Gerald T. Carrell

**** ****** **** *****

North Las Vegas, NV. 89084

Home: 702-***-**** Cellular: 702-***-****

ab8gez@r.postjobfree.com

PROFESSIONAL OBJECTIVE

PROJECT SUPERINTENDENT

PROFESSIONAL SUMMARY

With a genuine passion for construction, I am a highly motivated, result

driven professional, blending education and 25+ years of hands-on

experience. I have worked on projects ranging from multi-million dollar

heavy road construction, to multi-million dollar civic, hospitality,

industrial, and tenant improvements.

.Ability to read and analyze blueprints .Great problem solving

skills

.Keen eye for detail .Strong oral and written

skills

.Deadline and safety oriented .Computer and

AutoCAD skills

.Willing to travel as necessary

.Ability to work alone or as a team

.Willingness to work any hours (days, nights, or weekends) to meet

deadlines

.Reputation for unsurpassed loyalty, dedication, professional ethics, and

integrity

.OSHA 30 Certificate

PROFESSIONAL EXPERIENCE

?Yack Construction, Inc. N. Las Vegas, NV.

2007 to 2011

Project Superintendent

Working for a family owned General Contractor as superintendent running

projects up to one million dollars, consisting of commercial expansions,

new construction, tenant improvements and home improvements.

.Comprised schedules to allow clients the ability to remain open

without disruption during

renovations or expansions (if applicable).

.Ensuring projects stay on schedule and budget by coordinating and

scheduling sub-

contractors and suppliers.

.Meet with, and stay in contact with, clients to keep them informed

of progress and make sure

their expectations are met and exceeded.

.Conduct weekly meetings addressing job safety, cleanliness, and

security.

.Ensuring building codes are complied with and scheduling of

inspections with proper

agencies (city or county).

.Submitting RFI's and change orders to PM as needed.

.Prepared daily progress reports.

.Prepared punch lists and ensured completion.

.Submitted paperwork to proper agencies for Certificates of

Occupancy.

Gerald T. Carrell

page 2

?D & G Drafting N. Las Vegas, NV.

2000 to 2007

Computer Aided Drafter - Owner/Operator

As an independent contractor working with local concrete companies, I

prepared fabrication drawings of Tilt-up panels working from architectural

drawings.

.Drew entire footprint of project locating all panels.

.Calculated dimensions for each panel including any openings,

ledgers, or connectors.

.Submitted RFI's when dimensions or connections did not match.

.Isolated each panel onto a single page to include all information

for fabrication team.

Equipment used: AutoCAD Rel. 2000

?Garfield Steel & Machine, Inc. Rifle, CO.

1998 to 2000

Structural Steel Detailer

Working from architectural blueprints, I prepared shop fabrication drawings

of steel columns, beams, and connectors.

.Submitted estimates for man hours needed to complete drawings to

Estimator or PM.

.Drew entire footprint of project locating all columns and beams.

.Calculated dimensions to ensure all columns and beams fit together

properly.

.Submitted RFI's to architect or structural engineer when blueprints

were inaccurate or in

question.

. Isolated each column or beam onto a separate page to include all

information for the

fabrication team.

Equipment used: AutoCAD Rel. 2000 with Beamer support program.

?Kiewit Western Co. Glenwood Springs, CO. 1992

to1998

Survey Party Chief

Worked on completion of final 16 miles of Interstate 70 through Glenwood

Canyon, from Gypsum to Glenwood Springs, CO. Work was consistent with state

D.O.T. standards.

.Preformed Traverse and Bench Loops to set control points.

.Topographical surveys were conducted in preparation for excavation

of roads and rest areas.

.Construction layout of roads were done to include location of

retaining walls and drainage

areas.

.Calculated cuts and fills for roadways and drainage areas and set

blue tops for final grade.

.Rest areas were laid out for construction to include buildings,

sidewalks, parking lots, and

bike paths.

.As-built surveys were preformed as construction was completed.

.Prepared and maintained detailed field notes and drawings.

.Set up a schedule to for checking and calibrating survey instruments

to ensure continual

accuracy.

Equipment used: Topcon total stations with data collectors and Topcon

levels.

Gerald T. Carrell

page3

RELATED EXPERIENCE

?Metric Engineering, Inc. West Palm Beach, FL.

Survey Instrument Person

3 yrs.

?Ken Tator & Associates Athens, AL.

Nuclear Coating Inspector

1 yr.

?Universal Construction Co. Decatur, AL.

Survey Party Chief

5 yrs.

EDUCATION

OSHA 30 Training Certificate Las Vegas, NV. Certificate

of Completion

Colorado Mountain College Glenwood Springs, CO. Computer

Aided Drafting

Certificate

of Completion

Northeast Alabama Police Academy Jacksonville, AL. Alabama

Police Officer

Training

Commission

Florence State University Florence, AL.

Business Administration



Contact this candidate