Post Job Free
Sign in

Technician Plant

Location:
Mumbai, MH, India
Salary:
nigosebal
Posted:
February 09, 2013

Contact this candidate

Resume:

Sachin Kisan Wadkar

**/****, **** *****,

M.H.B. Colony, Bandra (E),

Mumbai-400 051.

Sir,

My CV is enclosed along with this letter. Just for a quick overview

I would like to bring into picture, my Sixteen Years of Oil & Gas

experience. I am working for BJ Services,wetherford and Halliburton.

Bio-Data

Post of Applied for : Pipeline processing tech / Mechanical

Technician /Operator-II / PPS

Name : Sachin Kisan Wadkar

Address : 33/1801, Kher Nagar, M.H.B. Colony,

Bandra (E), Mumbai-400 051.

Telephone No. : C/o. 24114336, Mob: 998-***-****,

Qatar: +974********

Email ID : aboazn@r.postjobfree.com

Date of Birth : September 25th 1963

Religion : Christian

Nationality : Indian

Languages Known : English, Hindi, Arabic

Marital Status : Married

Passport : Z-2473371(Ecnr)

Place of Issue : India (Mumbai)

Date of Issue : 27/12/2012

Valid Upto : 26/12/2022

Academic Qualification : S.S.C. (First Class)

Technical Qualification : Diploma in M. Mechanic

1 Reliance East West Gas : Post: Operator-II, PPS

Pipeline Project,India All major Pipeline Sizes,

Weatherford. are operating 8-in to

56-in.

1.Pipeline pigging operations

2.Vacuum drying operations

3.HP Air compressor(caterpillar)

& air drier maintenance.

2. Sangachal Terminal : Post:Pipeline Operating II Mechanical

In Baku, British Petroleum Technician

Project (B P Project) BJ 1.Pipeline Pigging operations(rig up &

Services Oil and Gas rig

Plant Down activities)

In Azerbijan 2. Chemical Cleaning, Nitrogen Perching

(12/02/2006to25/06/2006) & Pressurized, Circulator Maintenance.

3. Pipe Fitter, Hydro Bolt Titing,

Boiler Tech. Hydro Testing.

4. Air Dryer, Diesel Engine

Maintenance, Air Compressor Operation.

3. Weatherford Pipeline & : Post: Pipeline Operating II Technician

Speciality Service in 1. Working Process and Pipeline

India. Oil and Gas Plant. Division.

(24/02/2008to24/05/2008)

2. I.R. and Solar Air Compressor,

Hankinson Dryer, Maintain and

Operating, Hydro Testing, Air

Compressor Operation.

3. Pipe Line Processing, Pigging,

Bi-di, Brush, Magnet, Caliper Tool,

Foam Pig, Launcher and Receiver,

Dewatering- Swabbing, Hydro Testing.

4. Vacuum Drying Job Drain.

4. B.J Services Pipeline : Post : Pipe Line Processing Technician

Processing Services in,operatorII

Qatar base 1. Nitrogen Pump Tech.

(Day Rate) 2. Booster Maintenance

(15/06/2009to18/08/2009) 3. Helium Pump Tech., Air drying, Leak

5. : Testing

Completion of Short Term Post: Static equipment & mechanic

with Manai Engineering Technician Process.

Company Gulf 1. Work Permit prepare Hot & Cold

Petrochemical Industries 2. Worked on gear box overhauling

Co. In Manama, Bahrain. 3. Air Drying

Oil and Gas Plant. 4. Type of elbows with 45d, 90d, 180d

(31/10/2000to20/11/2000)

5. Type of Plugs & Flanges, Blind

Flange, Welden Cap, Concentric Reducer,

Eccentric Reducer, Hydro Testing,

6. Integral Service : Post: Pipeline OperatingII Mechanical

Industrial Suppliers & Technician

Contractors in Kuwait Pressure Testing.

(K.N.P.C.) Oil and Gas 1. Worked on Overhauling tower & heat

Plant. exchanger etc Hydro Testing.

(25/01/1995to30/11/1999) 2. Worked on straight tubes exchange LT

tubes exchanger, floating heat type

Exchanger hydro bolt tightening.

3. Dismantling of valves, safety, Gate

Globe, Check, butterfly valves etc,

Air Drying.

4. Pipe line Blinding De-spading work.

5. Worked on generator engine &

welding. Machine, Diesel Engine &

pipeline pressure testing vacuum drying

repaired equipment, Hydro Testing.

6. Type of elbows with 45d, 90d,180d

7. Type of Plugs & Flanges, Blind

Flange, Welden Cap, Concentrate

Reducer, Eccentric Reducer, Hydro

Testing.

7. Completion of Short Term : Post: Pipeline OperatingII Mechanical

Contract With Costain Technician

Abu-Dhabi Company of 1. Worked on heat exchanger,

ADGAS Oil and Gas Plant re-assembly hydro testing, Air

(25/03/2001to09/05/2001) Compressor Operation Pipeline Drying.

2. Pipeline blinding, de-spanding work

3. Fitting of gate, safety, globe

valves.

4. Major plant shutdown maintains work.

5. Worked on overhauling towers

trays, fin fan coolers. Eccentric

Reducer & Concentric Reducer, Hydro

Testing

6. Type of elbows with 45d, 90d,180d

7. Type of Plugs & Flanges, Blind

Flange, Welden Cap, Concentric Reducer,

Eccentric Reducer, Hydro Testing.

8. Almuftah Company : Post: Pipeline OperatingII Mechanical

Doha-Qutar Gult, Q.G.P.C. Technician

Oil and Gas Plant. Air Drying Pipeline Pressure Testing.

(27/04/2004to29/05/2004) 1. Safety Valve, Relief Valve, Orbit

Valve, Seat Lapping, Valve Hydro

Testing. Actuator Fitting, Valve

Testing.

9. Completion of Short : Post: Pipeline OperatingII Mechanical

Contract with company Technician

stain Abu Dhabi, Company Air Drying Pipeline Pressure Testing.

for ADGAS Oil and Gas 1. Fitting of gauge, globe, safety.

Plant. 2. Worked on heat exchangers

(12/03/2002to09/05/2002) re-assembly, Air compressor

Operation.

3. Hydro bold tensioning.

4. Worked on overhauling L.P.

compressor, H.P. Compressor All Type

Pipe Fitting Job, Air Compressor

Operation, Pipeline Pressure testing.

5. Type of elbows with 45d, 90d,180d

6. Type of Plugs & Flanges, Blind

Flange, Welden Cap, Concentric Reducer,

Eccentric Reducer, Air Compressor

Operation.

10. Nodco Refinery, Shut : Post: Pipeline OperatingII Mechanical

Down, In Qatar, Technician

Fertilizer Company Oil and Pipeline Pressure testing, Vaccum

Gas Plant. Drying.

(28/08/2001to01/10/2001) 1. General Plant pipe fitter. Gasket

of Different Type Metal Gasket,

Asbestoses.

11. Completion of Short Term Process

Contract with Costain Abu Post: Pipeline OperatingII Mechanical

Dhabi, company for Bundua Technician

Plant. ADMA-OPCO Gas Plant 1. Worked all types of valves fittings,

safety, relief, globe, plug,

(27/12/2001to20/02/2002) butterfly, ball, valves, Hydro Testing,

Dewatering,

:

2. Heat exchanger re-assemble, Hydro

testing, V' tube exchange, straight

tube exchanger, Hydro Testing Pipeline

Pressure Testing.

3. Pipe fitting work, Hydro Testing

4. Type of elbows with 45d, 90d,180d

5. Type of Plugs & Flanges, Blind

Flange, Welden Cap, Concentric Reducer,

Eccentric Reducer, Air Compressor

Operation.

12. Olyan Discon In Saudi : Post: Pipeline OperatingII Mechanical

Arabia Company, Oil and Technician

Gas Plant Pipeline Testing, Air Drying

(06/06/2003to30/09/2003)

1. Safety, Relief, Plug Valve, Gate

Valve, Orbit Valve, Hydro Testing.

2. Seat Lapping, Actuator Disc Fitting,

Valve Hydro Testing.

13. Euro Mechanical Company : Post: Pipeline OperatingII Mechanical

Wood Group, Gasco Habshan Technician

(Abu Dhabi), Oil and Gas 1. Safety Valve, Relief Orbit Valve,

Plant Check Valve, Air Compressor Operation.

(10/10/2007to07/12/2007)

2. Valve Stripping and Assemble Valve

Hydro Testing, Valve Fitting Actuator

Assemble, Air Compressor Operation.

3. Type of elbows with 45d, 90d, 180d

4. Type of Plugs & Flanges, Blind

Flange, Welden Cap, Concentric Reducer,

Eccentric Reducer, Air Compressor

Operation.

14. Manweir Company Maersk Oil : Post: Pipeline OperatingII Mechanical

Offshore in Doha Quatar. Technician

Oil and Gas Plant Pipeline Testing, Air Drying.

(07/12/2004to16/01/2005) 1. Chock many fold, Christmas All type

of Pipe Fitting Tree, Denhill Valve,

Separator, P.O.P. Valve, Safety Valve,

Ball Valve, Hydro Testing, Air

Compressor Operation.

15. Doha Petroleum Const. Co. : Post: Pipeline OperatingII Mechanical

Client: Qatar Petroleum, Technician

Oil and Gas Plant. Air Drying, Pipeline Pressure Testing.

(13/11/2005to09/12/2005) 1. Shutdown Maintenance work at

Fahahil North Gas Lift Compressor

Station, Hydro Testing Pipeline

Operator, Air Drying.

2. Valve Technician, Hydro Testing

16. Euro Mechanical Company : Post: Pipeline Technician

Wood Group, Gasco Habshan 1. Safety Valve, Relief Valve, Orbit

(Abu Dhabi) UAE, Oil and Valve Check Valve, Overhauling Pump &

Gas Plant Compressor

(15/10/2006to07/01/2007) 2. Valve Stripping and Assemble

Valve Hydro Testing, Valve Fitting,

Actuator Assemble, Hydro Testing, Air

Compressor Operation, Air Drying.

17. Halliburton co pps in : Post: OperatorII pps

Qatar in shell in CHIYODA Nitrogen leaktest,chemical job and

HYUNDAI-PEARL GTL Pigging job done and rig up and rig

(26/o9/2012to22/11/2012) Down.

Pipe Fitting, Valve Fitting, Spading

De-spading, Vessel Work.

18. Gpi Gpic & bapco Oil and : Post: Pipeline OperatingII Mechanical

Gas plant Plant in Technician

Bahrain Pipeline Pressure testing, Vacuum

(26/09/2011to22/11/2012) Drying.

General Plant pipe fitter. Gasket of

Different Type Metal Gasket,

Asbestoses. Nitrogen Perching

Working process and pipeline division.

. National Academy for Professional Training

. Completed H2S, Fire Fighting, First Aid (Dubai &Qatar)

. Hydrogen Sulphide/Breathing Apparatus (H2S/BA) Training

Certificate Qatar Petroleum.

1) Familiar with work permit requirements & plant safety requirement.

2) Electric Welding.

3) Gas Cutting.

1.Heavy Motor Vehicle. D.I.

87/W/40964

2. Forklift Operator

I hereby state that the above informations are true to the best of my

knowledge.

(Sachin Kisan Wadkar)



Contact this candidate