Sachin Kisan Wadkar
M.H.B. Colony, Bandra (E),
Mumbai-400 051.
Sir,
My CV is enclosed along with this letter. Just for a quick overview
I would like to bring into picture, my Sixteen Years of Oil & Gas
experience. I am working for BJ Services,wetherford and Halliburton.
Bio-Data
Post of Applied for : Pipeline processing tech / Mechanical
Technician /Operator-II / PPS
Name : Sachin Kisan Wadkar
Address : 33/1801, Kher Nagar, M.H.B. Colony,
Bandra (E), Mumbai-400 051.
Telephone No. : C/o. 24114336, Mob: 998-***-****,
Qatar: +974********
Email ID : aboazn@r.postjobfree.com
Date of Birth : September 25th 1963
Religion : Christian
Nationality : Indian
Languages Known : English, Hindi, Arabic
Marital Status : Married
Passport : Z-2473371(Ecnr)
Place of Issue : India (Mumbai)
Date of Issue : 27/12/2012
Valid Upto : 26/12/2022
Academic Qualification : S.S.C. (First Class)
Technical Qualification : Diploma in M. Mechanic
1 Reliance East West Gas : Post: Operator-II, PPS
Pipeline Project,India All major Pipeline Sizes,
Weatherford. are operating 8-in to
56-in.
1.Pipeline pigging operations
2.Vacuum drying operations
3.HP Air compressor(caterpillar)
& air drier maintenance.
2. Sangachal Terminal : Post:Pipeline Operating II Mechanical
In Baku, British Petroleum Technician
Project (B P Project) BJ 1.Pipeline Pigging operations(rig up &
Services Oil and Gas rig
Plant Down activities)
In Azerbijan 2. Chemical Cleaning, Nitrogen Perching
(12/02/2006to25/06/2006) & Pressurized, Circulator Maintenance.
3. Pipe Fitter, Hydro Bolt Titing,
Boiler Tech. Hydro Testing.
4. Air Dryer, Diesel Engine
Maintenance, Air Compressor Operation.
3. Weatherford Pipeline & : Post: Pipeline Operating II Technician
Speciality Service in 1. Working Process and Pipeline
India. Oil and Gas Plant. Division.
(24/02/2008to24/05/2008)
2. I.R. and Solar Air Compressor,
Hankinson Dryer, Maintain and
Operating, Hydro Testing, Air
Compressor Operation.
3. Pipe Line Processing, Pigging,
Bi-di, Brush, Magnet, Caliper Tool,
Foam Pig, Launcher and Receiver,
Dewatering- Swabbing, Hydro Testing.
4. Vacuum Drying Job Drain.
4. B.J Services Pipeline : Post : Pipe Line Processing Technician
Processing Services in,operatorII
Qatar base 1. Nitrogen Pump Tech.
(Day Rate) 2. Booster Maintenance
(15/06/2009to18/08/2009) 3. Helium Pump Tech., Air drying, Leak
5. : Testing
Completion of Short Term Post: Static equipment & mechanic
with Manai Engineering Technician Process.
Company Gulf 1. Work Permit prepare Hot & Cold
Petrochemical Industries 2. Worked on gear box overhauling
Co. In Manama, Bahrain. 3. Air Drying
Oil and Gas Plant. 4. Type of elbows with 45d, 90d, 180d
(31/10/2000to20/11/2000)
5. Type of Plugs & Flanges, Blind
Flange, Welden Cap, Concentric Reducer,
Eccentric Reducer, Hydro Testing,
6. Integral Service : Post: Pipeline OperatingII Mechanical
Industrial Suppliers & Technician
Contractors in Kuwait Pressure Testing.
(K.N.P.C.) Oil and Gas 1. Worked on Overhauling tower & heat
Plant. exchanger etc Hydro Testing.
(25/01/1995to30/11/1999) 2. Worked on straight tubes exchange LT
tubes exchanger, floating heat type
Exchanger hydro bolt tightening.
3. Dismantling of valves, safety, Gate
Globe, Check, butterfly valves etc,
Air Drying.
4. Pipe line Blinding De-spading work.
5. Worked on generator engine &
welding. Machine, Diesel Engine &
pipeline pressure testing vacuum drying
repaired equipment, Hydro Testing.
6. Type of elbows with 45d, 90d,180d
7. Type of Plugs & Flanges, Blind
Flange, Welden Cap, Concentrate
Reducer, Eccentric Reducer, Hydro
Testing.
7. Completion of Short Term : Post: Pipeline OperatingII Mechanical
Contract With Costain Technician
Abu-Dhabi Company of 1. Worked on heat exchanger,
ADGAS Oil and Gas Plant re-assembly hydro testing, Air
(25/03/2001to09/05/2001) Compressor Operation Pipeline Drying.
2. Pipeline blinding, de-spanding work
3. Fitting of gate, safety, globe
valves.
4. Major plant shutdown maintains work.
5. Worked on overhauling towers
trays, fin fan coolers. Eccentric
Reducer & Concentric Reducer, Hydro
Testing
6. Type of elbows with 45d, 90d,180d
7. Type of Plugs & Flanges, Blind
Flange, Welden Cap, Concentric Reducer,
Eccentric Reducer, Hydro Testing.
8. Almuftah Company : Post: Pipeline OperatingII Mechanical
Doha-Qutar Gult, Q.G.P.C. Technician
Oil and Gas Plant. Air Drying Pipeline Pressure Testing.
(27/04/2004to29/05/2004) 1. Safety Valve, Relief Valve, Orbit
Valve, Seat Lapping, Valve Hydro
Testing. Actuator Fitting, Valve
Testing.
9. Completion of Short : Post: Pipeline OperatingII Mechanical
Contract with company Technician
stain Abu Dhabi, Company Air Drying Pipeline Pressure Testing.
for ADGAS Oil and Gas 1. Fitting of gauge, globe, safety.
Plant. 2. Worked on heat exchangers
(12/03/2002to09/05/2002) re-assembly, Air compressor
Operation.
3. Hydro bold tensioning.
4. Worked on overhauling L.P.
compressor, H.P. Compressor All Type
Pipe Fitting Job, Air Compressor
Operation, Pipeline Pressure testing.
5. Type of elbows with 45d, 90d,180d
6. Type of Plugs & Flanges, Blind
Flange, Welden Cap, Concentric Reducer,
Eccentric Reducer, Air Compressor
Operation.
10. Nodco Refinery, Shut : Post: Pipeline OperatingII Mechanical
Down, In Qatar, Technician
Fertilizer Company Oil and Pipeline Pressure testing, Vaccum
Gas Plant. Drying.
(28/08/2001to01/10/2001) 1. General Plant pipe fitter. Gasket
of Different Type Metal Gasket,
Asbestoses.
11. Completion of Short Term Process
Contract with Costain Abu Post: Pipeline OperatingII Mechanical
Dhabi, company for Bundua Technician
Plant. ADMA-OPCO Gas Plant 1. Worked all types of valves fittings,
safety, relief, globe, plug,
(27/12/2001to20/02/2002) butterfly, ball, valves, Hydro Testing,
Dewatering,
:
2. Heat exchanger re-assemble, Hydro
testing, V' tube exchange, straight
tube exchanger, Hydro Testing Pipeline
Pressure Testing.
3. Pipe fitting work, Hydro Testing
4. Type of elbows with 45d, 90d,180d
5. Type of Plugs & Flanges, Blind
Flange, Welden Cap, Concentric Reducer,
Eccentric Reducer, Air Compressor
Operation.
12. Olyan Discon In Saudi : Post: Pipeline OperatingII Mechanical
Arabia Company, Oil and Technician
Gas Plant Pipeline Testing, Air Drying
(06/06/2003to30/09/2003)
1. Safety, Relief, Plug Valve, Gate
Valve, Orbit Valve, Hydro Testing.
2. Seat Lapping, Actuator Disc Fitting,
Valve Hydro Testing.
13. Euro Mechanical Company : Post: Pipeline OperatingII Mechanical
Wood Group, Gasco Habshan Technician
(Abu Dhabi), Oil and Gas 1. Safety Valve, Relief Orbit Valve,
Plant Check Valve, Air Compressor Operation.
(10/10/2007to07/12/2007)
2. Valve Stripping and Assemble Valve
Hydro Testing, Valve Fitting Actuator
Assemble, Air Compressor Operation.
3. Type of elbows with 45d, 90d, 180d
4. Type of Plugs & Flanges, Blind
Flange, Welden Cap, Concentric Reducer,
Eccentric Reducer, Air Compressor
Operation.
14. Manweir Company Maersk Oil : Post: Pipeline OperatingII Mechanical
Offshore in Doha Quatar. Technician
Oil and Gas Plant Pipeline Testing, Air Drying.
(07/12/2004to16/01/2005) 1. Chock many fold, Christmas All type
of Pipe Fitting Tree, Denhill Valve,
Separator, P.O.P. Valve, Safety Valve,
Ball Valve, Hydro Testing, Air
Compressor Operation.
15. Doha Petroleum Const. Co. : Post: Pipeline OperatingII Mechanical
Client: Qatar Petroleum, Technician
Oil and Gas Plant. Air Drying, Pipeline Pressure Testing.
(13/11/2005to09/12/2005) 1. Shutdown Maintenance work at
Fahahil North Gas Lift Compressor
Station, Hydro Testing Pipeline
Operator, Air Drying.
2. Valve Technician, Hydro Testing
16. Euro Mechanical Company : Post: Pipeline Technician
Wood Group, Gasco Habshan 1. Safety Valve, Relief Valve, Orbit
(Abu Dhabi) UAE, Oil and Valve Check Valve, Overhauling Pump &
Gas Plant Compressor
(15/10/2006to07/01/2007) 2. Valve Stripping and Assemble
Valve Hydro Testing, Valve Fitting,
Actuator Assemble, Hydro Testing, Air
Compressor Operation, Air Drying.
17. Halliburton co pps in : Post: OperatorII pps
Qatar in shell in CHIYODA Nitrogen leaktest,chemical job and
HYUNDAI-PEARL GTL Pigging job done and rig up and rig
(26/o9/2012to22/11/2012) Down.
Pipe Fitting, Valve Fitting, Spading
De-spading, Vessel Work.
18. Gpi Gpic & bapco Oil and : Post: Pipeline OperatingII Mechanical
Gas plant Plant in Technician
Bahrain Pipeline Pressure testing, Vacuum
(26/09/2011to22/11/2012) Drying.
General Plant pipe fitter. Gasket of
Different Type Metal Gasket,
Asbestoses. Nitrogen Perching
Working process and pipeline division.
. National Academy for Professional Training
. Completed H2S, Fire Fighting, First Aid (Dubai &Qatar)
. Hydrogen Sulphide/Breathing Apparatus (H2S/BA) Training
Certificate Qatar Petroleum.
1) Familiar with work permit requirements & plant safety requirement.
2) Electric Welding.
3) Gas Cutting.
1.Heavy Motor Vehicle. D.I.
87/W/40964
2. Forklift Operator
I hereby state that the above informations are true to the best of my
knowledge.
(Sachin Kisan Wadkar)