming procedures along with the analysis of the data captured in order to facilitate remedial action to network service issues based on customers’ complaints.

Extended diagnostic and troubleshooting support to ADM/DXX/FOC transmission facility, MSC/SGSN core, and RC/OSS NOC teams.

Interfaced and interworked with other vendors, such as Alcatel-Lucent, Ericsson, Tellabs, Huawei, Cisco, etc., on administrative and technical planning and execution of equipment interconnectivity and interoperability.

Carried out necessary NE HW expansion and reconfiguration prior to commencement of network upgrade.

Performed network upgrade from RG10 MP3.0 to RG20 MP1.0 operating SW.

Facilitated execution of BSC migration procedure from one MSC/SGSN core network to another.

Managed BSC decommissioning and dismantling activities.

Implemented BTS re-homing/re-balancing and BSC loading/offloading procedures.

Extended BTS swap support and coordination to other vendors.

Performed pinging and trace-routing procedures for BSC GBOIP/NSVCIP connectivity to SGSN.

Facilitated NMS NetViewer visibility on isolated NSN MW system through NUC creation in the BSC.

Extended support for Gemini project.

Managed cBSC/eBSC/FlexiBSC and cTRAU/eTRAU HW spare pool for SLM Core Kit.

Provided management and technical support to FLM engineers on high profile BTS activities and troubles.

Periodically prepared and submitted administrative and technical reports to both NSN and STC managements.

Extended support to NSN managers when needed in dealing with STC management on some administrative and technical issues.

Worked respectively on RG10.0 and RG20.0 BSS operating SW.

Fault Administrator (Delegated)

Managed as well as facilitated coordination and direction up to the final resolution of both SLM and FLM trouble tickets.

Constantly monitored and regularly reported to managers in hierarchy the status of all MNOC generated trouble tickets.

Managed SLM Core Site Kit and FLM Car Kit HW spares and incorporated smooth and systematic spare flow.

Facilitated HW replacement and HW replenishment requests to HWS through FR documentation along with the required RMA serial numbering scheme for efficient HW tracking.

Instituted and implemented an orderly HW spare inventory procedure for regular reporting and submission to HWS.

District Operations Manager (Delegated)

Ensured continuous network operation through strategic and efficient team action in attending network troubles.

Safeguarded network trouble resolution commitment by maintaining and even minimizing the required system MTTR that is well within the contracted SLA.

Managed all trouble ticket escalations and effected immediate and sensible resolution.

Periodically coordinated and reported to higher NSN and STC management the status of the network’s operation.

Enabled and directed all team members to a well-managed and well-executed workflow and established a desirable working environment and an excellent teamwork among team members that are instrumental in achieving the projected work outcome for the continuity of the network operation with a high QOS.

Freelance Consultancy

Saudi Networkers Services Ltd. Co.

Riyadh, Kingdom Of Saudi Arabia

< Telecom Consultant > September 2010 to July 2011

Network operations, preventive and corrective maintenance, implementation and upgrade of Siemens Base Station Sub-system (BSS).

Project Deployment:

Nokia Siemens Networks - K.S.A.

STC (Al Jawal) GSM MS Project

September 2010 to July 2011

Siemens SLM Access Engineer

Facilitated the operation and maintenance of Saudi Telecom Company (STC) Al Jawal GSM network.

Performed weekly, monthly and yearly PMR and health-check for BSC.

Managed PMR system scheduling and data upload using WFMS SW tool.

Executed CMR for BSC and cTRAU/eTRAU where and when needed within SLA.

Attended network trouble tickets generated by MNOC/GNNCC.

Managed referred and assigned trouble tickets using RTTS SW tool.

Performed diagnostic and troubleshooting procedure for fault clearance.

Prepared TIR on network service’s high impact troubles.

Managed and facilitated MDT request, approval and execution when needed.

Coordinated with and provided support to MNOC Front/Back Office, Performance Management and Network Optimization for trouble ticket fault analysis and resolution, and with Configuration Management and Radio Access Care for new network implementation and upgrade.

Supported the Network Optimization team in performing drive-test and roaming procedures along with the analysis of the data captured in order to facilitate remedial action to network service issues based on customers’ complaints.

Carried out necessary NE HW expansion and reconfiguration prior to commencement of network upgrade.

Performed network upgrade from BR9.0/2108 to RG10 MP3.0 operating SW.

Executed Omal/Olink trace capture through BSC IPLI using Netgear Smart Switch and Wireshark Network Packet Analyzer.

Facilitated NMS NetViewer visibility on isolated Siemens MW system through NUC creation in the BSC.

Performed NE audit for BSC and cTRAU/eTRAU.

Managed BSC and cTRAU/eTRAU HW spare pool for SLM (Core Site Kit) and BTS/MW HW spare pool for FLM (Car Kit).

Managed BTS site audit reports and BTS site PMR reports done by FLM engineers.

Provided management and technical support to FLM engineers on high profile BTS activities and troubles.

Extended implementation support through commissioning and integration, and operation and maintenance of special coverage COW sites.

Facilitated technical & administrative support to especial government GSM-R project.

Periodically prepared and submitted technical and administrative reports to both NSN and STC managements.

Extended support to NSN managers when needed in dealing with STC management on some administrative and technical issues.

Worked respectively on BR9.0 and RG10.0 BSS operating SW.

Freelance Consultancy

Penta Consulting Limited

Surrey, United Kingdom

< Telecom Consultant > November 2004 to July 2009

Project implementation and technical support for Siemens Base Station Sub-system (SBS), and optimization of network coverage and quality of service. Project implementation of Alcatel-Lucent Multi-standard Base Station Sub-system (MBS) and Nortel Node B.

Project Deployment:

Alcatel-Lucent - Qatar

Vodafone GSM Project

April 2009 to July 2009

Telecom Engineer

Executed the BSS implementation of Vodafone’s phase1 roll-out.

Supervised the TI installation including telecom, civil works and power system of rooftop, greenfield, RDU and COW sites for both BTS (Evolium A9100 MBS) and Node B (9311 Macro ID2, UMTS BTS 12020, UMTS dBTS 2U & 9341 RRH) indoor and outdoor solutions.

Prepared documentation and BOQ of completed sites.

Performed site clean-up and rectification in preparation for site acceptance.

Executed site acceptance procedure for PAC and FAC.

Conducted site audit of RDU and COW sites.

Executed sweep-test procedures and troubleshooting for BTS antenna system VSWR consistency using Anritsu Site Master.

Conducted site survey for SHR and preliminary TSSR, and for eventual site acquisition and final TSSR.

Performed commissioning and integration procedure of Evolium A9100 MBS (MBI-3, MBI-5, MBO1E & MBO2E).

Extended assistance to Civil Works and Power teams in carrying out tasks for the completion of the site and be on RFI status.

Nokia Siemens Networks - Azerbaijan

Bakcell GSM Project

April 2008 to June 2008

Siemens BSS Implementation Engineer

Executed the BSS implementation of Bakcell’s phase2 roll-out.

Supervised site installation including telecom, civil works and power system; and prepared the BOQ of the different BSS network elements such as BSC’s, TRAU’s and BTS’s.

Performed commissioning and integration procedure for high capacity step2 BSC’s, high capacity TRAU’s and BS240XLII, BS240II and BS82II BTSE’s.

Performed clean-up of phase1 sites in preparation for site acceptance.

Executed preliminary and final site acceptance procedure with the customer respectively for PAC and FAC.

Performed HW inventory procedure through upload and download of IDF.

Performed BTS functional and HMO back up procedure.

Performed HW reconfiguration for TRX addition and in accordance to customer’s standard.

Executed sweep-test procedures and troubleshooting for BTS antenna system VSWR consistency using Anritsu Site Master.

Performed diagnostic and troubleshooting procedure for deficiency and fault clearance.

Extended technical support to colleagues and to customer.

Worked on BR9.0 BSS operating SW.

Nokia Siemens Networks - Pakistan

Telenor GSM Project

February 2007 to December 2007

Siemens BSS Implementation TAC-2 Engineer

Commissioned as second level implementation TAC engineer.

Performed high level BSS (BSC/TRAU/BTS) analytical, diagnostic and troubleshooting tasks.

Extended network optimization support to RNP group through DT and roaming procedures, DT result analysis (HO, signal strength & quality, etc.), KPI acquisition (network performance data like traffic and control channel allocation success rates, etc.), DB parameter scrutiny (values and settings) and HW troubleshooting (antenna system mechanical/electrical tilting and height, sectorization and equipment performance).

Executed the BSS implementation of Telenor’s phase3++ and phase4 network expansion roll-out and supervised the TI installation including telecom, civil works and power system.

Performed commissioning of high capacity step2 BSC’s and high capacity TRAU’s.

Prepared BSC commissioning database, integration database and test call database.

Performed MW (SDH/PDH), Leased Media and FOC link verification and DDF cross-connection for high capacity step2 BSC and high capacity TRAU integration.

Carried out the integration of TRAU’s into respective BSC’s.

Carried out the integration of BSC’s into respective MSC’s for CS voice call and data functionalities, HSCSD and other core related functionalities and management; into respective SGSN’s for PS data or GPRS/EGPRS functionalities; and into RC for O&M and BSS network monitoring.

Carried out RF (BSS) and A-interface (MSC) TS test call procedure prior to commercial launching and operation.

Performed Abis and Asub traces using Tektronix K1297 protocol tester.

Facilitated the re-homing of BTS sites from one BSC to another.

Performed BSS upgrade procedure from BR7.0/45B to BR8.0/03 and eventually to a variety of subsequent BR8.0 operating SW.

Extended technical support to colleagues and to customer.

Extended management support to local BSS implementation area managers.

Conducted special instructions to local colleagues on SBS and telecommunication basics and on project technicalities.

Acquired knowledge on eBSC and eTRAU when first introduced at later part of the project.

Worked on BR8.0 BSS operating SW, and partly on BR9.0.

Siemens - Pakistan

Telenor GSM Project

December 2005 to February 2007

BSS Implementation Engineer

Executed the BSS implementation of Telenor’s phase2, phase3 and phase3+ network expansion roll-out and supervised the TI installation including telecom, civil works and power system.

Performed commissioning and integration of high capacity step2 BSC’s, high capacity TRAU’s and BS240XLII and BS82II BTSE’s.

Performed unit acceptance procedure for BS240XLII and BS82II BTSE sites.

Performed MW link verification and DDF cross-connection prior to NE integration.

Performed HW inventory procedure through upload and download of IDF.

Performed BTS functional and HMO back up procedure.

Performed diagnostic and troubleshooting procedure for deficiency and fault clearance.

Extended technical support to colleagues and to customer.

Extended drive-test and roaming activity support to RNP optimization group.

Extended management support to local BSS implementation area managers.

Conducted a classroom and hands-on training and special instructions to local colleagues on SBS and telecommunication basics and on project technicalities.

Provided on the job training assistance to Siemens-employed expatriate.

Worked on BR7.0 BSS operating SW, and partly on BR8.0.

Siemens - Pakistan

Telenor GSM Project

November 2004 to March 2005

BSS Implementation Engineer

Executed the BSS implementation of Telenor’s phase1 roll-out.

Supervised the TI installation including telecom, civil works and power system of the different BSS network element sites such as the BSC’s, the TRAU’s and the BTS’s.

Performed commissioning and integration of high capacity step2 BSC’s, high capacity TRAU’s and BS240XLII BTSE’s.

Performed unit acceptance procedure for BS240XLII BTSE sites.

Performed MW link verification and DDF cross-connection prior to NE integration.

Performed HW inventory procedure through upload and download of IDF.

Performed BTS functional and HMO back up procedure.

Performed test call procedure.

Performed diagnostic and troubleshooting procedure for deficiency and fault clearance.

Extended technical support to colleagues and to customer.

Conducted special instructions to local colleagues on project technicalities.

Facilitated network first call and commercial launching.

Supported the RNP team in performing drive-test and roaming procedures.

Worked on BR7.0 BSS operating SW.

Etsi Technologies, Inc.

(A Siemens AG Joint Venture Co.)

Metro Manila, Philippines

< Senior Telecom Engineer > March 2001 to September 2004

Project implementation and technical support for Siemens Base Station Sub-system (SBS). Perform installation supervision, commissioning, integration, acceptance, upgrade, troubleshooting, and operation and maintenance of different BSS network elements such as BSC, TRAU, and BTS.

Project Deployment:

Siemens - Algeria

Orascom (Djezzy) GSM Project

June 2004 to August 2004

BSS TAC-2 Engineer

Facilitated the project BSS TAC-2 support.

Carried out the BSS system upgrade of Djezzy’s network from BR5.5/32 to BR7.0/06A operating SW.

Performed BSC FW, SW and HW upgrade procedure.

Executed test cases and system acceptance of BR7.0 BSS features and functionalities.

Extended BSS implementation and technical support to colleagues and to customer.

Performed commissioning, integration and acceptance of standard and high capacity step1 BSC’s, high capacity TRAU’s and various BTSE’s such as BS240XLII, BS240XL, BS240II, BS240, BS240XS and BS82.

Executed site/network expansion, TRX reconfiguration and upgrade from single band to dual band.

Performed HW inventory procedure through upload and download of IDF.

Performed diagnostic and troubleshooting procedure for deficiency and fault clearance.

Worked respectively on BR5.5 and BR7.0 BSS operating SW.

Siemens - Kuwait

NMTC (Wataniya) GSM Project

September 2003 to March 2004

BSS Implementation Engineer

Executed the BSS implementation of Wataniya’s 850K phase5 network expansion roll-out and supervised the TI installation including telecom, civil works and power system.

Performed commissioning, integration and acceptance of standard and high capacity TRAU’s and various BTSE’s such as BS240XLII, BS240XL, BS240II, BS240, BS82 and BS60.

Carried out off-air Transmitter/Combiner power output and Receiver/Multicoupler gain measurement tests using MA10 Abis Simulator and HP Spectrum Analyzer.

Performed database consistency verification with the actual BTS HW configuration.

Performed MW link verification and DDF cross-connection prior to NE integration.

Supervised HW installation during BTS swap, BTS reconfiguration and BTS upgrade from single band to dual band.

Facilitated the re-homing of BTS sites from one BSC to another.

Implemented HW/TRX addition and reconfiguration for capacity expansion.

Performed HW inventory procedure through upload and download of IDF.

Performed BTS functional and HMO back up procedure.

Performed RF TS check and intra-cell/inter-cell call HO test procedure using Ericsson TEMS.

Supported the network planning team in performing drive-test and roaming procedures.

Performed diagnostic and troubleshooting procedure for deficiency and fault clearance.

Extended technical support to colleagues and to customer.

Carried out BSC HW upgrade in preparation for the eventual system migration from BR5.5 to BR6.0.

Worked respectively on BR5.5 and BR6.0 BSS operating SW.

Siemens - Kuwait

NMTC (Wataniya) GSM Project

May 2002 to November 2002

BSS Implementation Engineer

Facilitated the BSS implementation of Wataniya’s phase3 and phase4 network expansion roll-out and supervised the TI installation including telecom, civil works and power system.

Performed commissioning, integration and acceptance of standard TRAU’s and various BTSE’s such as BS240, BS82 and BS60.

Carried out off-air Transmitter/Combiner power output and Receiver/Multicoupler gain measurement tests using MA10 Abis Simulator and HP Spectrum Analyzer.

Performed MW link verification and DDF cross-connection prior to NE integration.

Supervised HW installation during BTS swap, BTS reconfiguration and BTS upgrade from single band to dual band.

Facilitated the re-homing of BTS sites from one BSC to another.

Implemented HW/TRX addition and reconfiguration for capacity expansion.

Performed HW inventory procedure through upload and download of IDF.

Performed BTS functional and HMO back up procedure.

Performed RF TS check and intra-cell/inter-cell call HO test procedure using Ericsson TEMS.

Supported the network planning team in performing drive-test and roaming procedures.

Performed diagnostic and troubleshooting procedure for deficiency and fault clearance.

Extended technical support to colleagues and to customer.

Worked on BR5.5 BSS operating SW.

Siemens - Yemen

Sabafon GSM Project

July 2001 to October 2001

BSS TAC-1 Engineer

Facilitated the operation and maintenance of Sabafon’s newly launched GSM network.

Extended customer technical support (TAC-1).

Performed commissioning, integration and acceptance of BS240 BTSE sites.

Performed periodical test calls for network monitoring.

Provided assistance to MW group in enabling SRA-L tributaries to be used for BTS integration.

Worked respectively on BR5.0 and BR5.5 BSS operating SW.

Saudi Oger Limited

(Royal Palace Overlay Network)

Riyadh, Kingdom of Saudi Arabia

< GSM RSS Technician > February 1999 to November 2000

Operation and maintenance of Motorola D900 Mobile Communication System (GSM) and Siemens CTR190/CTR210 Hot-standby Digital MW Radio System for the Royal Palace Overlay Network. Performed both on site and remote (OMC-R) alarm monitoring and handling and equipment management. Executed diagnostic and troubleshooting procedure, as well as routine equipment checkup and periodical test measurements and calibration for preventive maintenance. Carried out occasional installation, commissioning and decommissioning of both satellite-linked mobile and transportable BSS.

Liberty Broadcasting Network, Inc.

(Liberty Telecoms)

Metro Manila, Philippines

< Network Planning Engineer > July 1996 to February 1999

Strategic planning and design of Liberty Telecoms’ nationwide wireless communication network including MW transport backbone and network for TETRA, WLL, PTP and PTMP radio access services. Performed pathprofiling procedure and analysis, link budget planning and design, frequency planning and channel loading, coverage optimization, HW configuration, billing of materials and installation supervision. Carried out topographic map analysis for eventual site survey and site acquisition, as well as network interconnection study with other telecommunication service providers. Extended technical support to marketing group on service coverage for subscribers and facilitated coordination with service maintenance group for subscribers’ technical complaints.

Tec-Optics Corporation

(Tel-Tec Engineering Co.)

Metro Manila, Philippines

< Engineering Assistant > March 1996 to May 1996

Outside plant design engineering of various LEC operators. Performed demand forecasting and secondary cable detailed design with acquired capability in cabinet sizing, in fundamental cable and conduit planning, and in primary cable and conduit detailed design.

Philippine Cable Network

& Construction, Inc.

Metro Manila, Philippines

< Engineering Assistant > May 1995 to March 1996

Outside plant design engineering of various LEC operators. Performed demand forecasting and secondary cable detailed design with acquired capability in cabinet sizing, in fundamental cable and conduit planning, and in primary cable and conduit detailed design.

Vis-Min Infosearch Services

Cebu City, Philippines

< Field Researcher > April 1991 to September 1991

Market research. Conducted store surveys and product sale inventories.

TECHNICAL & MANAGEMENT TRAINING

Intelligent Robots: An Introduction - June 3, 2022 - Davao City, Philippines

Project Management: The Fundamental

Approach - June 3, 2022 - Davao City, Philippines

WIFI6/6E and Multi-GIG Technology - June 3, 2022 - Davao City, Philippines

Nation-Building Through ICT and Digital

Transformation in the New Normal - June 2, 2022 - Davao City, Philippines

Cyber Securing Critical Infrastructure:

Spotlight on Operational Technology - June 2, 2022 - Davao City, Philippines

Emergency Telecommunications Landscape

in Building Disaster Resilience - June 2, 2022 - Davao City, Philippines

5G Workshop - Getting Ready for 5G - October 10, 2021 - Riyadh, Saudi Arabia

5G Workshop - Architecture - October 6, 2021 - Riyadh, Saudi Arabia

5G Workshop - Use Cases - September 26, 2021 - Riyadh, Saudi Arabia

5G Workshop - Overview - September 19, 2021 - Riyadh, Saudi Arabia

eUTRAN Functionalities - September 13, 2021 - Riyadh, Saudi Arabia

UMTS Fundamentals - September 8, 2021 - Riyadh, Saudi Arabia

Nokia Bell Labs End to End 5G Foundation

The 5G Imperative:

- 5G Drivers and Technology Essentials - October 5, 2020 - Riyadh, Saudi Arabia

- The Industry Journey to End-to-end 5G - October 5, 2020 - Riyadh, Saudi Arabia

Foundation of 5G Networking:

- Access - October 6, 2020 - Riyadh, Saudi Arabia

- Core - October 8, 2020 - Riyadh, Saudi Arabia

- Transport - October 11, 2020 - Riyadh, Saudi Arabia

Foundation of Distributed Cloud - October 13, 2020 - Riyadh, Saudi Arabia

Foundation of Network Slicing - October 27, 2020 - Riyadh, Saudi Arabia

Foundation of Security - November 5, 2020 - Riyadh, Saudi Arabia

Foundation of Industrial Automation - November 11, 2020 - Riyadh, Saudi Arabia

Data Privacy Compliance - November 11, 2017 - General Santos City, Philippines

On The Job Training

(SBS BR7.0 System Upgrade) - May 10 - 31, 2004 - Kuala Lumpur, Malaysia

Antenna Installation and SRA-L

Commissioning Workshop - March 25 - 31, 2003 - Metro Manila, Philippines

BSS OAM Training for OMS-B - June



Contact this candidate