RESUME: G William (Bill) Deetch; *** Duchess Drive, Marietta, GA 30066, 678-***-**** abqhly@r.postjobfree.com

SUMMARY OF BACKGROUND:

Project Management, Engineering, Construction, EH&S, Quality Assurance and Contracts relating to Commercial (AIA-CSI), Industrial, Process and Petro-Chemical, Chemical, Pulp and Paper, Waste Water, Power Plant and Telecommunications Construction. Experience in electrical, mechanical including ASME, ASTM, ASHRAE, SMACNA, ANSI, IEEE Standards and NEC, NFPA Codes, instrumentation, civil ACI and structural AISC field development of engineered and construction programs; business development, pre–job negotiations, environmental, estimating, specifications, cost planning, scheduling and labor relations; seasoned experience and effective applications with EH&S - OSHA 29CFR1910 and 1926; EPA – HAZMAT, HAZMAT & HAZCOM, requirements, QA/QC, NQA-1; test, checkout, startup, commissioning and Training; field O&M, CMMS, Maximo.

My main thrust being the field - Installation and Renovation of (EPC/CM) engineering, procurement, construction and construction management projects from conception to completion.

EXPERIENCE:

GWD & ASSOC - INDEPENDENT CONSTRUCTION MANAGEMENT, EH&S, EPA and QA/QC CONSULTANT

My Consulting FIELD ASSIGNMENTS (Since 06/02 – Present):

Contract- QA/QC Manager- Overseeing the Installation a FGD 1.5 acre Clear Water Basin / Retention pond with GCL and HDPE liners and HDPE pipe, Pumping station and Return Water Electrical building, Concrete structures, Duct Banks, Grounding, Access roads with 3rd Party inspectors and ITPs, RFIs, NCRs for SAIIA, Construction at GA Powers Plant Bowen near Cartersville, GA (04/12 – 5/12)

Contract- Q/C Engineer- Implemented client and contractors Corporate QA programs ASME, ANSI, AWS, IEEE, handled request for Information (RFIs) and Non Conformance reports (NCRs) during installation on a Combination 220KLB/20MW Ecofluid Bubbling Fluidized Bed Biomass Boiler: Fuel-Paper Products, BOP, SCR and Bag house for AE&E-Von Roll and Pratt Industries (P&P) Conyers, GA (08/08 – 12/08)

Contract- Startup Coordinator- Assisted the Startup Group, reviewing and updating the BOP SU testing procedures, SU schedule, SU turnover packages and SU gas blow procedures, for a 774MW (2–Unit WH Siemens 501Gs Combined Cycle (CC) at Hillabee Energy Center - Constellation Energy Alexander City, AL (06/08 – 08/08)

Contract- Expediter- as required by procurement and engineering, Vendor Surveillance and Reports, QC, Engineering and Construction Schedules for a Cement and Mineral EP CM Corporation - Polysius, Marietta, GA (11/07 – 06/08)

Contract- Project Superintendent- Finished installation of a 134K sq ft Office/Distribution / Freezer Warehouse / Facility (tilt up and insulted panel walls) with the assistance of 15 plus Subcontractors thru Certification of Occupancy for Preferred Freezer LLC, College Park, GA; (CM)- (construction Management) (Commercial) (06/07-10/07)

Contract- PCS Project Superintendent- Overseeing the HVAC - Mechanical, Electrical, Fire Protection and Interiors upgrade at a Wireless Carrier MSC (Mobile Switching Center) Verizon, Baton Rouge, LA (CM) (Commercial) (02/07 – 06/07)

Contract- Construction Site Manager- Supervised the construction (site and erection) of a 100 /230KV ABB / Duke Energy Beckerdite SVC (Static VAR Compensation) Substation, Winston – Salem, NC (CM) (09/06 – 02/07)

Contract- EH&S / Quality Control Engineer- Implemented Environmental Interiors, Inc and Marta Field Safety and Quality Control Programs; General EH&S provisions such as medical, inspections, investigations, audits, reporting, Toolbox training and OSHA 300 requirements. No record able injuries during project.

General Quality Control Provisions Such as material receiving and inspection reporting, tracking, Submittals, NCRs and preparatory phase. Follow through on a rehabilitation of an existing Metro Rapid Transit Station, Atlanta, GA (Commercial) (06/05 – 03/06)

Contract- Startup Coordinator– Assisted the Startup Group with BOP SU testing and procedures, turnover packages and gas and steam blow procedures, on a 1170MW (3-Unit MHI 501Gs X 3 HRSG, Steam Turbine, (CC) Combined Cycle at Covert Generating Facility - PG&E Covert, MI (07/02 – 10/02)

My Consulting Marietta FIELD SERVICES from Office (in between above assignments) (Since 06/02 - Present):

In between field assignments have been preparing for various companies (Engineering and Construction firms): Corporate Safety Programs and Site EH&S Plans, after completion of procedures, trained key personnel use of the policies to ensure basic understanding of the state of the art and OSHA 1910 and 1926 Safety and including EPA - HAZMAT, HAZWOPER, HAZCOM as required, same tasks performed on Corporate QA Programs and QC Site Plans including site instructing, (also a sample of one of the white papers is available review). Preparing Startup Test, Commissioning procedures and O & M Training Procedures.Prepared field EPC/CM Execution Plans, revised site Field Safety and QC Plans for biomass power projects – MS

G. William (Bill) Deetch Page Two

Continuation of Marietta FIELD SERVICES and Past EXPERIENCE to 05/02:

Pre construction & installation on commercial (federal) Chiller, Boiler and Cooling Tower Projects – FL, GA, SC, NC and TN. (C Mech)Design reviews on new and co-locate PCS Cell Sites – NE and SE. (L Eng)Prepared startup plans (BOP drafts) for (GE 6000’s (SC) and (GE 7-FA’s (CC) Sites – GA, AL and NV. (SE EPC)Marketing and business development for a Colorado Cooling Tower Manufacturer (installation and aftermarket) with the Utilities and Independent Power Producers. The main focus being with clients east of the Mississippi. (GEA)Assisted with Bid Proposals (installation) and Due Diligence Audits of Wind Farm and Solar Sites – (SE EPC)Bid Proposals (installation) Water Filtration Systems – GA and AI. Bid Proposals and Construct ability reviews (installation Of Combined Cycle (CC) GE 7- 7FA’s Sites – AL. Developing my own Safety Equipment Supply Company. http://gwdee.com/

EXPERIENCE:

SARGENT AND LUNDY LLC Kennerdell, PA and East Chicago, IL (2 Projects) (02/00 – 05/02)

Construction Manager- Oversaw staff, coordinated/facilitated (engineering and contractors) civil, structural, mechanical, BOP, substation, switch yard, startup and O&M turn over packages and training (Through first Fire) from conception to completion of a 350MW (8-unit, General Electric F- 6B Euros Simple Cycle (SC) Natural Gas-Fired Peaking Power Generating Project including substation for Exelon Calumet Power, East Chicago, IL.

Owners Representative- Completed project ahead of schedule despite highly adverse conditions and exceeded production goals on a 250MW (5-unit, Pratt & Whitney Tandem 8s Simple Cycle (SC) Natural Gas-Fired Peaking Power Generating Project, Including assisting TA representatives in checkout and startup of the Units and BOP, Substation for Handsome Lake energy Center Constellation Power, Kennerdell, PA.

Contracted to DYNEGY, INCORPORATED Houston, TX and Franklin, GA (03/00 - 12/00)

Site Representative- Initiated grassroots (conception thru Completion) field construction management thru startup and commissioning of a 495 MW (3-unit, Siemens Westinghouse 501Fs Gas-Fired Peaking Power Generating Facility (simple cycle (SC) combustion turbines, generators, auxiliary equipment systems, BOP, substation and switch yard – Third unit Set up for 1x1 Combined Cycle (CC) HRSG, Steam Turbine.

Contracted to GIFFELS TECHNOLOGIES, INC Southfield, MI and Marietta, GA (01/98 - 02/00)

Site Construction Manager- supervised the field construction of the project including its organization, planning, scheduling, within the budget and quality specified on a 40K plus sq ft, $14M F-22 Air Vehicle Integration Facility (Flight Simulation Building), (also refurbished and installed GE LM 6000 (SC) Unit (Never connected to the Grid) and coordinated between engineering and construction for owner, Lockheed Martin Aeronautical Systems, Marietta, GA, (Commercial).

Project Superintendent- Started renovation of an Existing 30K square foot, $8M Project for Automotive Acoustics (Sound) Laboratory for Sika Industries, Madison Heights, MI; and (CM) (Commercial).

Contracted to PRIMECO PERSONAL COMMUNICATIONS Itasca, IL; IN and MI (03/97 - 01/98)

PCS Safety/Project Manager- Safety audits, training, inspections and monitored Primeco field people, contractors and subcontractors from site acquisition thru installation on various types of (PCS) Cell Site installations (123 Build Outs and 1 new switching station in Itasca) in Northeast Illinois, Northwestern Indiana and Southwestern Michigan.

Contracted to- LOCKWOOD GREENE, INC Jacksonville FL and Brunswick, GA (02/96 - 02/97)

Resident Engineer- Collaborated between engineering and contractors to facilitate 3-phase capital construction project (mainly Mechanical, Electrical systems) expansion project, converting from Modicon controls to Allen-Bradley Flex I/O including a Waste-to-Energy Recovery boiler (Heat & Cooling Systems) for SCM Glidco Organics Brunswick, GA $22M Fragrance and Flavors Chemical Processing Plant.

Contracted to- FLUOR DANIEL Lordstown, OH (08/95 - 02/96)

Project Safety/ Facilities Engineer- Implemented GM’s Safety Program (compliance and training) for multi-industrial discipline constructors involved in renovation and modernization (Y97J Car Series) at the GM Lords town Assembly Plant. Facilities Engineer- Design, estimating, specifications, construction overseeing of renovation and modernization Capital Projects (Emergency Power Generation and Absorption Heat & Chilled Water Systems - (roof chillers air lifted) at the GM Lords town Assembly Plant.

OGDEN CISCO, INCORPORATED Jacksonville, FL and Various States (1992 – 1995)

General Manager- Directed Industrial Group in multiple tasks and oversight of EPC and C/M, Shut downs (Last Outage was Jacksonville Electrical Authority North side #3 BOP Mechanical Modifications, low NOx Burner installations, $1.2M), Outages/Plant Modifications / Operations and Maintenance Support Services, Staff Augmentation (Technical and Skilled Craft) – Including Turn Key Contracting in the Power Generation, Process, Manufacturing, Pulp and Paper, Water Treatment, PCS Cell Sites (168 sites, 3 carriers in the SE including a mobile switching Station) and other Industries. Florida contractor Licenses; CG, CB, CE and CM. Director of EH&S and Quality Assurance- Developed and implementation of OCI’s Corporate Safety and Quality Assurance Programs, Site Safety Plans, Handbooks and Field QC Plans (training, auditing and surveillance) and managed and controlled OCI’s ASME Code stamps R, U, S and PP.

G. William (Bill) Deetch Page Three

Contracted to LOCKHEED MISSILES AND SPACE COMPANY Luka, MS (1992 – 1992) Facilities Project Engineer- NASA’s Advanced Solid Rocket Motor Facility. Construction and maintenance contracts on the 42 buildings, barge unloading facility (USACE), (GE LM 2500’s (SC) and combined cycle (GE LM6000’s (CC) power plants (HRSGs).

Contracted to PUBLIC SERVICE INDIANA ENERGY Site Construction Supervisor - Oversaw dismantling and installation, checkout, startup of $11M Electrostatic Precipitator, ID and FD Fans and associated Exhaust Flue duct Systems, for existing Wabash I through VI Re powering Fossil Power Projects.

Contracted to BABCOCK & WILCOX Construction Manager – Engineering, (Contracts), construction $200M EP C/M contract for a 45MW Chemical-Recovery Recovery boiler, (BOP, evaporators and cooling systems) including Testing, Checkout, Startup and O&M training for a Recovery Island Cogeneration Facility at James River Naheola Mill.

PROCTER & GAMBLE CELLULOSE Contract- Quality Control Engineer- QC Procedures, P&G’s Technical Specifications, prepared surveillance / inspection plans and developed QC procedures, performed surveillance, NCRs, audit of P&G’s and contractors QC systems and construction inspection, P&Gs new CMMS and existing Maximo programs, verified vendor drawing procedures. Project Engineer– Renovation and start-up of TRS and R8 modernization Capital Projects and the rebuild of a Smelter Type Recovery Boiler and BOP systems including startup at a 1200-ton per day Pulp Mill.

Contracted to FLUOR DANIEL Facilities Engineer- Design, estimates, specifications for construct ability and preventative/predictive maintenance programs on Capital expansion Projects for DuPont (Delta Projects Nylon) Fiber and Polymer Facilities.

Contracted to UNC RECLAMATION Construction Manager- Responsible for dismantling of Uranium Recovery site and construction and Startup of Chemical Solvent Extraction (crystals and heavy metals) Plant in compliance with state and federal effluent and emission regulations and a Heat Recovery conversion of a Universal Pressure Boiler.

Contracted to GASSER ASSOCIATES Startup Manager- Assumed completion and startup leadership of behind-schedule, recovered time deficit and met original project completion dates (renovation and expansion) on a Water Filtration and Treatment Project.

Contracted to BEVERLY CONSTRUCTION AND ENGINEERING, INC Construction Manager- Negotiated a WBE claim with the USACE and construction completion, Start-up of a Water Treatment and Pumping Station Project, associated with of the USACE Earth Dam Project, (Commercial).

Contracted to GIBBS & HILL, INC Nuclear Safety Engineer- Oversee (training, audit and monitor) two (2) prime and seven (7) subcontractors, compliance with NRC Safety Procedures and TECOs Safety Program on Comanche Peak Nuclear Power Plants.

Contracted to PULLMAN POWER PRODUCTS INC Nuclear Area Mechanical Superintendent- Installation of seismic and rupture restrains, hangers and all BOP, mechanical and piping systems including and startup per NRC Appendix R on Diablo Canyon I and II Nuclear Power Plants, (annual Union craft labor Contract).

Contracted to CONTINENTAL MECHANICAL INC Project Superintendent- Supervised the electrical and mechanical completion, start-up and operational acceptance of a PCL 52-story Office Tower and Tenant Complex. (Commercial).

Contracted to S & Q CORPORATION Project Superintendent / Contract Administrator- Completion, start-up, O&M training of a Waste Water Treatment/Sludge Processing Facility (Pigs Eye) including nine (9) Incinerators (sludge) and three (3) B&W Sterling Type boilers (waste recovery) for Metropolitan Waste Control Commission (Pigs Eye), CM venture.

Contracted to VIRGINIA ELECTRIC Project Engineer / Estimator- Conceptual, detail estimates and renovation of (8) Oil to Coal Conversion fossil Power Plants and (NRC Appendix R Mod Packages) Surry I and North Anne II Nuclear Plants.

G. William (Bill) Deetch Page four

Contracted to ALLIED CHEMICALConstruction Project Engineer- Capital Projects including design, estimating, specifications construction and maintenance of various projects two (2) Nylon Fiber and Polymer Facilities.

Contracted to B.E. & K INCORPORATED Field Coordinator-Electrical and mechanical field engineering and construction on a one (1) 35MW Combination Power Plant; tie-ins and renovation of one 10/20MW Combination Power Plants and 1000 ton per day Paper Machine.

Contracted to PARSONS/GILBANE Projects Manager- Strategic Petroleum Reserve Project for U.S. Department of Energy

Contracted to BRYANT ELECTRIC, INC Project Superintendent- Supervised the electrical and instrumentation of Alabama River P & P Mill.

E. C. ERNST, INC Nuclear Projects Manager / Power Div. VP- E and I, (annual Union labor contracts) Hatch I & II Nuclear Power Plants, Same Duties performed Briarwood I and Bryon I Nuclear Power Plants. Project Superintendent- Assigned to Cardinal I Fossil Power Plant. (Corp. went to Chapter 11 to 13).

BECHTEL POWER CORPORATION Superintendent and Contract Administrator- Two 600MW units, (CM) Fossil Power Plants. Nuclear Piping Superintendent- Assigned Arkansas I (Appendix R Mods) Nuclear Power Plant.

Contracted to BECHTEL POWER CORPORATION



Contact this candidate