RESUME
NAME: MICHAEL DOYLE (MQSA)
ADDRESS Thailand: 63 Moo 9,
T.Phalued, A.Thapla,
Uttaradit, THAILAND. 53190.
TELEPHONE/FAX: 1 Home +665*******
MOBILE PHONE: 2 Mobile no +668********
E-MAIL ADDRESS: ***********@*******.***
COUNTRY OF BIRTH: UNITED KINGDOM (AUSTRALIAN CITIZEN)
MARITAL STATUS: MARRIED
QUALIFICATIONS: THE OPEN UNIVERSITY DEGREE IN ENGINERRING
CITY & GUILDS MECHANICAL ENGINEERING
SUNDERLAND TECHNICAL COLLEGE
HNC MECHANICAL ENGINEERING
SOUTH SHIELDS TECHNICAL COLLEGE
CSWIP SENIOR WELDING INSPECTOR
MEMBER OF THE QUALITY SOCIETY OF AUSTRALASIA
AUDITOR COURSE IN QUALITY MANAGEMENT TO AS3901/ISO9000
MARCSTA SAFETY INDUCTION. CERT No 2-37765
BLUE DOG SAFETY TRAINING CERT No 289904
PERSONAL REFERENCES:
Mr Denis Jones Project Director
E-Mail ************@*******.***
Mr Reg Laing Argyle Construction Manager
E-Mail **************@*****.***
TEL Mobile: 041*******
Mr Russell Moffat Superintendent - Solomon Project
TEL Mobile: 045*******
Mr Dave Secord Electrical Supervisor /Inspector
TEL Mobile: +666********
July 19 to Present
EMPLOYER: Worley Parsons (Bishket Kyrgyzstan)
POSITION: QA/QC Manager
PROJECT: Talas Gold Processing Plant
DUTIES: Talas Gold Mine Company Representative for Quality.
Full implementation of qa/qc systems, standards and procedure (iso2000:9001)
Hse management
Quality management
Project management plans and dependent systems and procedures ( develop and implement in compliance with the requirements of the project management process and enterprise management system (ems) consistent with specific location, regulatory and contractual requirements)
Planning and implementation of design control, verification, validation and review activities.
Implementation and coordination of vendor assessment and inspection activities
Implementation and verification of construction inspection and testing activities.
May 18 to May 19
EMPLOYER: MCS Property LLC (Mongolia)
POSITION: QA/QC Superintendent
PROJECT: OT Underground Construction projects
DUTIES
Implement the QA/QC management system at site
Coordinate with quality inspections with EPCM and vendors coordinate testing on site
Coordinate with the EPCM and vendor on all E&I quality matters
Distribute relevant QA/QC documentation to inspectors
Verify that the quality related site activities are in accordance with the applicable codes and standards
Participate in the site internal and external site audits
Coordinate all the quality site inspections through the site QC inspectors
Ensure all quality control documentation is compiled and completed for as-built hand over through the QC document controller
Control all nonconformance reports and undertake remedial action
Review the customers specification and undertake relevant training to the site QC inspector
Monitor the implementation of the approved site QC Plan
Complete and coordinate the approval of the sites QC technical submittals to the customer
Coordinate with the QAQC manager on all quality issues
Elaborating inspection and test programs
Ensure the safety is adhered to at site
Assure all technical documents relative to site quality control are current status
Aug 16 to Jun17
EMPLOYER: Solar Power International LLC (Mongolia)
POSITION: QUALITY MANAGER/ QA/QC
PROJECT: Construction of Solar Power Station
DUTIES
Interface for Quality planning for campaigns and projects. This includes “front end planning” phases including performing quality risk assessments, developing “quality strategies”, development of project specific quality management plans, resource plans and forecast quality/ inspection related costs.
Conducting compliance audits, subcontractor’s assessments.
Quality Assurance related to tender reviews, contract establishment and management
Quality Assurance related to equipment/commodity vendors and recommending approval for “approved vendor listing” (AVL’s)
Responsible for quality requirements in Material Requisitions for direct purchase arrangements
Coordinate the Supplier Quality Surveillance (SQS) processes and contracts
Oversee the Inspection Release & Certification (IRC) process
Coordinate the Non-Conformance Reporting (NCR) process
Process Supplier Deviation Requests & Queries (SDRQ’s) and Technical Queries (TQ’s)
Ensure that Implementation quality processes meet the needs of the business
Ensure all required project quality records are compiled and placed in records management in accordance with corporate and regulatory requirements.
Feb 16 to Aug16
EMPLOYER: Krabi Power station
POSITION: QUALITY MANAGER/ QA/QC
PROJECT: Stacker Reclaimer Overhaul
DUTIES: • To be the Company Management Representative for Quality Management System
• Ensuring that processes needed for the Quality Management System are established, implemented and maintained;
• Reporting to top management on the performance of the Quality Management System and any need for improvement;
•Designing and conducting occupational training procedures and policies
• Responsible for liaising with external parties such as Consultants, Certification Bodies, etc., on matters relating to the Quality Management System;
• To maintain, promoting and improving the Company Quality Management System;
• To ensure, in accordance with Laws, Rules and Corporate Guidelines and Standard, the implementation, updating, review and auditing of the Company Quality Management System (QMS);
• To monitor the effective implementation of appropriate QMS general procedures and working instruction and provide for their updating in accordance with changes in legislation and Standards;
• Develop all procedures for fabrication and erection activities, such as Inspection and Test Plan, Non Conformance Procedure and et cetera;
• Review and check all QC related engineering document prior to be issued;
• Review Purchase Requisition of material and equipment;
• Ensure all sub-contractors follow and comply with standards/codes requirements of project
Jan15 to Feb 16
EMPLOYER: POSCO Energy, Mongolia
POSITION: QUALITY MANAGER/ QA/QC
PROJECT: Choibalsan power station, boiler reinstallation and overhaul of ancillary plant (firing system, mills, soot blowers, live steam and feedwater systems and district heating preheater)
DUTIES: • Responsible for preparation all QA/QC Documents including ITP, ITR and obtain approval from Owner/Client;
• Responsible for preparation and qualification of Welding Procedures, Welder Qualification;
• Plan and Conduct Audit including internal audit and audit to sub-contractor to implement and control QA Activities;
•Designing occupational training procedures, policies and programs across broad range of disciplines (safety, technical, cultural and leadership) • Assists safety group in maintaining safety operation regarding welding work, radiography and PWHT, specially for handling and storing of radioactive materials;
• Maintains close contact with OWNER/CLIENT:
• Attend weekly meeting with Owner and Client on inspection activities;
• Reviews and issues weekly report to Client including :
o Inspection reports, include Radiographic Examination report
o Updated list of all outstanding rejects/Non Conformances.
• Attend meeting with subcontractors on QA/QC matters;
• Reports quality matters to Project Manager;
• Manages all non-conformances and takes appropriate action;
Feb14 to Jan15
EMPLOYER: Shell Thailand Pty Ltd,
POSITION: QUALITY MANAGER/ QA/QC
PROJECT: Shell terminal Extension Rayong, (Thailand),
DUTIES: • Responsible for overall control of QC activities and implementation of the Quality Plan;
• Monitors implementation of field inspection policies and procedures;
• Directs sub-contractor about quality matters as per project requirement;
• Reviews individual inspection/testing procedure for each category of work, prepared by engineer in charge or by subcontractor to ensure all pre- requisites, project specification and codes are satisfied, when required.
• Supervision and allocation of inspection teams;
• Responsible for preparation all QA/QC Documents including ITP, ITR and obtain approval from Owner/Client;
• Responsible for preparation and qualification of Welding Procedures, Welder Qualification;
• Plan and Conduct Audit including internal audit and audit to sub-contractor to implement and control QA Activities;
Feb13 to Feb14
EMPLOYER: PanAust Lao mine site
POSITION: QUALITY MANAGER/ QA/QC
PROJECT: Upgrade mine site Project Laos
DUTIES: Formulate and manage the development and implementation of goals, objectives, policies, procedures and systems pertaining to the quality assurance and regulatory functions. Develop, implement, communicate and maintain a quality plan to bring the Company’s Quality Systems and Policies into compliance with quality system requirements. Manage documentation related to Quality System guidelines. Quality Assurance project lead for cross-functional projects including determining QA timelines, plans and position strategies. Manage and maintain the quality aspects of the Design Control Program including but not limited to design input and output documentation, applicable risk analyses, verification and validation activities and formal design reviews. Provide leadership for developing and directing Quality Assurance and Quality improvement initiatives (Cost-of-Quality reductions, Audit system, etc.) for all processes and services. Manage and maintain the Company’s internal quality audit program and assess improvement initiatives resulting from all Quality Audits - internal and external. Verification of all Inspection activities carried out on site. Inspection of Plant Equipment LNG Tanks Structural steel, pressure vessels, Check and record the weather conditions prior to blasting, paint application and during the application with regular interval as per ITP requirements on various items of plant equipment, Check for salt contamination after blast cleaning, Visually check the surface profile and cleanliness after blasting, Ensure the proper mixing and application of paints Ensure the minimum over coat period before application of subsequent coats Checking of WFT during paint application and ensure the minimum required WFT,. Verify the DFT before over coating and also ensure that over coating is done within manufacturer’s recommended coating interval time. Checking of curing and adhesion tests, Carry out holiday inspection for underground and internal linings, Visual inspection of final coat to ensure no paint defects in the paint films.
Sept 12 to Feb13
EMPLOYER:
LEIGHTONS Mongolia
POSITION:
QUALITY MANAGER/ QA/QC (SITE Mongolia)
PROJECT:
The Salkhit Wind Farm Power Project Ulaanbaatar Mongolia
DUTIES:
Responsible for the Project Quality Control System for Site, Development of Project Quality Documentation and Procedures that address client requirements. Control of the quality assurance processes, sample of these processes are, Assessment of Sub-Contractors, Internal Audits, Corrective and Preventive Actions, Non-Conformance Report, Ect. Control of 10 inspectors and Document Control.
Verification of all Inspection activities carried out on site. Responsible for quality handover to commissioning.Manage Quality organization including quality planning, preventive action, non-conformance control, corrective action, management of change, audits and project quality reporting and KPI review. Manage and maintain the Company’s internal quality audit program and assess improvement initiatives resulting from all Quality Audits - internal and external. Quality Inspection of control center building, Remote Transformer buildings including full insulation checks of building including fit-out. Responsible for onsite material delivery.
Oct 10 to 12Aug
EMPLOYER:
POSITION:
PROJECT:
DUTIES:
March 09 to May10
EMPLOYER:
POSITION:
PROJECT:
DUTIES:
Aker Solutions Ltd (Oil Search)
Quality Manager (SITE, Kuala Lumpur, Malaysia )
The Kutubu PNG LNG Project in Kutubu, Papua New Guinea
Company Representative for Quality in KL. Inspected packages for equipment such as Rotating (process gas compressors, generators, centrifugal and positive displacement pumps, blowers), Static (heat exchanges / pressures vessels, Liquide oxygen tanks, chemical injection package, filters, etc.) Attend FAT for equipment at supplier's shop.
Coordinate with construction team for installation of equipment.
Check the compliance of the equipment with project drawings. Check suction and discharge piping alignment. Conduct mechanical punch list.
Prepare QC surveillance report found during daily monitoring and or witness inspection. Inspection includes foundation elevation, padding, anchor bolts, levelness, verticality and centring, pre-alignment / final alignment.
Equipment inspected are as follows: gas turbines, gas compressor, steam turbine, pumps, air compressor, equipment packages, drums, vertical vessel, horizontal vessel, tanks, exchangers, steam boilers, furnaces, blowers, HRSG, filters, loop reactor, air fin coolers, ship loaders and stackers .
Responsible for monitoring/quality of Rotary and Stationary equipment located in all Fab shops by performing mechanical supervision including pressure vessels, columns, drums, heat exchangers, fin fans, boilers, coolers, tanks, valves, piping system and pumps, motors, compressors, lube oil skid, turbine and others. Perform / assist commissioning team to verify and check all list items equipment ready for FAT Testing/Handover.
Carry out the preliminary and final inspection materials related to Mechanical for conformity with quality norms as per project specifications. Inspection at subcontractors works for painting and insulation of liquid oxygen Tanks inspection included Carrying out of high voltage holiday tests for coating and wet sponge test for detecting of pin holes in paints.
Familiar with relevant international standards such as ASME, AWS,BS, ASTM, ANSI, API in particular such as: API 1104, 510, 570, 653/650, 686
MCC MINING
QUALITY MANAGER (SITE)
Sino Iron Project
Formulate and manage the development and implementation of goals, objectives, policies, procedures and systems pertaining to the quality assurance and regulatory functions. Develop, implement, communicate and maintain a quality plan to bring the Company’s Quality Systems and Policies into compliance with quality system requirements. Manage documentation related to Quality System guidelines. Quality Assurance project lead for cross-functional projects including determining QA timelines, plans and position strategies. Manage and maintain the quality aspects of the Design Control Program including but not limited to design input and output documentation, applicable risk analyses, verification and validation activities and formal design reviews. Provide leadership for developing and directing Quality Assurance and Quality improvement initiatives (Cost-of-Quality reductions, Audit system, etc.) for all processes and services. Manage and maintain the Company’s internal quality audit program and assess improvement initiatives resulting from all Quality Audits - internal and external. Verification of all Inspection activities carried out on site, including Inspection of Blasting & Painting/Coating Inspection which includes Surface Cleanliness Check, Blasting Profile Check, Humidity & Dew point Check, Dry & Wet Film Thickness Check, Wet sponge pinhole detection test, High voltage Holiday test Inspection of all buildings on site including commissioning.