Post Job Free
Sign in

Project Technician

Location:
Spokane, WA
Posted:
October 14, 2012

Contact this candidate

Resume:

Posted/Modified

on: **/**/**** **:** PDT

Title:

Susan Werner Primavera Scheduler

e-mail:

aboy22@r.postjobfree.com

Phone:

509-***-****

Industry:

Nuclear

Desired

Location:

US

Willing

to Relocate:

Yes

Desired

Salary:

$46/hr - $60/hr

Susan Werner

Primavera Planner/Scheduler

Project Controls Specialist, Project Coordinator

4411 Hilltop Dr.

Pasco, WA 99301

509-***-**** Home

509-***-**** Cell

aboy22@r.postjobfree.com

Summary of Qualifications

5 years of professional experience as a Planner/Scheduler in Nuclear Industries. Technical proficiency and certification?s in Primavera P3, P5, P6. Proficient in MS Project/MS Suite programs.

15 years in field experience in nuclear projects, construction and research.

Area of Expertise

Planning/Scheduling, Project Risk Analysis and Management, Earned Value Analysis,

Proposal and Budget Preparation, Performance Analysis, Cost and Progress Reporting, Reactor Systems, Regulatory and Procedural Compliance, Organizing and maintaining communication with subject matter experts and owners.

Work Summary

April 2009 to April 2011, Hanford Nuclear Reservation Proposal and Project Teams Scheduler

? Created proposal, long range plan and project team schedules for numerous projects prior to award of 365M in American Recovery Act contracts.

? Plan and schedule projects including Nuclear Waste Evaporator process runs and maintenance, tank farm waste transfers, engineering proposals, corrective and planned maintenance.

? Lead integration of engineering, procurement, and construction schedules.

? Analyzed schedules for required maintenance, facility availability, resource allocation, production gaps and cost over-runs.

? Maintained daily status for large projects, while creating new, detailed work breakdown schedules for future projects from engineering change reports.

? Provided detailed cost/performance for monthly Earned Value reporting.

? Mentored junior staff in P6 Scheduling

? Coordinate revision of out-year budget estimates.

June 2008 to March 2009, Energy-Northwest Radiation Protection Schedule and Budget Coordinator

? Plan, schedule and coordinate projects, work order packages, and resources. Track, analyze and update active schedules.

? Provided schedule analysis, recommendations and reports for schedule risk, critical path, man power and costs.

? Developed and maintained plans/schedules for planned and unplanned outages.

? Reviewed all plant work scope for Health Physics and Laborer resource allocation.

? Managed HP, ALARA and Labor department integration in weekly T-12 through T-1 schedule development.

? Prepare, submit and manage department budgets, contracts and purchase requisitions.

January 2008 to June 2008 Energy-Northwest Contract Outage Scheduler

? Development of outage schedules for Electrical Upgrade Project, Health Physics, ALARA and Laborer departments.

? Led vertical slice reviews to incorporate project, site and system requirements for integrated schedule.

? P5 to P6 transition preparation and implementation.

February 2007 to November 2007 Three Mile Island 1 Contract Outage Scheduler

? Planning/scheduling of reactor penetration replacement, Instrument & Controls department, LLRT?s, Radiation Protection, Insulators and Painters.

? Scheduling and continuing oversight of Reactor Sampling, In Core Detectors, Nuclear Instrumentation, and Reactor Protection Systems.

? Developed and maintained schedule man loading.

? Provided histogram, schedule variance, critical path and special request reports.

? Auditing of schedule for compliance and integration of required Surveillances and PM?s.

April 1989 through January 2004 DOE & NRC RCT/HPT

? Nine years Battelle Northwest Laboratories Radiation Control Technician. Providing Radiological and Health and Safety planning, oversight and compliance for DOE and DOD research projects, building and systems modifications and nuclear facility demolitions.

? Two years University of Cincinnati Health Physics Technician. Planning and oversight of research and experimental medical application of isotopes.

? One year Fernald Environmental Restoration Radiation Control Technician. Site and facility environmental recovery.

? Four years NRC contract Health Physics Technician. Refuel and Steam Generator Replacement Outages providing radiological planning and in field oversight for steam generator replacement, reactor coolant pump replacement, reactor sump replacement, aux building modifications, pressurizer maintenance, spent resin storage, fuel transfers, and numerous maintenance and modification activities at Salem I & II, Hope Creek, Palisades, Limerick, ANO I & II, and Cooper Nuclear Generating Stations.

Education and Training

Primavera P3, P5, P6 Certifications.

Nuclear Technology, Columbia Basin College, Pasco, WA.

Sr. Radiation Control Technician, DOE.

Sr. Health Physics Technician, NRC Commercial and Broad Scope (Medical).

Extensive training in fissile material storage, hazardous materials handling, emergency event management, bio-hazards,

asbestos, beryllium, radiation, electrical and OSHA safety regulations.

References provided on request.

aboy22@r.postjobfree.com

Copyright © 2003-2005 Cooper Pugeda Management, Inc. All rigths reser



Contact this candidate