Santhosh Balasubramanian
abhtvr@r.postjobfree.com
Phone: 217-***-****
Address:**** ******* ****** ****, ** 94598
Career Goal: To become a successful Engineering Manager, and eventually
become a Director of the Engineering Department and deliver new Products
and services in time and with quality.
Education:
Masters in Manufacturing Engineering Systems(New Product Development &
Product Management), Western Illinois University, Macomb, IL-USA (AUG
2005- JULY 2006). WEBSITE:www.wiu.edu
GPA-3.6
Department Topper
Outstanding Graduate Student Award of the year 2005-2006
Outstanding CAD Educator.
Bachelors in Engineering (Production Engineering, Mechanical &
Electronics/ Electrical engg), Government College of Technology, India
(AUG 2000- MAY 2004). WEBSITE: http://www.gct.ac.in/
GPA- 3.8
Experience:
I have more than 4 years of Advanced Manufacturing Engineering
Experience
Agilent Technologies (Formerly Varian Inc) Advanced Manufacturing
Engineer, CA,USA (OCT '06 - PRESENTLY WORKING)
Responsibilities in more detail: Product Manufacturing Engineer for MRI
front End Product/Console. Come up with better Product Structure,
Interconnect drawings, improve the installation and service of the product.
1.Responsible for reviewing drawings, 3D model from R&D department and
release them for production. Responsible to transition a product from R&D
-> Prototype->Pilot-> Production. This involves using drafting Packages
like AutoCAD, Inventor, Solidworks. This involves BOM(Bill of Materials),
Complete Assembly Packages 2.Responsible to maintain the product in
production till the production cycle ends for the specific product.
3.Responsible for the cost reduction of the inventory in the production
floor.
4. Responsible for ECO (Engineering Change Orders), NCR (Non Conformance
Reports), ER(Engineering Releases), Procurement, Material Management in the
production floor, Engineering Services( record all the assembly
procedures).
5.Responsible for CE /Safety testing coordination. Responsible for solving
Engineering problems on the production floor along with R&D.
6.Maintain Production Line, support supplier management. Have Managed
Projects to release products, Manage production line, Manage quality
control.
7. Responsible for releasing PCB's and establishing Functional test
Fixtures for Boards.
8. Responsible to establish functional tests and fixtures for Analytical
Instruments.
9. Prepare Test Procedure for Power Supplies, Amplifiers (Gradient
Amplifiers, Power RF Amplifiers), Transformers, Cables . Design LMR 240,
LMR 400 cables for reduced cable transmit loss. Very Familiar RF amplifiers
- CPC amplifiers, Herley AMT amplifiers. Gradient Amplifiers- Copley
Control, IECO .
10. Prepare working and assembly procedure for Probes(MRI, coils).
11. Use SQC / SPC techniques and Fish Bone diagram techniques to find root
cause quality issues of the product and get them fixed as soon as possible.
12. Use Lean Techniques like Six Sigma to keep the quality of the incoming
materials( Factory). 13.Responsible for CE(Compliance Engineering/UL
Electrical Standards) /Safety testing coordination 14.Create and maintain
Assembly Manual and Documentation for the New Products Introductions(NPI)
15. Board release to the Supplier and work with Board Manufacturer for
debugging Part issues, ROHS issues, Trace Issues, etc. This involves using
PCB express software. 16. Support Installation of the Product,track
Product Installation and Solve installation issues. Support Service of the
installed product. 17. Prepare Mechanical, Electrical and Electronics
interconnects(Systems Level, Sub Unit level, Installation Level) 18. Create
Bay Maps and product configurations. I have created detailed Product
configurations for the MRI product that's used by Manufacturing, R&D,
Sales, Scheduling. 19. Cable Designing for the Product release. I use
Solid works/ CAD package to create Cables, pin outs, special testes to be
conducted to check the durability of the cable, frame out System level
cable tests, get special tools made for Crimping, Pin installations etc.
20. Supplier Management is also a very important part of my responsibility.
I have interacted and worked with more than a dozen of suppliers( Machine
Parts, Sheet Metal, Cables, Amplifiers, Transformers, Boards, tool and
fixtures designers). I have also worked with suppliers (in China,
Singapore) to outsource some less complicated Sub assemblies and maintain
those units.
Specific Bullet Points about achievements:
. FTMS Product Line (Fourier Transform Mass Spec) Product : Once Varian Inc
bought a new company which was doing Research and Manufacturing FTMS
products, I took the responsibility to understand the product, improve
the product and align to the Varian Product standards. I implemented New
Product process, Assembly,Installation and service manuals. We were able
to ship more than 20 instruments within 1 year.
. MRI Product, Preclinical/Animal Imaging Systems (Custom Solutions): Iam
currently working in the MRI product, where we take a customer order,
sell them Standard Animal imaging systems or prepare custom solutions for
them. I have successfully released new family MRI Probes and have
significantly improved the quality of the MRI probes. I have introduced
new Gradient Amplifiers, Power Supplies and Cables. I got a new PRODUCT
STRUCTURE prepared for the product and it is used by Marketing,
installations, engineering and Service departments. I have improved the
installation manual. I have Service Kits prepared for the Service folks.
Iam currently working on a lot of new products and I have implemented NEW
PRODUCT LIFE CYCLE process. This has significantly helped us to release
new products faster and efficient. We have shipped more than 10 newly
released probes and we have gotten very good feedback from the customers.
Awards:
* Agilent Valuable Employee Award - 2010 Year.
* Employee Appreciation Reward - (given by the MRI R&D team).
Manufacturing Engineer Intern - Methode Electronics Inc., IL, USA (May
'06 - Aug '06)
Description of work: Rework and testing of PCB, Production Planning and
Control, Work Cell Lay out designing, SAP integrated Manufacturing,
Assembly drawings, reviewing of drawings to release to production floor,
introducing quality control steps in manufacturing, documentation of new
processes and new products. I used PCB design tool( PCB Express) to clean
and improve the PCB designs. The main project that I worked on was to
review the PCB manufacturing process, Rework process and come up with an
implementation plan to reduce root cause problem and improve the yield rate
of the Boards. The final result of the project was that the boards had
Trace issues and need to change the locations of some board parts to
reduce noise that was causing the failure of boards. I also found that the
rework did not address the actual issue. When we implemented the correction
to the boards we reduced the failure rate of more than 4 different type of
boards by 80%. I also improved the Manufacturing process by implementing
cable modifications and brought in new suppliers.
Graduate Assistant - Department of Engineering Technology, Western
Illinois University, Macomb, IL, USA (Aug '05- May '06)
Description of Work: Responsible of teaching AUTOCAD 2D, 3D, Solid works,
SAP integrated Manufacturing, Poka Yoke, and Production Planning, Work Flow
Charts for Sub assemblies, Top - Down assemblies, . Work for the department
project "Agent Based Supply Chain Management".
Skills:
New Product Introduction (NPI)/ Product Life Cycle Process
SPC (Statistical Process Control) and Operation Sequencing
SQC (Statistical Quality Control)
DOE (Design of Experiments)
Lean Manufacturing
MRP and MRPII
CRP
Plant Layouts
Integrating Process Control with Manufacturing and quality
New Tooling design for reducing manufacturing lead time.
Supplier Management in the Manufacturing Environment.
Electro-Mechanics
Thermodynamics
DFM (Design for Manufacturing) concepts.
Assembly Flow charts
Product transition from R&D to Production.
Production Cost Control and labor charge accounting.
PRO-E (WILD FIRE MODULE)
AUTOCAD, SOLIDWORKS,INVENTOR (Design Modules)
Theory of operations
Fish Bone diagrams and Histograms
Calculations of Time standards for Sub assemblies and Final
Assemblies.
Cost Reduction strategies in the production environment.
Supplier Chain Management
Assembly Manuals and Assembly Procedures.
Project Management
PCB Express (for designing Boards)
REFERENCE:
1. Dr.Ralf Dirksen (Professor, Engineering Technology Department, WIU)
Email: abhtvr@r.postjobfree.com
2. Dr.Hunter (Professor, Engineering Technology Department, WIU)
Email:abhtvr@r.postjobfree.com
3. Mr.Scott Darrow, Manuafcturing Engineer,Methode Eectronics Inc,
Golden, IL, Phone:217-***-**** (EXT:34062)
Email:abhtvr@r.postjobfree.com
4. Government College of Technology
Address:
Coimbatore City 641013,
Tamil Nadu State,
Phone: 91-422-*******
Email:abhtvr@r.postjobfree.com
Website: http://www.gct.ac.in/
5. Methode Electronics
Golden Plant
1015 Country Road 2400
PO Box 157
Golden, IL 62339
Phone: 217-***-****
Fax: 217-***-****
Web: http://www.methode.com/carthage/indexpage2.html
6. Agilent Technologies --- CAN PROVIDE CONTACTS AND RECOMMENDATION AS
REQUIRED.