ROBERT SKOWRONEK
Two Harbors, Mn 55616
abm6ez@r.postjobfree.com
CONSTRUCTION SUPERINTENDENT
____________________________________________________________________
BTS Const. Mpls, Mn Walgreen’s Pharmacy. Fergus Falls, Mn $ 2,500,000
Diversified Const. Mpls, Mn. General Commercial Const. 5/23/06 thru 6/16/08.
Supervised retail work on: Famous Footwear, H&R Block, Pet Ranch, Anytime Fitness,
3 Restaurants, Daycare Center, Face Logic, 48 units of Condos in Mpls. 5 Assisted
Living Remodel Projects.
RESIDENTIAL PROJECTS
AADS / Jensen/Re Development 16 Units of Condos on Lake Superior
Two Harbors, Mn. $ 3,000,000
Dream Homes LLC 150 HUD and Section 8 Homes / Mpls, Mn. 2001-2004
COMMUNICATION PROJECTS
M.A. Mortenson Sprint PCS Switch upgrade. Detroit, MI. $500,000
M.A. Mortenson Allegiance Telecom. New long distance switch site. Portland, OR.
$4,000,000
M.A. Mortenson ICG Telecom. New collocation and transport switch site and remodel. Las
Vegas, NV. $2,500,000
M.A. Mortenson Sprint PCS. Remodel of existing PCS switch site. Detroit, MI.
$1,500,000
M.A. Mortenson Sprint PCS Construction of new PCS switch site. McAllen, TX.
$3,200,000
RESTAURANTS
White Construction Co. Whole Foods Inc. Construct new grocery store with restaurant
inside. San Antonio, TX. $1,650,000
Canyon Grill in Eden Prairie, MN. The Flame in Roseville, MN. R Norman;s in Mpls MN.
OFFICE COMPLEXES
White Construction Co. Book People Inc. Remodel existing store for new offices, sitting
rooms, books, etc. Austin, TX. $800,000
White Construction Co. EDS Inc. 3 new buildings for office use. Austin, TX. $3,800,000
White Construction Co. Austin Lyric Opera Theater. New and remodel. Austin, TX.
$2,700,000
HOSPITAL/CLINIC PROJECTS
DPR Inc. St David’s Hospital. / Austin, TX. Remodeling of existing doctors offices and
exam rooms. 1996-97
DPR Inc. Seton Hospital. / Austin, TX. Remodel of labs, construct new waiting rooms, labor
& delivery rooms, neo-natal and build new executive boardroom for the board members. 96-97
TECHNOLOGY/COMPUTER PROJECTS
DPR Inc. Advanced Micro Devices. / Austin, TX. Build-out and remodel of 20,000 sq. ft. of
office space, new kitchen area, cafeteria, and lunchrooms. 1996
_______________________________________________________________________
Jacobs Sirrine Inc. / Phoenix, AZ. Motorola 52nd street fab. Remodel of existing facilities
including new and used equipment hookups for wafer and chip productions. Build out of new
process piping, HVAC, electrical, and new class 10 and 100 clean rooms. 1994-96
Jacobs Sirrine/Robert E McKee. / {International}. Dublin, Ireland. Intel Fab 10 Sent over
to replace site super that was transferred. $600 million microchip plant including 60,000 sq. ft.
of Class 1 clean rooms. Also included new offices, cafeteria area, warehousing, and central
plant. Project received the 1993 EURO AWARD for safest job in Europe. 1993-94
Robert E McKee / San Diego, Ca. Pacific Biotech. In charge of constructing the Automated
Packaging line for their biomedical line. 1991-92
Robert E McKee / San Diego, Ca. Alcoa Electronics. In charge of constructing the Ceramic
Pilot lines which included clean rooms, office space, and manufacturing. 1991-92
HOSPITAL PROJECTS
Robert E McKee / San Diego, Ca. Kaiser Permanente Hospital Tower addition. Assistant
then moved up to lead super for this $25 million project, which included 290,000 sq. ft. 5 story
Clinic, and Hospital tower. Addition was attached to existing hospital. 1989-91
Robert E McKee / San Diego, Ca. Kaiser Hospital / MRI Division. Construct new MRI
facility with Siemens Co. 1991
Robert E McKee / Houston, TX. Methodist Hospital Tower. Assistant, then lead super on
this $70 million 10 story 300-bed tower. This is now the largest Methodist complex in the world.
1988-90
Robert E McKee / Taping Inc. Ft Worth, TX. Carswell AFB Hospital / US Corps of
Engineers. Assistant, then in charge of entire interior and remodel of existing 161,000 sq. ft. 5
story $40 million modern composite site. Responsible for all interior work from metal framing,
finish drywall, painting, all final finishes and final Corps of Engineers inspections. Job had 40-
month duration. 1984-88
_______________________________________________________________________
Training and Certs:
•Current CPR and First Aid
•30 HR / 10 HR OSHA
•8 hr. MSA health and safety Course
•OSHA Hazard Comm. 29 CFR 1910.1200 and T8 CCR 5194
•40 hr. HazmapWaste and Emerg. Course.
•8 hr. ETAC Health and safety for Supers.
•
AVAILABLE FOR RELOCATION OR TRAVEL IF NEEDED
Would be willing to pay for part of any relocation costs.
CURRENT REFERENCES: Available upon request