Post Job Free
Sign in

Electrical Engineer

Location:
Fresno, TX
Posted:
June 05, 2017

Contact this candidate

Resume:

KERRY L. BARNES

***** ****** ****** **.

Rosharon, TX. 77583

Contact-832-***-****

OBJECTIVE: Electrical Designer

SUMMARY OF EXPERIENCE:

I have over thirty years of experience working in the engineering business. I have twenty-five years in-house and six years of field experience. Regarding those years of experience, the most important milestone was receiving appreciation awards for outstanding performance while finishing under budget. My experience covers field surveying, and design of the following functions: motor schematics, loop diagrams, lighting, grounding; cable tray, power distribution, equipment layout, heat trace, communications and fire-gas detection system. I am recognized for my persistence, diligence and focus toward getting the job done and I enjoy my profession and the rewards gained from it.

EXPERIENCE

2014 Oct – 2016 Oct – Electrical Design Specialist: Fluor Daniel/Sugar Land, TX.

Function Design Telecommunication/SIS-DCS/FACP/PMS Distribution Systems Plant wide.

Create Fiber Optic Block Diagrams per systems and Distribution layouts displaying

redundancy and divergence.

Function Performs design assignments to the requirements of established practices and procedures.

Function Design methods of Fiber Optic distribution; whether it be by underground Duct Bank,

direct buried or cast in Trench.

Function Checks work of others for accuracy and completeness.

Function Work closely with Instrument Group in achieving my goals

Accomplishments-Create construction package of Telecommunication systems.

Accomplishment Provide detail drawings for equipment and conduit installation.

Accomplishment Attend training seminars.

Applications Auto-Cad/2014/ Excel

2013 Oct. – 2014 August - Electrical Discipline Lead/Pipeline Group: Worley Parsons/Bellaire, TX.

Function Provide resources for both Electrical and Instrumentation Teams, and assist each team

when resources are not available.

Function Provide Status Reports and Event Logs to ensure each project is staffed per Project

Management requirements.

Function Check all drawings per NEC, OSHA Standards, Practical Design, NEMA Standards and

Worley Parsons Standards.

Function Assist the design team in providing 2D Deliverables from PDS and PDMS Models

2010 June – 2013 Oct. – Principal Electrical Designer: CB&I/Houston, TX.

Function Create Electrical layouts, designs and calculations used in power, petrochemical or oil

and gas projects using CAD systems.

Function Performs design assignments on the most complex projects; requires adapting and

interpreting established practices and procedures.

Function Checks work of others for accuracy and completeness. Supports or participates as Lead

Designer.

Accomplishments-Designed construction package of Low and Medium Voltage Substations; to include

equipment layouts, interior cable tray, bus duct, internal power distribution and MTO’s.

Accomplishment Provide detail drawings for equipment and conduit installation.

Accomplishment Attend training seminars.

Applications Auto-Cad/2008, Microstation, PDS (3D Modeling software), Excel and IDOCS

2007 June – Oct. 2009 - Electrical Design Specialist: Fluor Daniel/Sugar Land, TX. LPP Office.

Function Create design package for all Main Substations.

Function Provide work duties and scheduling to Substation team members.

Accomplishments-Designed construction package of Medium Voltage Substations; to include equipment

layouts, interior cable tray, bus duct, internal power distribution and MTO’s.

Accomplishment--Provided Construction Packages several weeks before schedule dates.

Accomplishment Attend training seminars.

Applications Auto-Cad/2004, PDS (3D Modeling software) and Excel

2008 July – Dec. 2008 – Engineer Coordinator: Fluor Daniel/Sugar Land, TX. Sugar Creek Office.

Function Ensure communication continuity from the Houston Office between all disciplines in

addressing the needs and concerns of the project team and to attend weekly management

meetings. Acquire, communicate and provide data in supporting the efforts of each

discipline.

Accomplishment- A successful communicate between disciplines due to consistent coordinating efforts and

great team responsiveness.

Accomplishment Attend training seminars.

Field assignment- New Delhi, India (6 months)

2008 Feb.-July 2007 - Electrical Design Specialist: Fluor Daniel/Sugar Land, TX. LPP Office.

Function Create design package for all Main Substations.

Function Provide work duties and scheduling to Substation team members.

Accomplishments- Designed construction package of Medium Voltage Substations; to include equipment

layouts, interior cable tray, bus duct, internal power distribution and MTO’s.

Accomplishment-- Provided Construction Packages several weeks before schedule dates.

Accomplishment Attend training seminars.

Applications Auto-Cad/2004, PDS (3D Modeling software) and Excel

2006 August-Feb. 2008 - Sr. Physical Electrical Designer: Bechtel Intl. /Houston, TX.

Function Provide design assistance to design team. Check drawings to be issued to issued for

construction.

Accomplishments-- Ensured 2D drawing packages were complete for issuance of construction.

Applications Microstation, PDS (3D Modeling software) and Setroute (MTO software).

Field assignment -- Mumbai, India (6 months).

2004 September - Aug. 2006 - Sr. Electrical Designer: Jacobs Engineering/Houston Texas

Function Field survey and confirm panel termination availability, mark and modify existing

drawings for changes of retrofitting new equipment. Assign panel and circuits from

existing power sources for new equipment. Create electrical and instrument plan details

for cable tray, conduit and equipment.

Accomplishments- Designed power distribution via cable tray, underground and above ground conduit

routing for lighting, instrument power, metering skids and electrical equipment.

Created material take-offs and estimates to include drawing package for reconstruction

of as-builts.

Accomplishment Attend training seminars.

Accomplishment---Received Achievement Award for outstanding perfoemance.

Applications Auto-Cad 2000, Microstation SE and PDS-EE Raceway

Field assignments -Valero-Corpus Christi and Equistar/Channelview-Houston/La Porte

2002 June-2004 Aug. - Sr. Physical Electrical Designer: Dtech/Houston Texas

Function Create 2D drawing packages of electrical equipment layout, building lighting,

power, electrical details, cable tray, conduit routing and grounding.

Accomplishments-- Designed and issued drawing package under budget.

Application Microstation SE

2002 Feb–2002 June-Sr. Physical Electrical Designer: Stone & Webster/Denver, Colorado

Function Create 2D drawing packages of electrical equipment, building lighting, conduit layout,

electrical details, cable tray, grounding, and power.

Accomplishments- Issued complete design package on actual issue date.

Applications Microstation SE, PDS and Orthogen (2D drawing creator).

2001 April-2001 Dec-Sr. Physical Electrical Designer: Bechtel USA/Richland, Washington

Function Create 2D drawing packages of electrical equipment, building lighting, conduit layout,

electrical details, cable tray, grounding, and power.

Accomplishments - Issued complete design package on actual issue date.

Accomplishment Attend training seminars.

Applications Microstation SE, Triforma (3D Modeling software) and Setroute (MTO software).

2000 Jan-2001 April-Systems Sr. Physical Electrical Designer: Bechtel USA/Frederick, Maryland

Function Create 2D drawing packages of electrical equipment, building lighting, conduit layout,

electrical details, cable tray, grounding, and power.

Accomplishments - Issued complete design package one before actual issue date.

Accomplishments Awarded incentive bonus for outstanding performance.

Accomplishment Attend training seminars.

Applications AutoCad 2000, Microstation SE, 3DM (3D Modeling software) and Set Route (MTO

software).

1999 June-2000 Jan-Systems Sr. Electrical Designer: Bechtel USA/Houston,Texas

Function Create 2D drawing packages of electrical equipment, building lighting, conduit layout,

electrical details, cable tray, grounding, and power.

Accomplishments - Issued complete design package on actual issue date.

Accomplishments Awarded incentive bonus for outstanding performance.

Accomplishment Attend training seminars.

Applications AutoCad 2000, Microstation SE and PDSE (3D Modeling

software).

1998 Nov-1999 June-Sr. Electrical Designer: Kvaerner Consulting Group-Houston, Texas

Function Create 2D drawing packages of electrical equipment, building lighting, conduit layout,

electrical details, cable tray, grounding, and power.

Accomplishments Issued complete design package one week before issue date.

Application Auto-Cad 14.

1997 Nov-1998 Nov-Sr. Electrical Designer: Dow Chemical Company-Houston, Texas

Function Generate motor schematics and loop diagrams. Design cable tray routing,

communication, lighting, lightning protection, grounding, electrical details and material

take off.

Accomplishments - Designed in a 3Dmodel and design power distribution.

Applications Microstation SE and PASCE (3D Model software).

1996 Dec-1997 Nov-Sr. Electrical Designer: Fluor Daniel/Sugar Land, Texas

Function Generate motor schematics. Design Cable tray, Power distribution, Lighting,

Communications (Gaitronics), Electrical details and material take-off, input data

from schematics and loop diagrams in the “PSR” and “C.C.S” software package.

Accomplishment – Issued drawing package on issued date

Applications Microstation 5 and Auto-Cad 12.

1989 Jan-1996 Dec-Electrical Designer: Brown and Root, Inc. /Houston, Texas

Function Draft and assist in the design of cable tray, fire and gas detection system, lighting

fixtures, receptacles, switches, motor schematics, heat trace, equipment layout, electrical

details and material take-off.

Accomplishment - Design power distribution.

Applications Auto-Cad 12 and Microstation 5.

Field Assignment - Nekoosa Paper Mill, Texarkana, Texas- Modify drawings per field changes, verify

termination points and assist the Sr. Electrical Engineer and field personnel.

Field Assignment - Alfarat Petroleum Co., Alfarat, Syria- Modify drawings per field changes, verify

termination points, as-built drawings per retro-fit and assist the Sr. Electrical Engineer

and field personnel.

Education

Houston Community College Technology Center for Continued Education

A. Microstation 95-3D

B.PLC (Programmable Logic Controllers)

C.Basic Electrical Theory

D.Electrical design

Certificate-Architectural Drafting and Design, Houston, TX.

Horn Technology School, Houston, TX. 1978-1979

Military

Dates: Sep. 1973 / Sep. 1977 - Honorable

Branch: Army – Rank: Sgt./E5 – M.O.S. Combat Infantry

Accomplishments – Team Leader, Squad Leader, Acting Platoon Sgt.

and Company Human Relations Non-Commissioned

Officer

Function – To perform all duties and responsibilities as part of the team

and as a leader in accordance to the oath taken in

representing my Country.

Awards

Expert Infantry Badge – National Defense Service Metal

The Army Commendation Medal



Contact this candidate