Post Job Free
Sign in

Power Plant Engineer

Location:
Coimbatore, TN, India
Posted:
November 01, 2017

Contact this candidate

Resume:

CURRICULUM VITAE

G.VELLIKAMALANATHAN

Email id:

ac22l8@r.postjobfree.com

ac22l8@r.postjobfree.com

Contact No.:

(Mob) 960*******

Permanent Address:

**-*,

Shanthi Nagar

Mettupalayam

Tamil nadu, India

Personal Details:

Date of Birth: 27/05/1984

Sex: Male

Father Name: Ganeshan.K

Marital Status: Married

Nationality: Indian

Languages Known: Tamil, Hindi & English

Passport No: P6010311

Valid Up to: 05-01-2027

OBJECTIVE:

Seeking a career as an Engineer to utilize my abilities on challenging assignment where my skills will positively contribute and benefit the organization while being resourceful, innovative and flexible.

EDUCATIONAL QUALIFICATION :

B.E(Mechanical Engineering) Percentage: 71% Year: - 2005

Maharaja Engineering College,Avinashi.

Hr. Secondary Percentage: 85.75% Year: - 2001

S.S.L.C Percentage: 80.8% Year: - 1999

SOFTWARE PROFICIENCY:

Design Software : Diploma In Computer Aided Drafting And

Designing,

Software : MS-WORD, MS-EXCEL,MS-POWE POINT

PROFESSIONAL EXPERIENCE

Asst.Manager – ISGEC Heavy engineering ltd from July 2015 to till date

Leading Executive Engineer - Thermax Limited from Dec 2013 to July 2015

Senior Executive Engineer ( Site incharge)– Cethar Ltd from June 2005 to Oct 2013

COMPANY PROFILE:

ISGEC is an ISO9001:2000 corporation in Power,EPC, Oil & Gas, Sugar & cement sectors and now capable of setting up to 300MW thermal power plants and also its executing the projects in various part of India and all over the world.

DETAIL OF THE PROJECTS HANDLED:

1) 1X12 MW (51TPH),FBC Power plant in M/s.SHYAM STEEL LTD, at Kolkata.

Designation: Site Engineer, Duration –June’05-Aug’06.

2) 1X8 MW (40TPH),AFBC Power plant in M/s.Ankit Metals Ltd,at Kolkata.

Designation: Site In charge, Duration – Aug’06-Sep’07.

3) 1X12 MW (45TPH-FBC,10TPH-WHRB Power plant in M/s.Maachinnamasthika Ltd, Kolkata.

Designation: Site Coordination, Duration – Dec’06-Sep’07.

4) 1X10MW (30TPH-Travelling Grate to 45TPH -FBC Power plant in M/s.ACC Ltd,at Chaibasha,Jharkand.

Designation: Site In charge, Duration – Oct’07-Sep’08.

5) 2X15 MW (70TPH-CFBC) Power plant in M/s.ACC Ltd,at Orissa.

Designation: Site In charge, Duration – Oct’08-Aug’10.

6) 2X10 MW (45TPH-FBC) EPC Project Power plant in M/s.Usha Martin Ltd at Jharkhand.

Designation: Site Co ordination, Duration – Oct’08-Aug’10.

7) 1X30 MW (135TPH-CFBC) Power plant in M/s.Sakthi Sugars Ltd at Erode.

Designation: Site Incharge, Duration – Aug’10-Mar’11.

8) 1X20 MW (90TPH-FBC) Power plant in M/s.Megmani Fin Chem Ltd at Gujarat.

Designation: Site Incharge, Duration –Mar’11-Dec ’11.

9) 1X60 MW (251TPH-CFBC / EPC) Power plant in M/s.ARS Metals Ltd at Gummidipoondi.

Designation: Site Incharge, Duration – Dec’11- June’ 13.

10) 5x500tph ( CFBC – “U-BEAM “ design ) Power plant in M/S RELIANCE INDUSTRIES LTD at Hazira, Gujarat

Designation: Lead Engineer, Duration – Dec’13- July 15.

11) 1x300 tph (CFBC- CYCLONE type).boiler erection in M/S DCM SHRIRAM ALKALI &CHEMICALS at ankleswar,Gujarat.

Designation: Asst.Manager, Duration – July 15 to till now.

12) 1x100 tph (CFBC- CYCLONE type).boiler erection in M/S DEEPAK PHENOLICS LTD at Dhahej,Gujarat.

Designation : Asst.Manager, Duration – Sep2016 to till now. .

TECHNICAL RESPONSIBILITIES:

Inspection of Boilers as per P&I diagram.

Inspection of Steam Drum internals.

Checking of Steam, Water & Auxiliary Turbine Piping as per IBR Standards.

Inspections of Main Steam line and boiler supports inspection and set the spring hanger supports.

Co-ordination with Technical drawings / Design department for necessary changes in routing of piping.

Preparing the erection schedule of boiler.

Executing as per schedule date and achievement of every milestones.

Co-ordinate with the contractor and client.

Maintain the records with easy identification.

Ensure sequence of erection according to the drawing.

Proper manpower planning for execution.

Material management as per requirement.

Daily and weekly erection performance ensure as per schedule.

Cause and remedy chart maintain according the site action report.

Co-ordination with external agencies for inspection, client and IBR.

MANAGERIAL RESPONSIBILITIES: (As SITE INCHARGE)

Involved in site activities, customer co-ordination, Manpower management, Project schedule implementation.

Planning Manpower resources with required tools, consumables.

Planning the monthly and weekly Erection schedule.

Execution the completion of boiler as per customer schedule.

Fabrication of Non Pressure parts (fabricate based on erection sequence)

Ensure the material sequence.

Ensure T&P as per schedule requirement.

Co-ordination with external agencies for inspection, client and IBR,

Plan & Schedule the total erection of Boiler, the same to be submitted to Client.

Maintain safety procedures and records, conducted safety meetings and audits.

Planned and Reviewed daily progress of project and experienced in implementation of Project schedule with effective man power.

DETAILS OF SHUT DOWN PROJECTS:

1X8 MW (35TPH-WHRB) Captive power plant in M/s.JSW at Salem.

Shutdown Work Coordination.

1X20 MW Captive power plant in M/s.Megmani Fin Chem Ltd at Bharuch.

Modification & shutdown work of all Interconnecting piping

M/s Seagram Distillries Ltd,Nasik

Modification of Super heater coil works with IBR coordination.

M/s. Shree Cements Ltd,Rajasthan

Shut down work coordination

For all the above shut works are carried out within the schedule time and got the appreciation from the Clients.

AREAS OF SPECIALIZATION:

Boiler

Balance of Plants

Fabrication & erection of steel structure

Rotary equipment’s (Fans, Feed Pumps, Compressors etc.)

Piping ( Spool fabrication, Pipe routing & erection)

DECLARATION: