Summa ry:

Extensive experience in the Electrical and Instrumentation discipline performing Design,

P rocurement, Installation, Troubleshooting, Commissioning and Start-up activities. I have

created and redlined P& IDs and electrical one lines on Billion dollar projects both foreign

and domestic using SmartPlant and InTools software. I have preformed duties with

i ncreasing responsibility from a Technician, Supervisor, Manager, Designer, Engineering

Supervisor, Commissioning Manager and General Superintendent.

I have preformed within the Maintenance, Construction, Commissioning and Startup

p hase.

Education:

Candidate for Master Degree in Construction Engineering

Bachelor Degree in Electronic Engineering

Associate Degree in Electronic Engineering

Maintenance:

• Observed employee’s overall skills and developed t raining programs based on results

i n order to promote safe and efficient t roubleshooting methods.

• Analyzed plant equipment for misapplication of Electrical and Inst rumentation for

reoccurring failures, developed a plan forward to increase reliability and prevent

u nplanned shutdowns on all electrical and instrumentation applications.

• Installed and implemented several Computerized Maintenance Management

Systems (CMMS) to include Maximo, MP2, SAP and PMC. Used each system to

organize daily activities and t rend preventive maintenance and establish predictive

maintenance measures.

• Identified all maintenance activit ies for planned outages and developed a schedule to

meet outage demands, ensured all equipment and spare parts were available.

• Ensured all critical spare parts are identified and long leads i tems were available.

B rian R Burrows

abh7ab@r.postjobfree.com

111 Overview Dr

Greensburg PA 15601

801-***-****

• Issued reports to EPA for Air Emission Monitoring equipment to include SO2, Nox,

CO2, O2, and Opacity

• Developed cost analysis on equipment replacement, conducted feasibility studies,

j ustified and managed maintenance budgets in excess of 15million dollars.

• Managed the E& I activities at Power Generating Facilities, Hazardous Waste

Facilities, Chemical Weapons Disposal Facilities and Manufacturing Facilities.

Construction/Commissioning:

• I have held positions for EPC and PCM contracts, liaison between contractors,

develop level 1 schedules, identify critical path and ensure schedule criteria are met

• I have received and installed several DCSs to include Bailey, Emerson, Honeywell,

Siemens, Modicon and Delta V. Preformed Loop Check on Analog and Digital

circuits for smart plant protocol to include Devise Net, Profibus, Foundation

F ieldbus and Har t. Confirmed communication with all nodes.

• Calibrated all instruments used to measure Temperature, Pressure, Vibration, Flow

and Emissions for smart sensors and single loop controllers.

• PLCs to include Allen Bradley, Toshiba, Emerson and H i tachi. I am able to wri te

code using ladder logic and function block software.

• Electrical Apparatus to include Single and Three Phase Transformers, MCCs,

Medium and High Voltage Switchgear, Panelboards, complete UPS systems, Variable

F requency Drives, Autotransformers and soft start motor controls.

• I have commissioned various types of Generators to include Diesel, Steam Turbine

and Gas Turbine with Haywood controllers and associated relay protection.

E ngineering:

• Developed Instrument P& IDs and Datasheets using I NTools, Created Oneline

E lectrical Schematics, developed Installation and Termination details using Autocad

for

B rian R Burrows

abh7ab@r.postjobfree.com

111 Overview Dr

Greensburg PA 15601

801-***-****

• Thorough knowledge of DCS, ESD, F&G and SCADA systems generally incorporated

i n major oil gas projects.

• Developed I/O lists, cable schedules and cable t ray routing details.

• Developed and issued equipment specifications for RFQ, Analyzed equipment bids,

W itnessed Factory Acceptance Testing (FAT ) and Site Acceptance Testing (SAT)

I ssued detailed reports on findings.

• Preformed Field redlines and answered contractors request For Information (RFI).

• Preformed Short circuit, coordination, load f low, grounding, & harmonic studies

using ETAP

• Verified all terminations and Installation testing prior to energizing or powering up

equipment.

• Designed various cabinets for PLCs, H M Is and operator counsels, performed

detailed termination design and layout.

• All Designs are in accordance with IEEE, NEC, and RoK Standards

Work H istory:

Fluor 2008-Present General Superintendent

Saudi Arabia SIPChem Chemical EPC project, Nizhnekamsk Russia Taneco Refinery EPC,

PCM project.

Managed all aspects of Electrical and Instrumentation installation and commissioning.

Directed efforts of subcontractors

Made decisions on field installations

Managed all Engineering requests for Information

WorleyParsons 2006-2008 Engineer in Charge of Special Projects

Kazakhstan PFD, Tengiz Chevron Refinery EPC Project.

B rian R Burrows

abh7ab@r.postjobfree.com

111 Overview Dr

Greensburg PA 15601

801-***-****

Managed all instrumentation contractors for the installation of 80K instruments on well

heads, pipelines, Gas Compressor and main Refinery.

Assigned all projects that fell through the cracks and needed someone to complete them.

Completed installation on GE Frame 9 Turbine up to First Fire

Completed design and installation of Fiber Optics

Directed efforts of Electrical Subcontractor for the installation of 10Kv substation, Fire

and Gas Inst ruments, cable t ray, wire pulling and termination.

Supervised the installation of Honeywell DCS cabinets, terminations and startup

EG&G 2001-2006

Russian Chemical weapons disposal facility Commissioning Manager, created

Commissioning Plan with approval of Russian Commissioning Agency

Tooele Chemical weapons disposal facility Engineering Supervisor, managed a

s taff of engineers to ensure the safe and reliability of all utility systems.

Designed and approved upgrades to all systems.

I NEEL Nuclear reclamation project Instrument Engineer, Managed and Directed

contractor to ensure schedule and budget was on t rack for all electrical and

i nstrumentation.

Self Employed E& I Contractor 1999-2001

Teledyne Brown Army prototype project Dugway U tah E& I consultant

Huish Detergents Orion Project Galveston Texas E & I design engineer

B rian R Burrows

abh7ab@r.postjobfree.com

111 Overview Dr

Greensburg PA 15601

801-***-****

Safety-Kleen 1995-1999

Clive Hazardous waste incinerator Tooele Utah E & I Supervisor

Von Roll 1991-1995

WTI Hazardous waste incinerator, East L iverpool Ohio, E & I Technician

US Air Force 1983-1991

Base Power Plant, Gwinn M ichigan, E & I technician



Contact this candidate