Post Job Free
Sign in

Project Manager Construction

Location:
Seminole, FL, 33777
Posted:
August 25, 2010

Contact this candidate

Resume:

RANDALL J. HILGEMAN

**** ******* *****

Seminole, FL 33777

Phone: 727-***-****

Email: ablr77@r.postjobfree.com

Position: Project Manager

Profile:

I have 15+ years experience in the construction industry, and an

extensive background in educational, automotive, commercial and

industrial construction. I have 19 years of Project Management

experience that has included Design/Build, Lump sum, and Construction

Management "At Risk" delivery formats. Capabilities include

development of contract costs for civil, structural and architectural

phases of a project. Extensive experience in contract development,

scheduling, budgeting, change order and RFI management, material

submittals. and administrative closeout of a project.

Education:

USMC Honorable Discharge

IVTC Technical College Welding Program

Carpenter Apprenticeship Program

Carpenters Local #90, Evansville, IN (19 years service)

Dale Carnegie Training Course

Building Contractors Exam

Administration:

Microsoft Word

Microsoft Excel

Microsoft Projects

File Maker

American Contractor

Employment:

2004 - 2010 Mathews Construction Tampa, FL

2001 - 2004 Suncoast Autobuilders Clearwater, FL

1999 - 2001 Q'ante Group Architecture and Construction

Clearwater, FL

References:

David Oellerich: President Mathews Construction, Tampa, FL

813-***-****

Glenn Little: VP Administrative Services

South Florida Community College, Avon Park, FL

863-***-****

Brad Garven: Project Manager

STH Architectural Group (Leo A. Daly Group)

561-***-****

Recently Completed Projects

. South Florida Community College, Performing Arts Renovation,

Avon Park, FL

$ 12.5 Million

Project Manager

Fast Track Project (Construction time frame ten months)

Complete interior and exterior renovation of the Auditorium

consisting of interior demolition and build out including,

new Theatrical AV, sound and light systems. Constructing a

new Building Entry, and complete renovation of the attached

Music Wing. Construction was performed while keeping the

adjoining Art Wing and campus Museum in operation.

. GE Plastics Plant, Mt. Vernon, IN (G.E. Flagship Plastics Division)

$ 60 + Million

Project Manager

Multiple in-plant projects totaling over $60 million built

over a 10-year period. Achieved valuable industrial

construction knowledge during this process.

. SABAL Park Corporate Express Distribution Center, Tampa, Fl

. Award Winning Project: 2007 NAIOP Outstanding Industrial Building

$ 10.5 Million

Project Manager

Complete development of a 15.5 acre site, including a 215,000

sf Warehouse / Distribution Center with an interior 15,000 sf

Office and Working Showroom. The concrete tilt wall building

included dock high access and an emergency generator system

able to power the entire facility.

. Christ the King, Tampa, Fl (Multi Phased Project)

$ 5.6 Million

Project Manager

Included a Parish Activity Center was the first building

constructed in this multi-phased project. The building was a

36,000 sf, three story structure.

Phase Two included a two-story Science Classroom and

Administration Building, with multiple covered walkways thru

out the campus.

. Plant City Police Headquarters & Facilities Maintenance Facility

$ 6 Million

Project Manager

Design Build project included the conversion of existing

AutoNation facility to a new Police Station including jail

cells, indoor firing range, a 911 call center and

installation of the City's emergency operations center. Also

included was the City's Public Works Department - Vehicle

Maintenance and Repair Facility.

. Tampa West Industrial Center, Tampa, Fl

$ 7 Million

Project Manager

(TWIC) buildings 6 & 7 project consists of 15.25 acres of

complete site development with two (2) Warehouse/distribution

buildings utilizing concrete tilt-up wall construction.

These two buildings have a combined net of 231,120 sf of

space.

. Crown Honda, Pinellas Park, Florida

$ 3 Million

Project Manager

30,000 sf Showroom, offices, and service department

. Holler Automotive Group, Winter Park, Florida

$1.6 Million

Project Manager

Six Star - 30,000 sf interior office build out. This office

space is being used as the corporate headquarters of the

Holler Automotive Group.

. Lokey Volkswagon, Clearwater, Florida

$ 2.6 Million

Project Manager

28,000 sf showroom, offices and service department.

. Cook Moving Systems, Tampa, Fl

$ 2 Million

Design/Build project of 35,000 sf warehouse, and 2,000 sf of

office space. A pre-engineered building system was used for

the project.

. Fire Stations # 5 & 11, Charlotte County, Fl

$ 1.2 Million each

Phased Schedule: Design/Build construction of "Prototype"

Fire Stations. In the wake of Hurricane Charley, these

stations were constructed to meet Miami Dade wind speed

requirements.

. Fire Station # 2, Punta Gorda, Fl

$ 2.5 Million

Design/Build construction of approximately a 7,000 sf

facility, 2 apparatus bays, bunks for 6 Fire Fighters and EMT

personnel, separate office space for a community police

officer, fueling facilities for fire trucks, full emergency

generator backup, and decontamination facilities.

8524 Lantana Dr.

Seminole, Fl. 33777

727-***-****

Email: ablr77@r.postjobfree.com

Email

Randy Hilgeman

Project Manager



Contact this candidate