Post Job Free
Sign in

Plant Power

Location:
Salisbury, MD
Salary:
open
Posted:
July 18, 2017

Contact this candidate

Resume:

RODNEY S. SELL

**** ******** ****** *****: 727-***-****

Clearwater, FL 33755 Email: ac1dap@r.postjobfree.com

OBJECTIVE

Desire a position as a Nondestructive Testing Technician and/or Computer Programmer where I can best utilize my experience and training. I am willing to travel and/or relocate given the right opportunity.

AREAS OF KNOWLEDGE

**Magnetic Particle **Liquid Penetration Inspection

**Radiation Safety **Radiography

**Ultrasonic Inspection **Welding Codes and Standards

**Visual Weld **Leak and Eddy Current Inspection

**VT 1,2,3 **Real Time X-Ray

**Mechanical **IWE/IWL

EDUCATION

ROGERS STATE COLLEGE, Claremore, OK 1987

Associate Degree in Applied Science: Computer Science

SPARTAN SCHOOL OF AERONAUTICS, Tulsa, OK 1981 – 1982

Nondestructive Testing Technician Course, GPA: 3.3/4.0

LEVEL TESTING

Equivalent Level 2, practical and written tests taken and passed in all phases of NDT at Spartan School of Aeronautics.

QC/NDT NUCLEAR

WORK

EXPERIENCE

SYSTEM ONE, SC 4/10/17-5/28/17

VISUAL WELD, VT 1,2,3 MT, PT, MECHANICAL, IWL

VC summers, Nuclear Plant SC, Head Replacement

SYSTEM ONE, NY 2/28/17 - 4/06/17

MT, PT, VT 1, VISUAL WELD

Indian Point, Nuclear Plant NY, Refuel Outage

SYSTEM ONE, NY 1/09/17 – 1/28/17

MT, PT, VISUAL WELD

Fitz Patrick, Nuclear Plant NY, Refuel Outage

SYSTEM ONE, AR 9/04/16 – 10/20/16

MT, PT, VISUAL WELD, VT 1

ANO, Nuclear Plant AR, Refuel Outage

SYSTEM ONE, NY 3/28/16 – 4/30/16

VISUAL WELDING

Nine Mile, Nuclear Plant NY, Refuel Outage

SYSTEM ONE, SC 2/11/15 – 3/15/16

IWE/COADING TRAINING HOURS

Browns Ferry, Nuclear Plant AL, Refuel Outage

SYSTEM ONE, SC 9/28/15 – 2/7/15

MT, PT, VUSUAL WELD, VT 1,2,3 MECHANICAL

VC Summers, Nuclear Plant SC Refuel Outage

IQC, BUTLER, PA 3/22/15 – 3/17/15

MT, PT, VUSUAL WELD, VT 1,2,3, MECHANICAL

DC Cook, Nuclear Plant, MI, Refuel Outage

URS/WASHINGTON GROUP 2/26/15 - 3/17/15

MT, PT, VISUAL WELD, VT 1,2,3, MECHANICAL

River Bend, Nuclear Plant, LA, Refuel Outage

IQC, BUTLER, PA 9/08/14 – 10/21/14

MT, PT, VISUAL WELD, VT 1,2,3, MECHANICAL

Cammanche Peak, Nuclear Plant, TX, Refuel Outage

LMT, GARDEN GROVE, CA 3/10/14 – 5/2/14

MT, PT VISUAL WELD

Wolf Creek, Nuclear Plant, KS, Pipe Replacement

URS/WASHINGTON GROUP, NJ 2/10/14 – 3/19/14

MT, PT, VISUAL WELD, VT 1,2,3, MECHANICAL

Grand Gulf, Nuclear Plant, MS, Refuel Outage

IQC, BULTER, PA 9/3/13 – 5/7/13

MT, PT, VISUAL WELD, VT 1,2,3

FT. Calhoun, Nuclear Plant, NE, Plant Startup

MISTRAS, SHARON HILLS 3/10/13 – 5/7/13

MT, PT, UTT, VISUAL WELD, VT 1,2,3

Susquahanna, Nuclear Plant, PA, Refuel Outage

URS/WASHINGTON GROUP, PRINCETON, NJ 2/21/12 – 3/24/12

MT, PT, VISUAL WELD, VT 1,2,3, MECHANICAL

Grand Gulf, Nuclear Plant, MS, Refuel Outage

URS/WASHINGTON GROUP, PRINCETON, NJ 9/11/12 – 12/7/12

MT, PT, VISUAL WELD, VT 1,2,3, MECHANICAL

Sequalya, Nuclear Plant Ten, SGR Outage

MISTRAS, SHARON HILLS 3/26/12 – 5/7/12

MT, PT, UTT, VISUAL WELD, VT 1,2,3

Susquhanna, Nuclear Plant, NE, Refuel Outage

ATLANTIC GROUP, GA 4/25/11 – 5/24/11

VT 1,2,3, MECHANICAL

Catawba, Nuclear Plant, NC, Refuel Outage

MISTRAS, SHARON HILLS, PA 3/19/11 – 4/21/11

MT, PT, VISUAL WELD, VT 1,2,3, UTT

Susquhanna, Nuclear plant, PA, Refuel Outage

BECHTEL, WESTOVER, MD 9/21/10 – 12/22/10

MT PT, VISUAL WELD, MECHANICAL

Songs, Nuclear Plant, CA, SGR Outage

URS/WASHINGTON GROUP, PRINCETON, NJ 4/26/10 – 5/20/10

MT, PT, VIXUAL WELD, VT 1,2,3

Grand Gulf, Nuclear Plant, MS, Refuel Outage

CONAM, SHARON HILLS, PA 2/9/10 – 4/18/10

MT, PT, VT 1,2,3, VISUAL WELD, UTT

Susquhanna, Nuclear Plant, PA, Refuel Outage

CONAM, HARTFORD, CT 8/3/09 – 12/22/09

MT, PT, RT ASSISTANT

Songs, Nuclear Plant, CA, SGR Outage

CONAM, SHARON HILLS, PA 3/2/09 – 5/11/09

MT, PT, VT 1,2,3, VISUAL WELD, UTT

Susquhanna, Nuclear Plant, PA, Refuel Outage

WASHINGTON GROUP PRINCETON 9/26/08 – 11/04/08

MT, PT, VT 1,3/ VISUAL WELD, MECHANICAL

Vermont Yankee, Nuclear Plant, VT, Refuel Outage

CONAM, SHARON HILLS, NJ 2/9/08 – 4/16/08

MT, PT, VT 1,2,3, VISUAL WELD, UTT

Susquhanna, Nuclear Plant, PA, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 1/2/08 – 2/2/08

MT, PT, VT 1,3, VISUAL WELD, MECHANICAL

Grand Gulf, Nuclear Plant, MS, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 9/4/07 – 12/10/07

MT, PT, VT 1,3, MECHANICAL

St. Lucie, Nuclear Plant, FL, SGR Outage

WASHINGTON GROUP, PRINCETON, NJ 4/22/07 – 5/25/07

MT, PT, VT 1,3, VISUAL WELD

Grand Gulf, Nuclear Plant, MS, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 3/18/07 – 3/28/07

MT, PT, VT 1,3, MECHANICAL

Riverbend, Nuclear Plant, LA, Refuel Outage

CONAM, SHARON HILLS, PA 2/11/07 – 3/6/07

MT, PT, VT 1,2,3, VISUAL WELD, UTT

Susquhanna, Nuclear Plant, PA, Refuel Outage

CONAM, SHARON HILLS, PA 8/22/06 – 12/15/06

MT, PT, UTT, RT ASSISTANT

Watts Bar, Nuclear Plant, CA, SGR Outage

CONAM, SHARON HILLS, PA 2/14/06 – 4/6/06

MT, PT, VT 1,2,3, VISUAL WELD, UTT

Susquhanna, Nuclear Plant, PA, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 9/2/05 – 11/12/05

MT, PT, VT 1,3, VISUAL WELD

St. Lucie, Nuclear Plant, FL, Head Replacement

WASHINGTON GROUP, PRINCETON, NJ 3/8/05 – 4/30/05

MT, PT, VT 1,3, MECHANICAL

Grand Gulf, Nuclear Plant, MS, Refuel Outage

CONAM, SHARON HILLS, PA 2/14/05 – 3/7/05

MT, PT, VT 1,3, VISUAL WELD, UTT

Susquhanna, Nuclear Plant, PA, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 9/13/04 – 11/12/04

MT, PT, VT 1,3

Waterford, Nuclear Plant, LA, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 4/19/04 – 4/30/04

MT, PT, VT, 1,3

Grand Gulf, Nuclear Plant, MS, Refuel Outage

CONAM, SHARON HILLS, NJ 2/13/04 – 4/5/04

MT, PT, VT 1,2,3, VISUAL WELD

Susquhanna, Nuclear Plant, PA, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 9/15/03 – 10/28/03

MT, PT, VT 1,2,3

Grand Gulf, Nuclear Plant, MS, Refuel Outage

CONAM, SHARON HILL 2/3/03 – 4/1/03

MT, PT, VT 1,2,3, UTT

Susquahanna, Nuclear Plant, PA, Refuel Outage

CONAM, GLENDALE HEIGHTS, IL 10/7/11 – 11/20/11

MT, PT, RT ASSISTANT

STP, Nuclear Plant, TX, SGR Outage

WASHINGTON GROUP, PRINCETON, NJ 9/7/02 – 10/1/02

MT, PT, VT 1

Waterford, Nuclear Plant, LA, Refuel Outage

WASHINGTON GROUP, PRINCETON, NJ 3/25/02 – 4/30/02

MT, PT

Ano, Nuclear Plant, AR, Turbin Work

CONAM, SHARON HILLS, PA 2/25/02 – 3/22/02

MT, PT, VISUAL 1,2,3, VISUAL WELD, UTT

Susquahanna, Nuclear Plant, PA, Refuel Outage

CONAM, GLENDALE HEIGHTS, IL 10/13/01 – 12/22/01

MT, PT, RT ASSISTANT

Sharon Harris, Nuclear Plant, NC, SGR Outage

SPEC, LYNCHBURG, VA 9/15/01 – 10/10/01

MT, PT

Sharon Harris, Nuclear Plant, NC, Turbin Inspector

NIC, FT MEYERS, FL 4/26/01 – 5/19/01

PT

Ocone Nuclear Plant, Head Repair

SPEC, LYNCHBURG, VA 10/16/00 – 11/10/00

MT, PT

Waterford, Nuclear Plant, Turbin Replacement

REINHART & ASSOCIATES, AUSTIN, TX 9/16/00 – 10/14/00

MT, PT

Turkey Point, Nuclear Plant, Turbin Replacement

NDT/WELD

NON NUCLEAR

WORK

MISTRAS, DECTOR, AL 9/21/10 – 10/25/11

MT, PT, UTT, VISUAL WELD

Dankin, Chemical Plant Outage

WASHINGTONG GROUP, PRINCETON, NJ 5/5/05 – 6/4/05

MT, PT, VISUAL WELD

Montour Power Plant, PA

PETRO CHEM, SHIPROCK, UT 3/1/01 – 3/20/01

MT, PT, UTT

Four Conner, Power Plant Outage

PETRO CHEM, HOLBROOK, AZ 2/15/01 – 2/28/01

MT, PT, UTT

Holbrook Power Plant, AZ

US INSPECTION, INDIANAPOLIS, IN 4/7/00 – 4/18/00

FLORESTANT MT, RT ASSISTANT

Dayton Lab

US INSPECTION, INDIANAPOLIS, IN 4/20/00 – 6/20/00

REAL TIME X-RAY

Franklin Casting Plant

MCKNIGHT TEASING LA 3/15/99 – 11/23/99

MT, PT, RT LEVEL 1

Shop, Local Area

QC LABS, ORLANDO, FL 6/20/90 – 3/25/91

MT, PT, RT ASSISTANT

Shop, Local Area

TOMAC NDT GARDEN GROVE, CA 3/15/87 – 11/22/88

MT, PT, UT, RT

Chevern & BP Refinery Turn Arounds

RICHARDSON X-RAY, ALHAMBRA, CA 10/05/87 – 2/26/88

MT, PT, RT

Edison Power Plants, & Local LA Area

UNITED PLATING WORKS, TULSA, OK 7/12/82 – 5/11/85

ZOGLOW, MT, PT

Aircraft Casting Lab



Contact this candidate