NOEL SUSSKIND, PE, LEED AP
***** ******* **** **** ********, VA 20158 540-***-**** abnkwp@r.postjobfree.com
OBJECTIVE
Dedicated to excellence and creativity in the building process. Eager to contribute to the overall success
and profitability of a firm focusing on sustainability.
SUMMARY OF EXPERIENCE
During my career I have been involved in hundreds of building design, construction, and economic
projects. My experience includes all design and construction phases of costing, contract bidding and
negotiation. I have conducted hundreds of surveys and energy analyses of building systems and
produced recommendations for improving efficiency. I am formally trained and knowledgeable in software
and the use of Building Information Models for design, documentation, and analysis and have created
databases and software for construction estimating and value engineering purposes. Involved with data
translation issues, and worked with the ASHRAE technical committees to create standards for GBxml.
I am particularly proud of my experience in Energy Modeling. Project examples (using E-Quest, Carrier
and Trane Trace) include: Wildwood Community Center (NJ), Inman Middle School (Atlanta), Defense
Personnel Supply Center, Lenfest Mastery School, Fels High School, Samuel Fleisher Memorial,
Grumblethorpe House, Physick House, (Phila.), One Justice Plaza (DC), Reston Heights (VA), Reardon
Dental Office Bldg (PA), Santa Fe Community College (FL).
EMPLOYMENT CHRONOLOGY
TOLK Engineering Inc. (DEWBERRY), Fairfax, VA 2007 - 2009
Senior Project Engineer involved with a wide variety of commercial, government and institutional
assignments including:
One Justice Plaza, Washington DC. (GSA lease by Boston Properties)
Mechanical design, included requirements analysis, design engineering, energy modeling and
construction documents for an 11-story, 520,000 sf shell and core phase of office building. Design
included heat recovery, variable flow air side and water side, with optimal chiller and water system design
for higher overall efficiency.
Fort Belvoir Community Hospital Central Utility Plant, Fort Belvoir, VA
Designer of steam, chilled water and emergency power generation. This plant serves the 400-bed military
hospital, two ancillary clinics and an office building, and included 4-500 horsepower dual fuel high
pressure boilers and 4-2 megawatt diesel powered generators.
Arora Consulting Engineers, Chadds Ford, PA 2003 - 2007
Senior Mechanical Engineer for such projects as:
Samuel Fels High School, Philadelphia, PA. Mechanical engineering included requirements analysis
and construction documents. Design included 4-pipe hydronic systems, VAV systems, CV systems, and
kitchen exhaust. Achieved minimal system life-cycle costs. Value engineering was key on this 248,000 sf
project, keeping to a total budget under $65 million.
Residential Sound Insulation Program - PHL Airport, Philadelphia, PA. Implemented policies of the FAA
program to insulate residences and add new HVAC systems to homes in the airport flight path. Included
surveys, meetings, evaluations, and design and field coordination. Cost, health and comfort were
considered to create an optimal solution for homes in the pilot program.
Williard, Division of Limbach, LLC, Jenkintown, PA 2003 – 2007
Director of Mechanical Engineering, lead engineer and resource in the design-build department.
Conducted value engineering, feasibility studies and designs. Representative projects included Lenfest
Mastery Charter School mechanical systems design build on a conversion of a 5-story office building in
Center City, Philadelphia (55,000 sf). For the South Jersey Regional Medical Center, developed
engineering alternatives. Accepted value engineering saved $350,000 in hard costs.
Contract Engineer 1993 – 2001 & 2003
Philadelphia, Atlanta, Jacksonville
Lead up to four designers or self-performed design, construction and peer review of HVAC and plumbing
systems for a variety of building types. Notable projects included: Sam Nunn Federal Building, Grady
Memorial Hospital, Fulton County Detention Center, Careflorida Healthcare, Wellborn Cabinets.
Contracts with Javan-Walter, Wick-Fisher-White Engineers, City of Philadelphia, Pa; Heery Engineering,
Sunbelt Engineering Group, Stellar Group, The Haskell Company, Bosek & Gibson Associates, Bell
Constructors, and Byatt Construction Co.
Ang Associates, Philadelphia, PA 1989 – 1993
Senior HVAC Designer involved with HVAC design, specifications, cost estimates, construction
administration and project management, studies. Involved with Terminal A (baggage, ticketing and
terminals - 500,000 sf) Philadelphia International Airport, Northeast Philadelphia Prison and renovations
to the Federal Courthouse in Philadelphia. Other clients included US General Services Administration, US
Army Corps of Engineers and the Southeast Pennsylvania Transportation Authority.
Henkels and McCoy, Blue Bell, PA 1988 - 1989
Senior Mechanical Designer/Assistant Project Manager and lead designer for HVAC and plumbing.
Involved with field surveys, designs, estimates, layout and specifications, construction phase services,
project management and client relations. Worked on multiple projects at Fort Dix, NJ and in Philadelphia
in military and industrial sectors.
Seeler-Smith, Atlantic City, NJ 1985 - 1988
Project Designer involved with HVAC design and specifications, construction phase and project
management. Projects were performed in military, educational and government sectors. Clients included
Princeton University, Rutgers University, State of NJ, and the US Army Corps of Engineers.
Ron Franke Architects. Medford, NJ & Altemose Construction, King of Prussia, PA 1984 - 1985
Architectural Designer involved with design and detailing of commercial construction projects including
floor plans, building sections and wall details. Also developed millwork details for upscale restaurants and
bars, and site plans for residential subdivisions.
Environmental Systems Design, Chicago, IL 1979 – 1984
HVAC Designer on projects in commercial and industrial sectors. Clients included Continental Illinois
Bank, Grainger, United Airlines, Kemper Insurance, Motorola, Illinois Bell, US Army Corps of Engineers
and many architects. Involved with total renovation of the historic Santa Fe Railway Exchange, my first
significant project role.
Precision Controls, Cleveland, OH 1978 – 1979
Design, drafting and layout of pneumatic, electric and other building controls. Take-offs, cost estimates
and competitive bids, inventory control, and prototype builds for specialized controls arrangements.
REGISTRATIONS
Professional Engineer: Virginia, Maryland, Pennsylvania, Georgia, Delaware
LEED Accredited Professional (Leadership in Energy and Environmental Design from GBCI)
Council Record at the National Council of Examiners for Engineering and Surveying (NCEES)
EDUCATION
BS Environmental Design (Architecture and Building Science), Miami University, 1977
BS Computer Engineering, Univ. N. Florida, 2000
PROFESSIONAL AFFILIATIONS
American Society of Heating Refrigeration & Air Conditioning Engineers (ASHRAE),
Association of Computing Machinery (ACM)
United States Green Building Council (USGBC)
I am proud of my work and commitment to the engineering profession. Please visit my portfolio at:
www.noelsusskind.com/portfolio.html