|
Resume alert |
Resumes 91 - 92 of 92 |
Singapore
... machining and pre-assembly works, construction (structural erection including mechanical equipment, piping, electrical 7 instrumentation systems installations), inspection, non-destructive testing (NDT), pre-commissioning and commissioning works. ...
- 2012 Jul 16
City, Singapore
... • Check & ensure that end preparation prior to welding as per approved welding procedures, Quality Control procedures, NDT procedures, Codes; standards are available at work site. • Check that all applicable equipments related to welding are ...
- 2012 Mar 31