Michael Asbury
Building Inspector I have over *7 years of experience in public
jurisdictions, power project inspection, and
construction experience. I have served as Building
Education Official and lead consultant to several municipalities
and special districts in California. I have performed
inspections and plan reviews to verify code
Construction Management, compliance with state codes and local municipal
California State University codes for various municipalities and special districts
Fresno, Fresno, CA including multiple power plant projects and the
Stockton and Tracy wastewater treatment plants.
Several of the power generation projects I have
Building Code Curriculum, been assigned to involved electrical transmission
Fresno City College, and substation components. Dam spillway
construction in environmentally sensitive areas.
Fresno, CA Hydro test on gas transmission pipe lines. My
responsibilities have included: the oversight of day
to day activities of inspection staff, as well as
Registrations/Certifications training inspectors on code compliance, safety, and
building products.
ICC Building Inspector (Exp. Project Experience
1/3/2017)
Shiloh III Wind Energy Project
ACI Certified Technician EnXco
Performed inspections of underground electric,
including conductor type, size, location, depth, type
Professional Affiliations of cover, and backfill. Junction boxes, splices, and
terminations. Underground side boring and verify
underground conductor sleeve type.
American Concrete Institute El Centro Energy Center
Inland Empire Irrigation District
ICC Performed inspections for the construction of a new
transmission line and towers from generating
CALBO center to substation, also upgrade circuit breakers
in substation; including control wiring and new
controls
2020 Hydrostatic Testing
Pacific Gas & Electric
Performed observations of hydrostatic tests,
Total Years of Experience reported that contractorsite specific test with in the
conducted
requirements of PG&E test procedures
and A-37 gas pipe test procedure.
37+
Blue Lakes Dam Spillway
Pacific Gas & Electric
Performed inspections for the construction of a new
spillway at the lower Blue Lake Dam. The concrete
spillway was installed in a nature stream bed, and
had many environmental concerns. The spillway
also had ice breaking requirements for the spring
run off.
El Cajon Energy Center
City of El Cajon
Performed inspections for the construction of the El
Cajon Energy Center, a 48 MW pecker power plant.
The project was on line in 90 days, a very fast pace
job. The natural gas facility utilizes the latest in fuel
efficient technologies and SCR scrubbers to
minimize the environmental impact.
Colusa Generating Station
Pacific Gas & Electric
Performed inspections for the Colusa Generating
Station, a 660 MW combined cycle generating
facility. The natural gas facility utilizes the latest in
fuel-efficient technologies to minimize the
environmental impact while ensuring reliable
electricity at reasonable costs.
Humboldt Bay Repowering Project
Pacific Gas & Electric
Performed inspections for the construction of the
163 MW generating capacity power station. This
project is located on 5.4 acres within a 143-acre
parcel. The HBGS is a load following power plant
consisting of10 natural gas-fired Wärtsilä 18V50DF
16.3 MW reciprocating engine-generator sets and
associated equipment.
Project Experience continued…
Panoche Energy
Panoche Energy Center, LLC
Performed as Chief Inspector of the project a 400 MW simple-cycle generating
facility. The facility site is located on a 12.8-acre site within a 128-acre parcel.
Offsite improvements associated with the project include a 400-foot paved
access road south of West Panoche road to the plant site, 2,400 linear feet of
new gas pipeline, 300-foot transmission line to tie into the Panoche substation,
and the PG&E expansion of the Panoche substation by approximately 1.1 acres
south of the existing substation boundary.
Inland Empire Energy Center
Inland Empire Generating Station
Performed inspections on the Inland Empire Energy Center this project is based
on two GE 107H combined-cycle systems, GE's latest gas turbine technology.
The project is capable of meeting the energy needs of almost 600,000
households in one of the fastest growing regions in the state.
Helms Hydro Retrofit
Pacific Gas & Electric
Performed inspections on a retrofit of the facility that was originally opened in
1984. Line bore of wicket gates in turbine number 3, security doors locks and
circuits, and emergency notification system.
Stockton and Tracy wastewater treatment plants
City of Stockton and City of Tracy
Performed inspections on waste water treatment plants retro fit, and new
expansion; to include underground water piping, chlorine ponds, holding tanks,
pumps and valves. Underground electric conduit, wire pulls, splicing, and junction
boxes. Above ground electric switch gear / panels conduit, lighting, and
exposition proof assembles in hazards class areas. Tertiary tanks, and fiber
fillings.
Inspector City of Sacramento
City of Sacramento
Performed inspections and plan review to verify project compliance with
California model codes and the local municipal code. Advised owners, architects,
engineers and contractors of code and construction requirements. Prepared
reports on fire damaged buildings and code enforcement findings. Lead inspector
to client.
Interim Building Official
City of Selma
Performed complex inspections and plan review to determine California model
codes, State accessibility and energy standards, municipal codes, minimum
housing-zoning codes and code enforcement activities. Supervised inspectors,
counter staff, code enforcement staff, and met with department managers to
verify feasibility of proposed projects form a code review standpoint. Responsible
for department budgets and staff assignments.
Building Official
City of Fowler
Conducted inspections and plan reviews on complex projects, provided oversight
for the city’s code enforcement group, and worked with the city planner on zoning
ordinance issues. Interfaced with owners and project representatives at
development review meetings. Worked with the fire department to coordinate fire
sprinkler inspections and plan checks. Responsible for department budget and
staff assignments.
Building Inspector
City of Clovis
Performed inspections and plan review to verify project compliance with
California model codes and the local municipal code. Advised owners, architects,
engineers and contractors of code and construction requirements. Prepared
reports on fire damaged buildings and code enforcement findings.
Building Inspector
City of Fresno
Performed inspections and plan review to verify project compliance with
California model codes and the local municipal code. Also prepared reports on
fire damaged buildings, performed plan review, and assisted the housing
department with code interpretations.