OMOLE, ANDREWS O.
Address: **, ****** ******, ***** **** Badagry, Lagos State Nigeria.
Email: ad5oxf@r.postjobfree.com Mobile: +234**********, +234**********
Career Objective
Highly skilled Well Head Technician with exceptional technical, leadership and organizational skills seeking for an opportunity to grow my career in the Oil and Gas industry.
Core Competencies
Technical Skills:
A Well Head Technician, with 10+ years
experience in:
General well head maintenance,
Well completion and installation of x-mas tree
Installation and removal of actuators (Baker and Halliburton)
Well Intervention & Surveillance.
Wellhead Operations
Software: Matlab, Microsoft office, (Word, PowerPoint, Excel)
Soft Skills: Good innovative and analytical skill, creative thinking ability in decision making and problem solving, result oriented, ability to Adapt to changes, possess ability to work independently and as a team, Excellent communication and presentation skill with good organizational skill and attention to details.
Education
Master of Technology (M. Tech) Petroleum Engineering 2016 - 2018
Rivers State University, Port Harcourt.
Thesis: Prediction of Fines Migration for Enhanced Oil and Gas Production
Bachelor of Technology (B. Tech) Petroleum Engineering 2010 – 2015
Rivers State University of Science and Technology, Port Harcourt
Thesis: Modelling and simulation of Condensate Gas Reservoirs.
Conducted the investigation using mathematical model of Darcy equation for radial flow
Advanced Diploma, Safety and Security Management Jan. 2012 – Dec. 2012
Rivers State University of Science and Technology, Port Harcourt
Diploma, Safety and Security Management Feb. 2011- Nov.2011
Rivers State University of Science and Technology, Port Harcourt
Professional Experience
1. Sterling Energy Exploration and Production Company (SEEPCO), Nigeria
Wellhead Technician 2018 - Till Date
Beneku Oilfield, Umuseti Kwale
Monitoring of well parameters.
Daily production monitoring and production gain/loss tracking.
Ensure that the HSE policies, program, processes and procedures as per SOP/safety manual of the company are effectively implemented.
Calculate API, BS&W values, for well/field performance
Monitoring well pressure, monitoring for annulus pressure, checking for missing items on well heads, and arrange for replacement
Installation and retrieval of non return valves (TWCV and BPV) and VR plugs on well for well abandonment (well securing)
Carry out integrity leak on X-mas tree valves, wing valves and swap calves at the same time count valve turns in closed and open position to ensure they are okay.
Taking responsibility for BOP/tree/wellheads and tubing hanger interfaces
Responsibility extends to completion programmes
Maintenance and repair of support equipment during Frac operations (Generators, compressors, accumulators, grease manifolds)
Pressure testing and charting
Installation of conventional, multi-bowl and uni-bowl wellhead systems
Landing and testing of tubing strings
Understanding of Flange Torque operations and equipment
Packing-off secondary wellhead seals (P-seal)
Running and setting of mandrel and slip style casing hangers
Field cut casing with mechanical cutter as well as torch (cold and hot cuts)
Slickline/Well Testing/Pumping Operations:
Monitor and Support Slick- Line Operations in Aggu field.
Running of downhole memory guages,
Running and setting of gas- lift valves.
Drift run, FGS, SGS and Pay-zone change Operations.
Installation of Tubing Retrievable Surface Control subsurface safety valve (TRSCSSV) and termination of control line at the X-mass tree on OML 143, Okwuibome (OKW) and Anieze (ANZ) fields. Pressure Testing and function testing the TRSCSSV using the control line.
Support Pumping and Filtration Operations during Water injection, Hydraulic fracturing job in Aggu and Okwuibome fields(OML 143 & 146).
Identify underperforming GL/Self flow wells for immediate actions such as, GL optimization and dewaxing.
Ensure Optimized chemical injection rate in Wax prone wells in Aggu field
Achievement:
Executed Hot oil injection/ Bull heading through the tubing, Hot water injection through the annulus of the TCA as a way of dewaxing thereby increasing daily production performance by 10.2% representing 185 bopd. This translates into increased revenue earnings.
Spotting and Design of equipment layout for surface well testing and assisting in rig- up of equipment.
Spotting and rig–up of equipment for Production/Wellhead Operations
Routine check of well sample (sand check) BS&W Basic sediment and water and API
General knowledge of safety and accident prevention
Full knowledge of resolving Carry –over of fluid if it occurs both in production separator and flare scrubber separator.
Ability to calculate gas rate, Oil rate and Liquid rate.
Full knowledge of well optimization to enhance production rate
Good knowledge of gas injection /injecting the optimum amount of gas as per the needed MSCFD
Understand the process of changing and replacing plate in both junior and senior orifice box
Have a good knowledge of putting well clean-up (ACTIVATION)
Function test ACV’s before the commencement of operation
Taking gas sample and determine gas gravity
Ability to calculate of oil rates, Gas rates and cumulative Oil production.
Measurement of oil specific gravity, Gas specific gravity. Oil density (API grade), Gas/oil ratio (GOR),BS&W etc.
Sufficient knowledge of Surface Well Testing and Operations of test Separator and other Well testing equipment.
Schlumberger Nigeria Limited, Port Harcourt July 2012- Dec 2016
Role: Documentation Specialist for Nigeria and Gulf of Guinea Africa, Oil field Services
Job Description
Championed the transition from analogue to digital documentation and archiving Perform record/ documentation control for all Schlumberger entities, etc.
Ensure proper keeping of all oil and gas well logs from rigs, well site and other operational functions.
Ensure the safekeeping of client invoices from Total E&P, SPDC, NAOC, Exxon Mobil, Chevron and others.
Oversee the Archives of MI Swaco, Geo services and Cameron.
Coordinate the daily record request, retrieval and transmittal for the NGA.
CONFIDENTIALITY Protecting sensitive information from unauthorized disclosure, espionage or intelligible interception.
INTEGRITY Safeguarding the accuracy and completeness of information in both hard and software
AVAILABILITY Ensuring that information and vital services are available when required
Application of appropriate protection to information on all media
Provide pre and post job supports to engineers and specialists at the base location, including risk and incident reporting.
Professional Training and Certifications
OSHAcademy Hydrogen Sulfide Safety
OSHAcademy Basic First Aid
IADC Basic Offshore Safety Induction Emergency Training (BOSIET)
Schlumberger Advanced First Aid and Injury Prevention
Schlumberger New Employee Safety Training (NEST)
Schlumberger Record Management Training
Schlumberger Advanced Fire Fighting Technique
Interest and Strengths
Drilling/Well completion and work –over operations
Sub-Surface and surface Production
Workplace safety, proper house-keeping and injury prevention
Volunteer Service
Member, Society of Petroleum Engineers, (3543828) Port Harcourt;
oJoined SPE in 2012, RSUST chapter, section 103, being extensively involved in many SPE activities.
oSchlumberger Excellence in Educational Development (SEED) finance and logistics coordinator
o Attended several students Technical Conferences and Exhibitions, Workshops and Meetings.
o Visited several locations and facilities on excursion trips.
Referee: Available on Request