DINESH VASANDANI
. Lexington, Kentucky *****
abnp5q@r.postjobfree.com . 859-***-****
QUALIFICATIONS PROFILE
Highly-accomplished, goal-oriented Project Manager with 13 years of experience in leading lean
manufacturing transformation projects and manufacturing operations for a global automotive manufacturer.
Extensive experience in streamlining business processes to improve operational efficiency, reduce
operating costs and lead times.
Special expertise in the Toyota Production System to achieve improvements in Value Stream and
supply chain resulting in reduced costs, improved margins, and delivery of quality product on time.
Results oriented, decisive leader, with proven success in strategic thinking and problem solving
Experienced in all aspects of Kaizen and lean manufacturing tools including Material and
Information flow, JIT, Jidoka, 5S, Kanban, Standardized work, Muda elimination, PDCA, Toyota
Business Practices and Sig Sigma
Successful, accomplished manager of projects ranging from $100K to $1.5 million
Languages – speak, read and write Hindi; basic Japanese.
PROFESSIONAL EXPERIENCE
TOYOTA MOTOR MANUFACTURING – Georgetown, Kentucky 12/1997 – Present
Smooth Motion Kaizen Assistant Manager 2/2006 – Present
Lead/coach SMK members and Production on major line improvement projects (Simplification, Model Line,
Model Change). Develop and use long term plans for Assembly’s future success and security. (Safety,
Quality, Productivity and Cost 3 Yr plans). Help set direction for Assembly with Processing, Logistic
layouts and Equipment design.
Key Achievements:
• Promoted to SMK’s Assistant Manger. (2/2006). Responsible for SMK and Project PE
groups.
• Successfully implemented full SPS on an Assembly line (1st in N.America for existing plant)
• Successfully converted Hoshin items into action plans for FY07. Currently in process of
creating 5 year plans for Safety, Quality, Productivity and cost to assist Assembly
management in creating FY08 Hoshin plans.
• Successfully completed Line 2 Simplification and improved Assembly PEFF through
temporary process reductions.
• Recognized for excellent communication and presentation skills. (TPS progress reviews,
NAPJM etc)
• Help set direction for number of processes for SIA. Created Process Diagnostics standard and
TPS training materials for SIA.
• Led 044L QAT (Quick Action Team) for smooth and quick ramp up of production. Assisted
Production assistant managers identifying bottleneck areas and made countermeasure plans.
• Led implementation of Final and Trim SPS in Assembly 2.
Smooth Motion Kaizen Specialist, 8/2003 – 2/2006
Teach Toyota Production System to Production and Assembly Engineering. Develop, Lead and Implement
major system Kaizen and Jishuken activities resulting in improved safety, quality, productivity and vehicle
cost. Research, design and implement innovative ideas to reduce manufacturing costs and shorten customer
lead times. Write bid specification for contract work. Supervise and direct contractors, SMK team members
to complete onsite electrical, mechanical, and pneumatic work.
Key Achievements:
• Selected as a member of the Smooth Motion Kaizen Group (8/2003). Lead and participated
various bottleneck countermeasure and value engineer activities.
• Successfully facilitated Jishuken, Kaizen Blitz and NAMC conferences resulting in improved
key performance indicators. Achieved “buy-in” from the floor employees and management
for kaizen plans.
• Develop, improve and maintain Process Diagnostic system involving a 32-item evaluation of
process resulting in identification of areas needing improvement. Supported IS team to
develop a database to track process diagnostics results and improvements.
• Designed, developed and implemented parts lighted pick system for over 1000 parts, resulting
in improved vehicle quality and reduced cycle time for kitting processes.
• Led design and implementation activity of first in-house built AGV’s at TMMK.
Successfully reduced the cost of AGV by 70%.
• Completed cycle-time studies and facilitated various process plans for Assembly department.
• Developed bid specifications for $1.5 million of contracted goods and services annually.
• Completed various conveyance/logistics kaizens resulting in process reductions and improved
traffic flow.
Assembly Engineer, 2/1998 – 7/2003
Provided line-side support for Assembly (Trim, Chassis and Final). Developed tool & jig designs and
modifications for new models. Monitored vehicle and parts quality problems, worked with Quality
Engineering to countermeasure supplier related part issues. Communicated and coordinated with vehicle
design to make changes to vehicle structure to improve safety, quality and ergonomics.
Key Achievements:
• Lead Assembly Engineer for 2002 Major model change for Camry. Conducted and
coordinated countermeasure for over 1200 vehicle design changes for 2002 Camry.
Completed various equipment investigations, created bid specifications for modifications to
equipment to accommodate new Camry. Assisted and set standards for process planning,
prototype evaluation and Equipment design.
• Led Jishuken in Assembly 2 Chassis, implemented new PSA equipment for H-frame
tightening resulting in 1 process reduction.
• Led the training and implementation of full process digital assembly for 2002 Camry.
• Member of a Task force to improve Engineer Training
• Improved Assembly’s system for primary and backup tools, reduced number of tools used
lines-side by 15%.
• Designed and installed numerous Pokayokes to improve vehicle quality.
EDUCATION BACKGROUND
Bachelor of Science in Mechanical Engineering (1997) – Ohio State University, Columbus, Ohio
American Society of Mechanical Engineers – Member
Society of Manufacturing Engineers – Member
Society of Automotive Engineers, Baja Racing Team – Participant
Master of Science in Manufacturing Systems Engineering (Est 2008) – University of KY, Lexington,
KY
Computer Skills
Proficient in Microsoft Office (Word, Excel, PowerPoint, Access, Project)
Software – Arena 9.0, Delmia DA, RSlogix, Activeplant
Additional Skills
I am a quick learner, reliable, enthusiastic and passionate about TPS. I am good at taking charge of situation,
eliminating barriers to progress and delivering positive results.