SARTAJ AHMED SIDDIQUE

E-mail ac8zpi@r.postjobfree.com

E-mail ac8zpi@r.postjobfree.com

Mobile no: 009**-*********

Mobile no: 009**-*********

Applied for: - Civil Inspector/ Civil Engineer

Career Objective:

Seeking a challenging position in a leading organization where my skill & talent could be utilizing for the development of organization & my future should be bright when I worked with this organization.

TECHNICAL QUALIFICATION

DIPLOMA IN CIVIL ENGINEERING FROM ALIGARH MUSLIM UNIVERSITY ALIGARH (India)

COMPUTER SKILLS

AUTO CAD 2010, MS OFFICE, WIZ, PHOTO SHOP, 3D MAX, 3D ARCHITECTURE

Experience Summary

NKY- Architects & Engineers Consulting Company

Designation: - Civil Inspector QA from the ministry of interior

Duration: -From 29th November2014 to Continue

Project: -King Abdullah bin Abdul-Aziz for security facilities KAP2-E 1&E2 Makkah

Owner: -Ministry of Interior.

Contractor: - Beijing Emirates International Company BEC

1. KAP2-E1 EMERGANCY FORCE CAMP (A) for Hajj &Umrah Location JUMMUM MAKKAH

The Total cost of this project is 852 million Riyal &Total Area of this project is 1000,000 (1 million) m2 contain Housing, villas, VIP villas, training Dormitory, student Dormitory, Administration, Medical Center, Education building, Mosque, Theater, Restaurant, Sport Center, Workshops, Ware house, Stadium bleacher, Tribune, watch tower, Sub-stations, External and internal Infrastructure works such as (sewer system, sewage treatment plant, firefighting, Irrigation, water network, drainage system and Roads).

2. KAP2-E1 Location ARAFAT MAKKAH

The total cost of this project is 750 million Riyal & total Area of this project is 500000 m2 contain official building such as shoulder dormitory, Administration, Dining Hall low rank officers & officers accommodation, ware house, Mosque, parking road work, sewage plant, etc

3. KAP2-E1 MEDICAL CENTER NEAR MASJID AISHA MAKKAH

The cost of this project is 450 million Riyal main medical building, two nursing dormitories, service building, Mosque, main gate fence, guard rooms etc.

4. KAP2-E2 EMERGANCY FORCE CAMP (B) JURANA MAKKAH

The total cost of this project is 800 million Riyal there is four training Dormitories, housing units, main mosque, Administration, Educational Building, main Restaurant, work shop, Stadium Bleacher, Tribune, watching tower, External and internal infrastructure work such as (sewer system, sewage treatment plant, fire fighting, irrigation, potable water network, drainage system and Roads.

Key Responsibilities:-

Quality assurance of site activities checking hold points, witness points, surveillance points with submitted inspection request IRs from the contractor insure the construction activity as per drawing & project specification .complying material submittals as per specification .check of work to ensure that it is in full compliance with contract requirements. Review minutes of the preparatory meeting. Verify adequacy of controls to ensure full contract compliance Verify required control inspection and testing. . Establish level of workmanship and verify that it meets minimum acceptable workmanship standards. Compare with required sample panels as appropriate Check safety to include compliance with and upgrading of the plan and activity hazard analysis. Review the activity analysis with each worker. Daily report to senior Engineer about construction activity with photo reports.

Al Latifia Trading & Contracting Company

Designation: - QA/QC Engineer

Duration: - From 22 May2010 to November 2014

Owner: - General organization of social insurance

Consultant: - Omrania & Associate

1. Riyadh Hilton Hotel & Residence (GOSI)

The cost of this project is 2.2 Billion Riyal

Mainly two towers hotelG+23(646 Rooms) &apartmentG+14(221aprtments), 2 level car parking, wedding hall, Asian restaurant, Iranian restaurant, All day dining, summing pools, podium level, landscape above car parking basementetc.

Perform as a structural QC and follow all internal& client inspection with consultant (lay out, steel reinforcement, shuttering & form work) third party inspection, lab report, concrete inspection embedment inspection etc.

Perform as a Finishing Engineer inspections (false ceiling, block work, plaster, primer& putty, paint, epoxy, marble, vanity, door magi, wooden panel, stone, tile, door windows, curtain wall, facade work, glass panel, kitchen equipment, elevators, escalators, reflected ceiling, cove lights, GRC panel, furniture lay out etc. coordination between sub contactor & consultant. sort out variation problem between consultant &sub-contractor. Submitting Query when clashes between architecture & MEP or other discipline. Submitting daily progress up date for sub-contractor invoice

2. Granada Housing & Business Park (GOSI)

The cost of this project is 1.9 Billion Riyals mainly six towers 2TowerG+21, 2TowersG+172TowersG+14, four low rise Building G+7, Business center G+10, 3level car parking,12 villas Housing compound, recreation center, landscaping above car parking basement

Consultant: - Omrania & Associate

Perform all structural inspection (lay out, steel reinforcement, shuttering & form work) third party inspection, lab report, concrete inspection embedment inspection etc.

Finishing inspection (block work, plaster, primer & putty, paint & epoxy, marble, stone, tile, door windows, certain wall, facade work, glass panel, elevators, escalators, reflected ceiling, cove lights etc.

3. King Abdul Aziz Center for National Dialogue

The cost of this project 1.2 billion Riyal mainly three tower G+7,2level car parking basement

In the beginning of this project Worked as a concrete coordinator, concrete arrangement, concrete quality & approval from the consultant, structural inspections, material submittal & approval, Architectural& finishing inspections etc.

Designation: - QA/QC Engineer/ Concrete Coordinator

Consultant: -H.A.K Associate

4. Marafiq Housing project For Aramco Jamudah District – Jubail

Client Name: -Royal commission

POWER & WATER UTILITY COMPANY

FOR JUBIL & YANBU (MARAFIQ)

Consultant: -Dar Consulting Engineers, PMC Sofcon

This is a housing project of 250 villas in Jalmudah district Jubail kingdom of Saudi Arab near Arabian Sea the cost of this project is 1.2 billion Riyal there is 7 different types of villas and one mosque I’m working as an Architectural QC for finishing work from CMU plaster, painting work, tiles aluminum door windows, wooden flooring, marble flooring mosaic flooring suspension ceiling etc. Checking& inspected with PMC & taking approval for prior activity & solve all type of notices like NCN, NCR, ON, SIN

Skills & Abilities

Monitoring closely site activities to ensure the quality of work is in compliance with the requirements of the contract & specification and good construction practice, and verifying only approved materials are used, compliance with shop drawings and specification submit a report to the QA/QC manager regarding preventive & corrective action follows on site.

Implementation of quality control procedure according company quality manual Make sure that any activity offered for his inspection has proper RFI format, approved shop drawing, method statement (MS), quality control procedures (QCP), Inspection Test Plan (ITP) etc.

QCP and ITP must be according with index Master project. Closely watching the concrete pour and check concrete products continuously delivered to the site, and to ensure compliance with the procedures of quality assurance / quality control, and ensure that all tests concrete out according to the requirements of the contract.

Ensure that the quality and safety aspects of the construction. Make sure that any non-conformity has been reported through the corresponding report is (NCR), reviewed by a line supervisor or Construction manager Must coordinate all NCRS with PMT. Advise Planning Engineer and construction manager regarding any slippage of progress related to the site activities. Preparing of Quality Checklist & progress update Reports for QA/QC manager.

To inspect and record the construction work carried by the contractor on site and resolve the sit generated Quarries by coordinated with PM

Involvement where required in Work Inspections, Material Inspections, Mockup Inspections and Factory Visits. Review and monitor variations to the work to mitigate time and cost impacts for any required changes. Supervising and overseeing the analysis, inspection, design, and testing, to ensure the highest standards of quality. Coordinate with CM to arrange and conduct Quality Meetings with sub-contractor on regular time interval Agreed COMPANY’s QC

HAIF TRADING& CONTACTING COMPANY

Designation: QA/QC Engineer

Duration: 19 May2008 to 20 May2010

1. Jeddah Hilton Hotel & Royal Apartment

I involve in handing over, snag of Jeddah Hilton Hotel & royal palace with Haif company

To assist/clarify the Procurement department for the Civil and Architectural finishing materials procurement.

Co-ordination and follow up with the supplier/ manufacturer for their Materials/shop drawings submittals/ approvals, technical clarifications, material delivery and installation of concerned item of work(s) at site.

Providing technical clarifications at site for the Architectural and civil work issues.

Closing the NCRs (noncompliance report) and RFIs (request for inspection) for both material delivery/installation and site works. Raising TQs (Technical Queries) to consultant in case of any missing information or design discrepancies in contras

&design drawings. Site Coordination, shop drawings and related documentation works for 11 nos. passenger elevators, 4 nos. service elevators, and 4 nos. Escalators with KONE Elevators (in Hotel Project) up to final testing and commissioning stage. Preparation and coordination for door/ window detailed technical schedule and shop drawings for final approval and procurement. Attending WAR (Work, Action & Resolution), Technical Coordination and work Progress Meetings with the Project Management, Supervision Consultants and other subcontractors. Worked on value engineering aspects/ solutions for cost saving purposes in the project. Technical and official coordination with Project Management and Supervision consultants for their Approvals/ comments of Material, shop drawings and method of statement submittals.

2. King Abdul Aziz University Jeddah (Faculty of Engineering & Science)

The cost of this project is 500 &600 million riyal. Faculty of engineering (004.5) & Faculty of science (005.5) this project divided in many blocks (phase)

Consultant: - FLUOR ARABIA LIMITED P.O.BOX -8120 Jeddah 21482 Saudi Arabia

Ability to follow and implementation of quality standard & procedures

To act independently and ensure that quality objectives are met with

Performing inspections of materials arriving at site

Performing inspections of Architectural works such as installation of Dry walls masonry wall

Thermal insulation system, Tilling, façade, painting, ceiling, aluminum and wooden works etc. Liaison with consultants/Engineers in matters pertaining to inspections, and Quality check for material and installation. Monitoring project quality control procedure & specification

Issue non-conformance reports when the specification or procedural requirements are not conducting off-site inspections of materials and fabrications in accordance with the specified requirements of min contract documenting all inspections and tests on pro-forms as required and contract specification monitoring the installation work prior to submission for inspection advising of any deviation from the specification Conduct snagging/punch list prior to handing-over of completed works

DELTA ELCTROMECHANIC & CONTACTINGCOMPANY

1. Makkah T.V Center HOLY Makkah

Consultant: - Zuheir Fayez partnership consultant

Duration: - 19 September 2006 to 31May2008

Worked as site Engineer

Preparation of construction plan to execute the work within the contract period

Regular meetings with client & consultant

Coordinates with sub- contractors and follow up for their respective works

Organizing the work force to achieve the work as per construction program

To arrange and ordering material as per site requirement smoothly

To look after concrete pouring arrangement as per quantity required and Manpower/machineries and supervision

Following up with inspectors, supervising contractors; works to ensure that it is in accordance With drawings & specifications; maintaining quality parameters with the construction standards, Reviewing& replying to contractors submittals such as materials, shop drawings, and methods Statement of construction activities; reviewing & commenting the material test reports. Monitoring the team; coordinating with Architects, MEP Engineers, intimating the problems and giving necessary guidance for proper coverage to follow up with submittals &supervision verifying the quality of material delivered at site.

Supervising projects during execution of different types of building from foundation to the defect Liability period.

AL- BARKAT EDUCATIONAL SOCIETYALIGARH U.P (India)

Designation: Client Engineer (from the management &consultant)

Duration: 19 May2002 to 31May2005

Company: I-Tech Engineers and Contractors LTD

Consultant: AHMED& ASSOCIEATS

Duties & Responsibilities:

1. Testing of material from approved laboratory and final inspection preparation.

2. Attend regular meeting with client and consultant.

3. Coordinating with contractors& consultant

4. Site preparation, review and monitor soil testing, compaction testing, placement methods

5. Inspection at ready mix concrete and asphalt plants and pre-cast yards.

6. Structural steel receipt inspection and erection inspection such as verticality, elevation, level bolts tightening, grouting

7. Submit daily progress report to Clint with consultant comments & explain site condition

Date: - Sartaj Ahmed Siddique