Post Job Free
Sign in

Mechanical Engineering Welding

Location:
Chennai, TN, India
Posted:
August 21, 2017

Contact this candidate

Resume:

VIGNESH.M

Mob: +91-979*******

E-mail ID *************@*****.***

SYNOPSIS

B.E.in Mechanical Engineering professional with 6Years’ experience as QA/QC INSPECTOR in Piping and pipeline construction in Oil & Gas Projects.

Solely responsible for all QC activates, Welding activities, NDT activities .

Knowledge in Reading of P&IDs and Isometrics and preparing hydro test and pneumatic test packages.

Familiar with the piping codes and standards, quality and testing practices, safety requirements & the productivity norms in general.

Managed resources, trouble shooting, tracking progress and work front creating for timely, proper & safe execution and completion of the project.

ADDITIONAL QUALIFICATION

CWSIP 3.1 Welding Inspector (ID.NO -708533) waiting for result.

Certified ASNT Level – II in Nondestructive testing as per standard ASNT–SNT-TC–1A

Dye penetrant testing (DPT)

Magnetic particle testing (MPT)

Ultrasonic testing (UT)

Radiography testing (RT)

Radiographic testing film interpretation (RTFI)

CORE COMPETENCIES

Welding:

Review of filler metal batch certificate as per project requirement.

Inspection of joint fit up before welding as per the relevant WPS.

Inspections of Root, preheat, post heat, and inter pass temperature during welding as per the relevant WPS.

Performing WQT for welders as per relevant WPS.

Inspection of weld final visual after welding as per the relevant standard.

Nondestructive Testing:

To inspect dry penetrate testing.

Performing Visual inspection for welded joints.

Attend radiography repair joints.

Radiography film Interpretation as per standards.

Piping:

Inspection of piping materials as per project requirement.

Inspection of weld visual as per standards.

Inspection of pipe bevel ends, internal and external before welding

Witnessing of Hydro testing and pneumatic test for piping system.

Engineering & Project coordination

Preparing complete test packages (hydro, pneumatic, visual) including check list and all applicable reports as per commissioning marked P&ID.

Coordinating with consultants and sub-contractors for necessary changes.

Monitoring installation and testing of pipe work, valves, and other piping items.

Review hydro test package, carry out inspection of the lines prior to testing.

Line checking, preparation of punch list as per test packages and maintaining traceability of punch list close-out process.

Joint inspection with client for pre inspection of pressure test, conducting pressure test, re-instatement of piping systems.

CAREER HIGHLIGHTS

CLINET:KUWAIT OIL COMPANY (KOC), KUWAIT. Working as a QC INSPECTORfor FINESCO INERNATIONAL GENERAL TRADING CONTRACTING COMPANYin NEWTON ENGINEERING CHEMICALS LTD from July 2015 to March 2017

I am presently looking after the QC, Welding and NDT activities of INSTALLATION OF NEW GAS PIPELINES AND REPLACEMENT/RE-ROUTING OF EXISTING GAS PIPELINES AT BURGAN(S&EK) of various inches 6”,18”, 10”, 12”, 16”, 24” and 36” and REPLACEMENT OF DAMAGED SPARE FLARES OF COANDA HP FLARE AND MF/X LP FLARE.

Projects and constructions (pipeline projects):

Inspection of incoming raw materials and welding consumables as per standard.

To conduct welder Qualification Test (WQT) as per relevant WPS.

To conduct welders and welding operator qualification test scrutinize WPS, PQR, and WPQ.

To monitor the storage and handling of welding rods.

Preparing Documentations of Pipe Book, Loop History Sheet (LHS), weld visual and report.

Inspection of before welding, during welding and after welding.

Follows as per QAP for the stage inspection and final inspection of welding.

Preparing complete test packages (hydro, pneumatic, visual) including check list and all applicable reports as per commissioning marked P&ID.

Review hydro test package, carry out inspection of the lines prior to testing.

Line checking, preparation of punch list as per test packages and maintaining traceability of punch list close-out process.

To carry out Nondestructive Testing.

Knowledge with the piping and Pipeline codes and standards, API 1104 and testing practices

Visual inspection of weld joints as per standards.

Perform Inspection and document review maintains regular contact with the company including reporting all field inspection activities.

Basic knowledge in ISO9001, ISO 14001 and OHSAS18001.

Prepare the reports detailing the result of specialize tests and inspections.

Record results of qualifications, inspections and statutory documentation, as required.

Allocate projects to welders, according to skills and qualifications.

Formulate and maintain records of welding personnel and procedures.

Continuous improvement in welding processes and quality.

Inspection, monitoring and maintaining welding quality on the job.

Before Past Experiences:

CLINET: MANGALORE REFINERY & PETROCHEMICALS LIMITED.PHASE-III

Worked as a QC Engineer (Piping) forTOYO ENGINEERING INDIA LIMITED in HARDWIN CONSTRUCTION PVT LTD. From November 2010 to April 2011.

I have knowledge of piping fabrication and erection, &commissioning.

Coordinate the execution team & Sub contractor.

Quality Supervision & NDT activities.

Study of GA drawings& P&ID, marking plan and fabrication interpretation with respect to job specification and codes.

Coordination with Client to solve Quality issues and to achieve targets.

Adapted safety standards and achieved accident free work site.

CLINET:JINDAL STEEL AND POWER LTD–ANGUL-(ORISSA)

Worked as a QC Engineer (Piping) for AIR LIQUID GLOBAL E&C SOLUTIONS IND PVT LTDin HARDWIN CONSTRUCTION PVT LTD.From May 2011 TO April 2014.

Inspection of incoming raw materials and welding consumables as per standard.

To conduct welder Qualification Test (WQT) as per relevant WPS.

To conduct welders and welding operator qualification test scrutinize WPS, PQR, and WPQ.

To monitor the storage and handling of welding rods.

Preparing Documentations of Pipe Book, Loop History Sheet (LHS), weld visual and report.

Inspection of before welding, during welding and after welding.

To carry out Nondestructive Testing.

CLINET:ONGC PETROCHEMICAL ADDITIONS LTD. (OPAL), Dahej (Bharuch-Gujarat).

Worked as a QCEngineer (Piping) for FERNAS CONSTRUCTION INDIA PVT LTD – Turkey Base in HARDWIN CONSTRUCTION PVT LTD.From April 2014 TO June 2015.

I have done piping job fabrication, Erection & commissioning of HORTON SPHERES FIRE WATER SPRINKLER SYSTEM &ABOVEGROUND CS PIPING.

Coordination with client & PMC for internal punch making & killing of test package obtaining mechanical clearance and NDT clearance.

Coordination with client and PMC.

Maintain daily record, Document of Welding and repair status of relevant activity.

To Co-ordination with Client, Sub-contractor &QC Department regarding technical problem.

Inspection of Fit-up & welding joints.

Study of GA drawings & P&ID, with respect to job specification and codes..

Knowledge in international standard & code (API1104,ASME IX and ASME V)

ACADEMIA

Qualification : B.E.in Mechanical Engineering from S.N.S. College of Technology,

TamilNadu-2010 with 62%

: HIGHER SECONDARY fromSRSI MATRIC HR SEC SCHOOL,

TAMIL NADU -2006 with 87.6%

Computer Skills : MS Office- Word, Excel, Power Point.

PERSONAL DETAILS

Date of Birth : 15 September 1988

Languages Known : English, Hindi & Tamil.

Passport No : J2503851

City : Coimbatore

Pin Code : 641301

State/Country : Tamil Nadu/India

DECLARATION

I hereby declare that all the above information’s are true to the best of my knowledge and believe.

PLACE:

M.VIGNESH

DATE:



Contact this candidate