RESUME * BISWAJEET
s/o Kariyappa K. N
K. K. BISWAJEET
***, *. *. *. ****, Metagally P.O.,
Mysore-570 016.
Phone(India) :+91-821-****-***
Mobile(Kuwait):+965-****-****
Email : *********.********@*****.***
REF NO.:KWABB/PSP2869/2010-01 / KWABB/PSS2880/2010-01 / KWABB/PSS2880/2010-02
____________________________________________________________________________
OBJECTIVES : To obtain a challenging career in Instrumentation & Control / Automation Design
/ Engineering / Installation / Project commissioning, DCS Maintenance and Up gradation projects
in as Project Manager / Lead Engineer.
SUMMARY :
• Around 1 and years of experience in the field of design, development of application
software using Visual Basic 5.0, Oracle 7.3 and MS Access.
• Around 3 months of experience in the field of design, development of application software
using RDBMS Oracle 7.3, Developer 2000.
• Around 12 years functional experience as Engineer- Industrial Automation Services
(Instrumentation) and production engineer.
QUALIFICATIONS :
• B. E. (Instrumentation) from SJCE, Mysore University during 1993-94
• Trained by ABB University Singapore on Industrial IT, 800xA, SafeGuard415, AC450
• C, C++, OOP Concepts from INFORMATICS
• VB 5.0, RDBMS Concepts, Developer 2000, PL/SQL from TULEC
COMPUTER SKILLS :
• GUI : Wonderware (Intouch factorysuite), VB 5.0, Developer2000
• RDBMS : Oracle 7.3
• Reporting Tools : Crystal Reports Pro
• Operating Systems : Unix, Windows 95, NT 4.0, Windows 2000,XP,W7
• Languages : AMPL,C, C++,VC++,VB5.0,Macros programming.
• Others : Microsoft Office
INVOLVED IN THE FOLLOWING PROJECTS :
• Commissioning of Fire & Gas system AC415 in BHN (Bombay High North) platform, Bombay,
India.
• Commissioning of DCS AC450 + INTOUCH Wonderware in KIOCL mangalore, Karnataka, India.
• Commissioning of DCS AC450 + AS500 in Indian oil Petronas in Haldia, West Bengal, India.
1 6
RESUME 2 BISWAJEET
• Commissioning of Gas Recovery & Distribution Control System (GRP & GDP) using
Wonderware-Intouch factorysuite with ABB Masterpiece-MP 200/1 and GCOM for RSP-
Rourkela Steel Plant, Rourkela, Orissa, India.
• Erection and commissioning of field instrumentation and DCS (ABB AC450) AT JVSL-Bellary,
Karnataka. India.
• Commissioning of Field instruments and DCS (Baily Infi-90 Open) at JTPCL Bellary.
• PLC ladder programming using cimplicity + LM90 for GE-Fanuc.
• Commissioning of AC450 + AS500 in Glucose plant in Arasco, Riyadh, KSA.
• Maintenance of AC450 + INTOUCH WONDERWARE in the feedmill plant in Arasco, Riyadh, KSA.
• Commissioning of AC70 for Corn Cleaning Plant in Arasco, Riyadh, KSA.
• Worked as Senior Service Engineer in ABB Industries Pvt. Ltd. Singapore in various
projects
• Presently working as Sr. Engineer-Instrumentation in Bader Al Mulla & Brothers co. in Kuwait
since 19th Oct 2006.
MANUFACTURING :
• Involved in the Designing and manufacture of UPS systems, inverters, stabilizers
• Involved in the manufacture of photo sensor ICs, and maintenance of machinery involved
in the manufacturing process.
REFERENCES:
• ABB Singapore: Mr. Arun Sethi –Email:*****.****@*****.*** -Phone:(+65)98629470
• ABB India:Mr.Vemuri Madhav - Email:******.******@**.***.***
PERSONAL DETAILS :
• Date of Birth : 14.05.1971
• Place of Birth : Coorg, Karnataka, India
• Marital Status : Married (Have two Children)
PASSPORT DETAILS :
• Passport Number : Z 1232691
• Date of Issue : 22-06-2005
• Date of Expiry : 21-06-2015
• Place of Issue : Singapore
• Driving License : Indian and GCC.
SELF ASSESSMENT :
Innovative, Communicative, Logical, Assertive
WORK EXPERIENCE (IN CHRONOLOGICAL ORDER )
INSTRUMENTATION PROJECTS
Sr.Engineer-Instrumentation Bader Al-Mulla & Brothers Co. Kuwait
#1 Working as Application Engineer, in Various O & G projects in Kuwait
Clients : Kuwait Oil Company(KOC), & KNPC
Duration : since October 2006 till Date
Technical environment : ABB AC450,800XA; Allen Bradley Control Logix; GE-Fanuc PLC
systems, RX3i, RX7i, Cimplicity, LM-90-30,70…
2 6
RESUME 3 BISWAJEET
Engineer-Projects ABB Singapore
#2. WORKED AS SENIOR SERVICE ENGINEER IN ABB, SINGAPORE
Clients : Riau Prima Pulp & Paper, Indonesia, Shell PF Malaysia, & BP
PF Vietnam. SIAM paper mills Bangkok…
Duration : since April 2005 till April 2006
Technical environment : ABB AC800M,AC800F, 800xA, AC450, AC415
safeguard, AC70, freelance systems, AS500 Operator Stations.
Description : This Project Involved Commissioning of ABB AC450, and AS500 OS x 4 Nos.,
Job involved Programming and commissioning of the systems. The hardware involved the
commissioning of the AC70, AC450, freelance, ac800 M & F, 800xA & AC415, Loop checking,
programming and commissioning of the systems programs in consultation with the process
division of the respective company. ALL 5 AS500 OS for commissioning. Job also involved
commissioning of controller and display building using Advabuild for windows-NT4.0. and
installation of required developing environment.
Engineer-Projects Arasco Al-Kharj, Saudi Arabia
#3. COMMISSIONING OF AC70(in Corn Cleaning Plant) AC450 & AS500 IN THE STARCH AND
GLUCOSE REFINERY PLANT
Client : Arabian Agricultural Services COmpany, Alkharj, KSA.
Duration : since September 2001 till April 2005
Technical environment : ABB AC450, AS500 OS x 5 nos.
Description : This Project Involved Commissioning of ABB AC450, and AS500 OS x 4 Nos., in
the Starch and Glucose Refinery plant. Job involved Programming and commissioning of the
systems. The hardware involved the commissioning of the AC450, Loop checking, programming
and commissioning of the systems programs in consultation with the process division of Arasco
Al-Kharj. There were 4 AS500 OS for commissioning. Job involved commissioning and display
building using Advabuild for windows-NT4.0. and installation of required developing environment.
Engineer-Projects ABB, Bangalore
#4. COMMISSIONING OF FIRE & GAS SYSTEMS – AC415 IN BOMBAY HIGH NORTH
PLATFORM
Client :OilandNaturalGasCorporation(ONGC),Bombay High Platform.
Duration : 2 Months
Technical environment : ABB AC415 Fire and Gas Control System, AS500 OS.
Description : This Project Involved Commissioning, testing and troubleshooting and test of ABB
AC415 Fire and Gas safety system and building of GUI displays showing various safety modules
in co-ordination with Yokogawa Engineers and Rolls – Royce Engineers.
Engineer-Projects ABB, Bangalore
#5. COMMISSIONING OF AC450,AC31,IN INDIAN OIL PETRONAS, HALDIA, CALCUTTA,
WEST BENGAL.
Client : Indian Oil Petronas, Haldia, West Bengal.
Duration : 3 Months
Technical environment : ABB AC450, AC31, AS500 OS etc.
Description : The project involved commissioning of 4 AC450 NODES and AS500 stations in the
plant. This plant is a gas blending and filling plant with terminal automation. Commissioning
involved also the communication of various signals such as port communication by Radio, tank
level by radar, the electrical parameters by MODBUS, and TCP/IP. Job involved programming
and commissioning modbus, radio(using AC37), RADAR etc.
3 6
RESUME 4 BISWAJEET
Engineer-Projects ABB, Bangalore
#6. COMMISSIONING OF GAS RECOVERY AND DISTRIBUTION SYSTEM
Client : Rourkela Steel Plant (RSP), Rourkela, Orissa.
Duration : 3 Months
Technical environment : ABB MasterPiece-MP200 Controller, MasterView850 Opera-
Tor Station, WonderWare-Intouch FactorySuite Operator
Station with GCOM Server.
Description : This Project Involved Commissioning of ABB MasterPiece-MP200 Systems in
RSP Rourkela, for Gas Recovery Plant and for Gas Distribution Plant for Controlling the
recovery of toxic CO (Carbon Monoxide) gas into the Gas Holder System and Distributing them
to the downstream stations such as Power Plant and Oxygen production plant as per
requirement. My responsibilities involved Developing System Software for MP200 using AMPL
(ABB MasterPiece Languange) which is a higher level language consisting of functional and
logic blocks performing individual tasks as per logic. And developing the Graphical Mimics
(Screens) using WonderWare - Intouch factorysuite Development Environment for Gas
distribution System. Development Involved Graphics building and configuration, Alarms creation
& configuration, Creation and Configuration of Realtime and Historical Trends and trouble
shooting. Also the task involved development of mimics using ABB MasterView 850 and Overall
troubleshooting and maintenance of Total System including Wonderware - Intouch, GCOM &
MP200.
Engineer- Projects ABB, Bangalore
#7. COMMISSIONING OF ECS IN THE HPLCL ELECTRIC SUBSTATION AUTOMATION
Client : Haldia Petrochemicals Ltd.- Cogeneration Power Plant
Duration : 6 Months
Technical environment : ABB-ECS: AC-450 Controller, AS 500 Operator Station
Description: The project involved the commissioning of ECS which included AC450 controller,
AS500 operator station. ECS commissioning included commissioning of the AC450 controller in
the main subsation and that in the CCCPP- Control Room. Project involved a no. of
modification in the PC programs, modifications in the PC elements, DB elements using On-Line
Builder, Function Chart Builder, Multi Edit, S100 Edit, Generating Source Code, Conversion of
Source Codes into controller m/c codes etc. Job also involved commissioning of various
communication loops such as P & B Xcell Relays for measuring various electrical parameters,
7SJ, 6MB protection relays, Alcarity meters-in the 6.6kV Voltage level, ABB SPA-COM protection
relays-132kV, 33kV voltage levels. The commissioning also involved the data communication
with Tata Honeywell DCS - GUS.
Project also involved commissioning of Synchrotact, and SKE 11 Relays for Breaker
synchronization. Various Trend generations, Data base and PC program creation starting from
scratch and Loop checking are some of the other jobs was have involved in the commissioning.
#8. ERECTION AND COMMISSIONING OF FIELD INSTRUMENTATION
Client : M/S Jindal Vijayanagar Steels Ltd., Bellary.
Duration : 1 year
Technical Environment : ABB (Advant 450) DCS, EWS, OIS
Description : This project involved erection of different field instruments such as temperature
transmitters, pressure transmitters, various level sensors such as capacitance type, inductive
type, and nucleonic gauges(Dr Berthold), proximity sensors(Endress+Hauser), solenoid valves,
orifices etc. and commissioning of all these field instruments.
Responsibilities : Over looking of the erection and commissioning jobs in compliance with the
P & I Diagrams, hook-up drawings. Supervisions of Terminations of the numerous cables
connecting these devices with the marshalling and with DCS as per the Loop Diagrams,
calibrating and examining the performance of these devices
Sr. Engineer-Projects at Innovative Controls (p) Ltd., Bangalore
#9. PLANT INFORMATION AND DATA GATHERING SYSTEM
4 6
RESUME 5 BISWAJEET
Client : Mangalore refineries and Petrochemicals Ltd., Mangalore
Size : 3 Members
Duration : Sept 1998 to Mar 1999
Technical environment : VB 5.0, Oracle 7.3 and Crystal Reports Pro
Description : This project Data Gathering was carried out for Mangalore Refineries
Petrochemicals Ltd. (MRPL).MRPL has 8 process areas in their plant, where each area is
assigned to one Universal Station (US). The US is Tata-Honeywell DCS (Distributed Control
systems).The project consisted of gathering data from each universal station and placing the data
at the back end Oracle Server. The data collected from the printer port of US is in ASCII format
and is stored in the Oracle database Server after conversion. The data is collected from each US
through an 8-port Multiplexing Card via RS 232C cables.
The US is sending data every hour and daily average is also calculated for whole day’s data.
This project also involved Plant information system. Data collected in Data Gathering project is
being used to display on different graphics, trends, reports that are having different tools.
Graphics include a Process Industry’s flow diagram. These drawings are drawn using a graphics
builder, after building the same, editing is also possible. The data in the server is used as process
values displayed along with drawings. Customised reports and calculation blocks are developed
using the same data.
Responsibilities : Design, Development, Analysis, Testing, Graphics, trends & Reports.
OTHER WORK EXPERIENCES (In Detail)
Sr. Engineer - Projects at Innovative Controls Pvt. Ltd., Bangalore.
Projects:
#10. COMMISSIONING OF FIELD INSTRUMENTS AND DCS
Client : M/S Jindal - Tractabel Power Company Ltd. (JTPCL),
Bellary
Duration : 1 Year
Technical Environment : Elsag-Bailey Infi-90 DCS, EWS, AND OIS
Description : This project involved commissioning of the INFINET Loops of infi-90 from various
kinds of field instruments such as pressure transmitters, temperature transmitter, level
transmitters, and various types of sensors to the DCS termination unit as well as from DCS
termination units to the OIS( Operator Interface Station).
Responsibilities : Debugging of configurations, tuning of logical blocks and supervision of various
installations of allied modules.
#11. INVOLVED IN VARIOUS OTHER INSTRUMENTATION ACTIVITIES.
Client : GE fanuc, Bangalore.
Duration : 3 Months
Technical Environment : GE Fanuc PLC Modules, Cimplicity, LM 90.
Description: Project invloved PLC Programming, using LM90 and Cimplicity, Testing of Modules.
Client : Reserve Bank India Project-BRBNML, Mysore.
Duration : 3 Months
Technical Environment : Fire Alarm Systems, components.
Description: Project involved Erection and commissioning of Fire alarm sytems and its supporting
accessories.
MANUFACTURING
Sr. Engineer - Production at Quantum Power Systems (ISO 9001), Bangalore.
#1. INVOLVED IN ALL THE PRODUCTION ACTIVITIES.
5 6
RESUME 6 BISWAJEET
Duration : 1 year
Responsibilities : Management of Production,Testing,quality Control and servicing
of UPS systems, Inverters, Stabilizers as well as material
management.
Engineer - Manufacturing at Opto Circuits (I) Pvt. Ltd.(ISO 9002), Bangalore.
#2. INVOLVED IN ALL THE PRODUCTION and MAINTENANCE ACTIVITIES.
Duration : 1 and years
Responsibilities : Supervision of Production of OPIC sensors(optical ICs) which are used in the
computer mouses as well as maintenance of Automatic gold wire ball bonding m/cs(Kulicke-Soffa)
and injection molding m/cs(Kras-Asia) which are involved in the production of these ICs.
6 6